World Leader in Platinum Expansion : November 2002 PRODUCTION PROFILE 2003 - 2006 Anglo Platinum 28 November 2002.

Slides:



Advertisements
Similar presentations
China Petroleum & Chemical Corporation Q1-Q Results Announcement 28 October 2005.
Advertisements

July 18, 2008, Atlas Copco Group Q2 Results July 18, 2008.
1 FirstGroup plc Pre-close Trading Update for the 12 months to 31 March 2010 Wednesday 31 March 2010.
RESULTS FOR THE YEAR ENDED 30 JUNE KEY FEATURES  Platinum production up 7%  Revenue down only 0.6%  Dollar basket prices per platinum ounce.
2 1 Financial results for H Zagreb July, 2014.
QATAR ECONOMICS OUTLOOK AND PROSPECTS Sh. Abdullah bin Soud Al Thani The Governor Qatar Central Bank Adam Smith Seminar Paris, France, November 13-14,2007.
Agricultural Policy and Outlook Conference Series Cameron Thraen, OSU-AEDE Extension State Specialist Dairy Markets & Policy AEDE/OSU:
1. 2 WELCOME 3 Table of contents  Welcome  Salient features  Sustainability achievements  Financial review  Strategy ›Short-term challenges and.
City of Farmersville, Texas Water and Wastewater Rate Study February 2011.
Wesizwe Platinum – a Unique Chinese/South African Mining Partnership A Presentation for the Analysts Visit to the Bakubung Platinum Mine on Thursday 31.
A Growth Company Producing Rare Precious Metals Palladium & Platinum June 7, 2000.
The downstream fuels industry: Strongly competitive or operating with uncertainty? 8 March 2012.
BHCS EXPANSION September 30, EXECUTIVE SUMMARY BHCS proposes to improve competitiveness and increase capacity: –Plan expands med/surg beds, creates.
22 April 2010 EWEC 2010 Warsaw2 Jesper Munksgaard Ph.D., Senior Consultant Merit Order Effect of Wind Power – Impact on EU 2020 Electricity Prices.
Understanding and Valuating Exploration Companies 24 May 2007 Shane Hunter.
4.7 Billion Rand Investment In South Africa Driefontein 9 Sub-vertical Shaft Depth Extension and Kloof Extension Area Decline Shaft System 7 September.
UNRESTRICTED Financing of Nuclear Power Ala Alizadeh Atomic Energy of Canada Limited Nuclear Infrastructure Milestones Workshop November 2007 IAEA - Vienna.
Wesizwe Platinum Limited “Wesizwe Platinum – a “first of its kind” Chinese/South African Platinum Mining Partnership” A Presentation at the African Mining.
4/16/2017 SHERRITT INTERNATIONAL Ambatovy Nickel Project: A Progress Report March 2008.
October 29, 2004 China Petroleum & Chemical Corporation 3Q 2004 Results Announcement.
Agnico-Eagle Mines Limited1. 2 Growth Strategy Building Value Through Production and Reserve Growth Produce more gold targeting over 1.2 million ounces.
Mozal Aluminium Smelter. Smelter Location Project Overview 506,000 tpa primary aluminium smelter constructed in two phases Aluminium Pechiney AP30S technology.
1.  Welcome and introductions ◦ News from members 10:00-10:30  Northwest Gas Association 2011 Outlook 10:30-11:00  What has happened since last meeting.
Investor Presentation August Company Overview  Founded in 1953  TSX and NYSE listings: “NOA”  Current share price: $5.00  52 week high/low:
Investor Relations Presentation September INVESTOR RELATIONS PRESENTATION - SEPTEMBER 2002 Agenda Introduction David Calverley Chief Executive Highlights.
China Petroleum & Chemical Corporation Q1-Q Results Announcement October 31, 2006 Beijing.
1 Full Year Results Presentation Full Year Ended 30 June 2006 ASX Code: SAI Thinking Business SAI Global Limited ABN:
29 April 2010 China Petroleum & Chemical Corporation Q Results Announcement.
China Petroleum & Chemical Corporation Q1-Q Results Announcement October 30, 2007 Beijing.
1 27 March 2013 MYPD3 Briefing Session – Portfolio Committee on Energy.
