13. Februar 2009IPS Global Strategy for Peatland Management Amsterdam 1 Peat extraction in Germany subject to strict regulations and rules almost exclusively.

Slides:



Advertisements
Similar presentations
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Advertisements

Voluntary instruments Daniel Hajek 1.Environmental labelling 2.EMAS 3.Cleaner productions 4.Green public procurement 5.Voluntary agreements Voluntary.
Planning Permission Process and Procedures
Strategic Framework for Future Use of Peatlands Presentation to the Joint Oireachtas Committee on Agriculture, Food and the Marine 13 May
1 ¿QUÉ ES LA COLUSIÓN EN LICITACIONES? COLOMBIAN LENIENCY PROGRAMME Superintendence of Industry and Commerce
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
What SMS means for an Operator’s relationship with the CAA
IPCC Expert Meeting on HWP, Wetlands and Soil N 2 O Geneva, October 2010.
BS EN ISO 14001:2004 Madlen King BSc MSc MIEMA EMS Lead Assessor Lloyd’s Register Quality Assurance Ltd BS EN ISO 14001:2004.
No Offshore Wind Farm Without Certification European Offshore Wind Conference Dipl.-Ing. Matthias Laatsch Dieser Platz ist für Ihr Bild vorgesehen.
1 Proposed Waste to Energy Plant Planning Approval and Licensing Requirements Procedural Aspects Planning Procedure: Maria Lombard, Planning Consultant.
Copyright The Solution Foundry. All rights reserved. WELCOME TO ENVIRONMENTAL ASPECTS 101.
THE ADMINISTRATION, REGULATION AND ENFORCEMENT OF ENVIRONMENTAL LAW 1 ENVIRONMENT AGENCY; LOCAL AUTHORITIES; SECRETARY OF STATE 1 Environmental Law.
TURKISH ENVIRONMENTAL COMPLIANCE SYSTEM FEVZİ İŞBİLİR TURKISH NATIONAL COORDINATOR FOR ECENA DEPUTY DIRECTOR GENERAL DG FOR ENVIRONMENTAL MANAGEMENT TURKISH.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
S3: Module D Physikalisch-Technische Bundesanstalt Session 3: Conformity Assessment Module D Peter Ulbig, Harry Stolz Belgrade, 31 October.
0 1 ANDREA ALMAŠI Ministry Agriculture Nature and Food Quality Department of Knowledge The Netherlands.
Challenges and options John Couwenberg Hans Joosten Greifswald University Are emission reductions from peatlands MRV-able.
Current state on Harmonisation and Implementation/Enforcement of Environmental Legislation - Industrial Pollution Control in SLOVENIA Barbara Bernard Ministry.
Organ, body, authority Prof. Gyula Bándi. A reference to the competent organ or body, particularly to the competent authority, are part of legal regulation.
Croatian Report on new Environmental Protection Law Josipa Blažević-Perušić, B.Sc. Arch. State Secretary Anita Pokrovac-Patekar, B.Sc. Pharm. Senior Environmental.
AdriaMed Expert Consultation Interactions between capture fisheries and aquaculture Rome, Italy November st Coordination Committee (2000)
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
Frans Oosterhuis, 2012 EEEN forum, Leuven, 9 February 2012 Evaluating environmental law and policy in The Netherlands: experiences from the ‘STEM’ programme.
Emission control in Bulgaria The involved institutions at national and local (sub-national) levels in Emissions inventory are Ministry of Environment.
EPER reporting process in Hungary with emphasis on the experiences Edina Gampel Counsellor National Inspectorate for Environment, Nature and Water Budapest,
MINIMUM CRITERIA Project Manager Marianne Lindström, Bulgaria SYKE, Expert Services, Environmental Management Division.
ECENA First Plenary Meeting January, 2006 Zagreb, Republic of Croatia Forthcoming obligation related to implementation and enforcement of EU legislation.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
Italy: the new legislation on the remediation of contaminated sites F. Quercia, APAT Tour de Table NATO CCMS Pilot Study Meeting 5-7th June 2006, Athens,
WHAT SETS SUCCESSFUL FIRMS APART FROM THE PACK? Presentation to University of Canterbury November 2005 Arthur Grimes Motu Economic & Public Policy Research;
Strategy for Responsible Peatland Management Susann Warnecke IPS Communications Manager 11 January 2011.
Sustainable use of Estonian peat resources and environmental challenges Mall Orru The Geological Survey of Estonia.
INTRODUCTION TO CONCEPTS AND PRINCIPLES 1 Environmental Law.
Environmental protection Requirements regarding environmental protection Voivodeship Inspectorate of Environmental Protection in Szczecin May 2005.
United Nations Climate Change Conference in Copenhagen - COP 15 Restoring degraded peatlands to achieve GHG emission reductions Viktar Fenchuk Irina Voitekhovich.
World Intellectual Property Organization DCPPS 1 presented by Mr. Vladimir Yossifov WIPO NATIONAL WORKSHOP ON INNOVATION SUPPORT SERVICES AND THEIR MANAGEMENT.
ENVIRONMENTAL PERMITTING 1 Environmental Law. Environmental Permitting 2 Environmental Permitting (England and Wales) Regulations 2007 introduced a new.
Greenhouse Gas (GHG) Permit Training Other Aspects of PSD Title V Permitting.
Estonian Peat Association International Peat Association Commission of Mineral Resources of Estonia Engineering bureau STEIGER Erki Niitlaan Some legal.
16-17 November 2005 COSCAP – NA Project Steering Group Guangzhou, China 1 Co-operating with the European Aviation safety Agency.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
Ministry of the Environment and Conservation, Agriculture and Consumer Protection of the State of North Rhine-Westphalia Integrating Adaptation into Policy.
SEA in the Czech Republic Prague, 24 September 2008.
Twinning project ENEA – ENforcing Environmental Acquis Skopje, 19 th of November, 2015.
How to start with the implementation of IPPC Directive Czech Republic Czech Environmetal Inspectorate.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Monitoring Programme. What is monitoring? Environmental monitoring is the systematic observation, measurement and calculation of the condition of the.
ENVIRONMENTAL COMPLIANCE STRATEGIES’ ROLE AND IMPACT, ALTERNATIVES AVAILABLE TO SELF POLICE, OR MONITOR COMPLIANCE.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
A role for the Wetland Convention in Wetland Restoration in Wetland Restoration Christopher Briggs Secretary General of the Ramsar Convention on Wetlands.
Joint bodies according to the UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes Francesca Bernardini United.
All rights reserved CHAPTER - 2 DOING BUSINESS IN INDIA.
Achievements in IPPC Directive Implementation: problems and constraints Albania Ministry of Environment 3 rd BERCEN Exchange Programme for the Environmental.
The EU and Access to Environmental Information Unit D4 European Commission, Directorate General for the Environment 1.
Protection assessment of Natura 2000 network areas in Poland – main problems Marzena Modrowska Krzysztof Suliński Ministry of the environment in Poland.
AGENDA WORKSHOP OVERVIEW SURVEY RESULTS WETLAND SCENARIOS.
Creating the environment for business Assessment of the Implementation by the Member States of the IPPC Directive Advisory Group Meeting Friday 13 th January.
Ionathan Gusmini Shinhyeong You. Fact Pattern I: Issue R: Rules of Law A: Application C: Conclusion Argument for Plaintiff Argument for Defendant Case.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Mining Waste Directive.
Global Warming – The Broad Legal Reach of Initiatives to Reduce Carbon Emissions Worldwide Legal Issues Associated with Carbon Capture and Geologic Storage.
EU Certification Systems Dr. Friedrich Lüdeke, GLOBALG.A.P. Cairo, 12 June 2012.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment and Climate Change.
The Protection of Confidential Commercial or Industrial Information in Environmental Law: Analysis and Call for a Graded Concept of Protection Prof. Dr.
Global Solar Certification Network
Are emission reductions from peatlands MRV-able
Representative Measurements – AQ-Workshop Bucharest, July 2008
Project leader of the Nickel Risk Assessment
The – new – LIFE program (Integrated Projects)
Presentation transcript:

13. Februar 2009IPS Global Strategy for Peatland Management Amsterdam 1 Peat extraction in Germany subject to strict regulations and rules almost exclusively peat extraction from raised bogs peat is used for the production of growing media for commercial horticulture and potting soils for the hobby sector energypeat is almost no object in Germany peat extraction is conducted on 10% of the German raised bog areas

13. Februar 2009IPS Global Strategy for Peatland Management Amsterdam 2 Bog Protection Programme of Lower Saxony (about 95% of German Peat Extraction) inventory of all raised bog areas in the late 70ies protection of about ha of raised bogs in a close-to-natural-state and so-called ‘degenerated bogs’ as nature reserves at least another ha of raised bog areas shall be restored after peat extraction and classified as nature reserves

13. Februar 2009IPS Global Strategy for Peatland Management Amsterdam 3 Since 1981 in Lower Saxony only degenerated and drained bogs with agricultural pre-use and under the condition of rewetting and restoration after extraction are granted extraction permits.

13. Februar 2009IPS Global Strategy for Peatland Management Amsterdam 4 Permit procedures Investigations: mapping of flora and fauna assessment of the stratigraphy surveying of the surface and drainage installation of ground water measuring points forecast of emissions according to BImSchG (German law on noise, air pollution, vibrations) estimation of the archaeological situation

13. Februar 2009IPS Global Strategy for Peatland Management Amsterdam 5 Basic idea of permit procedure find measurements in order to avoid, reduce or compensate considerable disadvantageous effects on environment resulting from extraction find measurements to compensate the negative effects on nature and landscape Procedure is followed by large public hearings.

13. Februar 2009IPS Global Strategy for Peatland Management Amsterdam 6 Content of permit: the extraction period limiting factors on extraction, e.g. extraction borders and depth drainage measures restoration aims and measurements All permits given in the last 30 years include rewetting as compensatory measurement.

13. Februar 2009IPS Global Strategy for Peatland Management Amsterdam 7 Surveillance Representatives of the nature protection and, where appropriate, water authorities usually verify once a year whether the entrepreneur follows the rules laid down in the permit. Representatives of labour inspectorate and labour protection authorities visit the companies without prior notice in order to check measurements taken on labour safety. Companies have to pay fees for state surveillance.

13. Februar 2009IPS Global Strategy for Peatland Management Amsterdam 8 Existing certifications certification according to DIN EN ISO 9001 quality hallmark of the Dutch Foundation RHP environmental management system according to DIN EN ISO product certifications within the quality assurances of the Quality Assurance Association Growing Media

13. Februar 2009IPS Global Strategy for Peatland Management Amsterdam 9 Conclusions on certification Companies do already invest time and costs to a considerable extent in order to fulfil the requirements on extraction in an environmentally sound way Certification shall not lead to further restrictions and bureaucracy BTH/IVG is still working on a final position on this project and consequently is not able to make any financial promises.