2 Agreement between Iscor and IDC  Structure of Kumba unbundling  Integration of Saldanha  Rights issue in Iscor post unbundling 26 September 2001.
Presentation of Results for the half year ended 30 th September th November 2001 Johnson Matthey.
CAD Grant Lynch Matt Bennett Lainie Vi. In 2000, the Bank of Canada adopted a system of eight pre-set dates per year on which it announces its key.
1 April 30,2004 China Petroleum & Chemical Corporation Q Results Announcement.
Sunshine Coast Regional District Development Cost Charges July 3, 2014 Infrastructure Services Committee Bob Twerdoff.
Ofwat – Protecting consumers, promoting value and safeguarding the future Ofwat City briefing 11 November 2008.
Presentation of Results for the year ended 31 st March th June 2003 Johnson Matthey 
Northwest Power and Conservation Council Slide 1 Accelerating Energy Efficiency To Reduce the PNW Power System's Carbon Footprint Tom Eckman Manager, Conservation.
Lavendon Group plc 2006 Preliminary Results Presentation March 2007.
1 April 29, 2005 China Petroleum & Chemical Corporation Q Results Announcement.
0 15 July The SKF Group Half-year results 2008 Tom Johnstone, President and CEO.
INVESTOR MANAGEMENT DAY – CONSTRUCTION MATERIALS 1.
Wachovia Capital Markets Seventh Annual Pipeline and MLP Conference New York, NY December 9, 2008.
Acquisition of NetBenefit (UK) Limited Analyst Conference Call June 6, 2012.
1 Public hearing on conditional grants and capital expenditure: 3rd quarter Presentation to Select Committee on Finance Northern Cape’s Department of Agriculture.
Johnson Matthey Presentation of Results for the year ended 31st March th June 1999.
Presentation of Results for the half year ended 30 th September th November 2000 Johnson Matthey E.
The Silver Market in The Silver Market (Jan 4 $17.17/oz) (Dec 30 $30.70/oz) The average silver price in 2010 was $20.19 per ounce The price.
Click to edit Master subtitle style Briefing by Rand Water: Analysis of Annual Report ~ Presentation to Portfolio Committee ~ 5th May 2010.
DWA - ORWRDP - Technical Workshop Mogalakwena Regional Raw Water Scheme (MRRWS) 21 Feb 2013 Ossie Rossouw Victor Couto Bertus Bierman.
Atlas Copco Group Q results January 30, 2014.
October 22, Atlas Copco Group Q3 Results October 22, 2004.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
Atlas Copco Group Q4 Results February 3, Page 2 February 3, 2003www.atlascopco-group.com Contents  Q4 Business Highlights  Market Development.
Nuclear Energy 2016: Status and Outlook
Default price-quality paths for gas pipeline services Briefing on the Commission’s final decision for financial market analysts 28 February 2013.
Construction in Vietnam – Key Trends and Opportunities to 2018 Market Research Report ©reportscue.
True-Up Service Fee Adjustment with OMI/Thames January 10, 2006.
Fourth Quarter / Full Year Earnings 2008 Kimberly Ross Chief Financial Officer March 2, 2009.
West Contra Costa USD General Obligation Bond Program Status Presentation to the Facilities Subcommittee June 11, 2013.
ГММ -1( а ) Li Jianfei. By 2040, the world and, in particular, countries which have large and technologically advanced economies – such as the USA,
TRANS-SIBERIAN GOLD PLC 30 June 2016 Annual General Meeting TRANS-SIBERIAN GOLD.
A macroeconomic overview
Eskom Holdings Limited Reg. No. 2002/015527/06
Presentation of Results for the half year ended 30th September 2002
Presentation of Results for the half year ended 30th September 2003
Reducing the European deficit of Platinum Group Metals (PGMs), by upscaling to industrial relevant levels a novel cost-efficient and miniaturised PGMs.
Second Avenue Subway Project Execution Strategy
DEPT OF PUBLIC ENTERPRISES
Presentation transcript:

World Leader in Platinum Expansion : November 2002 PRODUCTION PROFILE Anglo Platinum 28 November 2002

World Leader in Platinum Expansion : November 2002 Supply / demand review supports Anglo Platinum’s growth target to produce at a rate of 3,5 million ounces of refined platinum by end 2006 Targets remain achievable

World Leader in Platinum Expansion : November 2002 Platinum demand to grow strongly - Autocatalysts, primarily diesel (short term) - Jewellery (medium term) - Electronics & fuel cells (long term) Palladium demand to remain at current levels Rhodium demand expected to grow Platinum price likely to remain strong Palladium price dependent on Russia Rhodium price flat BRIEF PGM MARKET OUTLOOK

World Leader in Platinum Expansion : November 2002 AGREEMENT WITH GOVERNMENT

World Leader in Platinum Expansion : November key mining authorisation applications Court action on 2 - these authorisations now processed 2 further authorisations - process agreed Agreement reached on key 2 - Twickenham & Der Brochen MINING AUTHORISATIONS

World Leader in Platinum Expansion : November 2002 BEE groupings holding mineral rights adjacent to each project area will contribute those rights to the project. Within each project area a 50:50 JV will be established over portion of the area. The remainder of the project area will be developed 100% by Anglo Platinum. AGREEMENT WITH GOVERNMENT

World Leader in Platinum Expansion : November 2002 The BEE groupings will contribute rights plus 50% of the capital and operating expenditure on the JV project. Anglo Platinum received “credit” for excess ounces (depth adjusted) contributed. As a result of this credit Anglo Platinum will have satisfied its BEE participation requirements on any extensions to the Potgietersrust Platinum Mine. AGREEMENT WITH GOVERNMENT

World Leader in Platinum Expansion : November 2002 Negotiations with two BEE consortiums have commenced: - Paschaskraal JV adjacent to the Twickenham project - Booysendal JV adjacent to the Der Brochen project JV mine designs, planned production rates, capital costs and funding are under discussion AGREEMENT WITH GOVERNMENT

World Leader in Platinum Expansion : November 2002 BUSHVELD COMPLEX EASTERN LIMB Paschaskraal JV Booysensdal JV

World Leader in Platinum Expansion : November 2002 PASCHASKRAAL JV & TWICKENHAM PROJECTS Paschaskraal 50:50 JV Twickenham Project 100% Anglo Platinum

World Leader in Platinum Expansion : November 2002 BOOYSENDAL JV & DER BROCHEN PROJECTS Der Brochen Project 100% Anglo Platinum Booysendal 50:50 JV

World Leader in Platinum Expansion : November 2002 Delays associated with mining authorisations and JV negotiations have impacted on the rate of build-up to 3,5 million ounces per annum. A revised project suite has mitigated the impact but reduced the rate of production increase particularly in 2003 and Current projects, together with base production will take Anglo Platinum to a production rate of 3,5Moz Pt per annum by end 2006 and position the group for expansion beyond IMPACT ON EXPANSION

World Leader in Platinum Expansion : November 2002 PRODUCTION PROFILE

World Leader in Platinum Expansion : November 2002 PROJECTS: CURRENT STATUS Safety: LTIFR: 0,2 Waterval concentrator commissioned on schedule - exceeding design targets. Waterval mine into production - ramping up Modikwa Mine into production - very positive performance Modikwa plant commissioned - met design targets in first full month of operation. Mortimer plant completed - running at design rate. ACP into commissioning - good results Polokwane Smelter - construction going well Tailings Retreatment Project approved.

World Leader in Platinum Expansion : November 2002 PRODUCTION PROFILE BRPM RPM Tailings JV’s & other Modikwa Twickenham RPM UG2 Ph 1 Process division 2002 Base Production * Annualised rate achieved by 2006 year end: 3,5 m oz Increase over 2002 Base Total Remaining Capex JV funding Remaining Anglo Platinum Expansion Capex Production3 434 * CAPEX (R m) 2003 to completion Real 2003 terms (2 400) Pt Oz (000’s) Total AP** ** 100% attributable to Anglo Platinum (full mining to refining margin)

World Leader in Platinum Expansion : November PRODUCTION FORECAST BRPM RPM Tailings JV’s & other Modikwa Twickenham RPM UG2 Ph Production (Pt oz (000’s) Build up Duration Full margin Refining margin only

World Leader in Platinum Expansion : November 2002 COSTS CAPEX & PRODUCTION In the short term costs of labour and safety are increasing at rates well above inflation. That and the change in mix of ores will put pressure on costs. We are targeting unit cash operating costs on steady state operations to increase at S A cpi. Projects in ramp up phase – lower margins until steady state reached. Capital expenditure in 2003: - to maintain operations: R3,6 bn - to expand operations : R4,1 bn Refined platinum ounces in 2003 : 2,4 million.

World Leader in Platinum Expansion : November 2002 KEY ISSUES Regulatory approvals - mining licences - EMPR’s Time to conclude negotiations. Suppliers meeting delivery commitments. Project programme consistently reviewed and reported at financial results presentations

World Leader in Platinum Expansion : November 2002 Original announcement in 2003 terms CAPITAL EXPENDITURE (Rbn) 17,1 Revised total (2003 terms)21,3 Scope changes (incl time delays) Capacity projects for growth and / or replenishment beyond ,2 2,0 ORIGINAL ANNOUNCEMENT REVISITED

World Leader in Platinum Expansion : November 2002 Revised suite of projects and scope changes Certain projects still in ramp up phase by 2006 Ability to grow beyond 2006 provides significant flexibility PROJECT CHANGES SUMMARY

World Leader in Platinum Expansion : November 2002 RUSTENBURG PLATINUM MINES LIMITED TAILINGS RETREATMENT PROJECT

World Leader in Platinum Expansion : November 2002 RPM TAILINGS RETREATMENT Project details - Production per annum: oz Pt and oz Pd - Volume per month: / tons - Average grade 1 g/t - Capex: R1,6 billion -First production 2004, full production year project life Production sourced from Klipfontein and Waterval tailings dams Production processed by a new plant near Brakspruit

World Leader in Platinum Expansion : November 2002 RPM TAILINGS DAM SITES SLURRY/ MONITORING WATER PIPELINE RETURN WATER LINE Waterval tailings dam Proposed Hoedspruit tailings dam Proposed Concentrator Plant Klipfontein tailings dam Turfontein shaft Waterval Mine Brakspruit shaft

World Leader in Platinum Expansion : November 2002 RPM TAILINGS RETREATMENT Large bore auger drilling Drilling programme complete Plant design complete

World Leader in Platinum Expansion : November 2002 TAILINGS PLANT DESIGN

World Leader in Platinum Expansion : November 2002 QUESTIONS

World Leader in Platinum Expansion : November 2002 PRODUCTION PROFILE ANNEXURE 28 November 2002

World Leader in Platinum Expansion : November 2002 PROJECT COMPARISON & CHANGES Projects BRPM RPM UG2 Ph 1 Modikwa Twickenham Total AM, LEB, UN * 2000/1 Announcements Capex to 2006 (Rm) in 2003 terms** Capex to 2006 R m 2003 terms Process * Amandelbult, Lebowa and Union in current base ** Historic expenditure plus forecast expenditure in real 2003 terms Current Estimate Pt Oz ( 000’s) RPM Tailings JV’s & other Pt Oz ( 000’s)

World Leader in Platinum Expansion : November 2002 PRODUCTION PROFILE Anglo Platinum 28 November 2002