AT Measurement Systems

Slides:



Advertisements
Similar presentations
. TYPICAL SUPERCONDUCTING MAGNET TEST SEQUENCE. PREPARATORY TESTS AT ROOM TEMPERATURE Lyre Test: Simulate Effect of Thermal Contraction in Cold condition.
Advertisements

AT Equ. Groups / AB-CO Control responsibility Sharing.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
MACHINES FOR CERN-LHC DIPOLES PRODUCTION CTE Sistemi CTE Sistemi Srl GENOVA - I Via Galeazzo Alessi, 5 Tel Fax
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Resistive magnet measurements & coils, manufacture.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Measurement Control and DAQ for Superconductors and Magnet labs SCLabs Adriaan Rijllart1 Adriaan Rijllart, for the EN-ICE-MTA section.
P. Fessia, S. Krog-Pedersen F. Regis, L. Rossi
Instrumentation for Magnetic Measurements” Review of Superconductors and Magnet Laboratories, May 2009 Page 1/7 Superconducting.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
MM planning for HiLumi-LHC L. Fiscarelli M. Buzio, O. Dunkel, T. Zickler 4 March 2015.
MA CS workshop Adriaan Rijllart1 LabVIEW integration into the LHC control system The LHCLabVIEW.
E. Gorskaia, P. Ferreira, A. Raimondo, H. Reymond, A. Rijllart NI-Days 2000, CERN Geneve, 26 October 2000 The Control Architecture for the LHC Dipole Series.
Review of superconductors and magnet laboratories Summary of measurements and instrumentation issues
Modelling and testing of circuit protection of new superconducting magnets for the HL-LHC project 1 st Workshop FTEC 2015 Alejandro Fernandez Navarro.
Magnetic Measurement Systems for the LHC Dipole Assembly Companies A. Rijllart, J. Billan, J. Garcia-Perez, D. Giloteaux, A. Raimondo, V. Remondino, H.
E. Todesco EXPERIENCE WITH FIELD MODELING IN THE LHC E. Todesco CERN, Geneva Switzerland Thanks to the FiDeL team CERN, Space charge th April 2013.
AT Control Forum First Meeting. Introduction  The AT Controls FORUM :  Is responsible for coordination of the overall strategy for controls activities.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
HTS for Upgrades: overview of test requirements Amalia Ballarino, CERN Review of superconductors and magnet laboratories, A. Ballarino.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
The MA section of AB/CO FirstEvent Welcome ! RADE Information Event Adriaan Rijllart (AB/CO) 2 Outline 10:00 The context 10:15 Introduction to RADE 10:35.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
Haixin Huang AGS Cold Snake: Status and Plans.
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
Workshop on Appraisal of Disassembled Magnets: Lessons learned March 17 th, 2005 Boundary Conditions-Technical Specification Jos Vlogaert.
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
- My application works like a dream…does it. -No prob, MOON is here. F
24/11/2017 Performance of the room temperature Systems for Magnetic Measurements of the LHC Superconducting Magnets at CERN J. Garcia-Perez, J. Billan,
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Integration of Mathematica in the Large Hadron Collider geometry database Jerome Beauquis Elena Wildner IMS06, 20 June, 2006, Elena Wildner.
11 T Dipole Integration & Plans M. Karppinen
The HL-LHC Circuits: Global View and Open Questions
LHC Hardware Commissionning
Contents Future requirements for magnetic measurements
Agenda 9:00  - Welcome ASG speaker 9:10 -  Introduction -       P.Fabbricatore 9:25 - The D2   magnets in HL-LHC   -  E. Todesco.
Experience: past events and accidents
Powering the LHC Magnets
Circuits description and requirements - Closed Session-
EN-ICE Technical Committee SM18 activities & projects
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
LHC OPERATION AND SUPPORT
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
FRESCA Facility for the REception of Superconducting CAbles
Review Bloc 4 and SM18 facilities and upgrade
Presentation transcript:

AT Measurement Systems AB-CO Viewpoint NOELL Würzburg SM18 23-09-05 AB/CO Review, Adriaan Rijllart

AB/CO Review, Adriaan Rijllart Colour code To be maintained until LHC completion To be transformed after LHC completion New projects for LHC operation support To be maintained beyond LHC completion 23-09-05 AB/CO Review, Adriaan Rijllart

AB/CO Review, Adriaan Rijllart The four categories To be maintained until completion: Measurement benches in industry (50 in total) To be maintained until completion and then transformed: SM18, Block 4 (and B181) New projects FIDEL - Field Description for the LHC (DB) FAME - Fast Measurement Equipment (LV-RT) To be maintained beyond LHC completion Cable, strands and Cryolab test systems 23-09-05 AB/CO Review, Adriaan Rijllart

AB/CO Review, Adriaan Rijllart LabVIEW Systems Systems in industry Magnetic measurements (Dipoles, Quads, Correctors) Geometric measurements (Bores, End caps, Feet) Electrical tests (Quench, Quench heaters, Isolation) But I’m quite sure that some of these systems will be reused for the Magnet Rescue Factory. 23-09-05 AB/CO Review, Adriaan Rijllart

LabVIEW Systems in industry QIMM8 CIMM5 CIMM10 CIQR1 CIQR2 CIQR3 CIQR4 50 systems in operation DGM1 DIMM2 TESLA NOELL Zeitz JEUMONT ACCEL QIMMSaclay1 QIMMSaclay2 QIMM7 EDMA3 EDMA4 NOELL Würzburg DIMM3 QIMM7 DGM4 DGM5 DIQH5 EDMA5 EDMA6 ALSTOM DIMM1 DIMM5 QIMM4 DGM3 DGM7 DGM10 DIQH3 EDMA1 EDMA2 DIMM4 DIMM6 QIMM5 CIMM9 CIMM11 DGM2 DGM6 CIQR7 DIQH1 DIQH4 EDMA7 EDMA8 ANTEC ANSALDO CIMM2 CIMM8 CIQR5 CIQR6 CIMM4 CIMM6 CIMM11 DGM 8 and 9 travel in between firms CAT, India 23-09-05 AB/CO Review, Adriaan Rijllart

LabVIEW Systems in industry TESLA correctors ANSALDO dipoles 23-09-05 AB/CO Review, Adriaan Rijllart

LabVIEW Systems in industry Noell, Zeitz (dipole cold-masses) ACCEL, Troisdorf (quadrupoles) 23-09-05 AB/CO Review, Adriaan Rijllart

LabVIEW Systems at CERN SM18 Magnet Test Bench applications (-> Magnet Rescue Factory) Test Master + Hardware Recognition: Applications to automate sequence from all systems HFDAQ, LFDAQ, AQA, HVT, MMP, LOSS, MRM New systems: FAME (implemented in PXI - LabVIEW-RT) On-line Hall plate DAQ 0.5 man*years On-line Rotating Coil DAQ 1.5 man*years On-line Fixed Coil DAQ ? To be maintained beyond LHC completion Warm magnet test bench, Calibration bench, File Server MTBNFS1 SC Cable Test Station SC Strand Test Station Central Cryolab test systems 23-09-05 AB/CO Review, Adriaan Rijllart

LabVIEW Systems at CERN High Temperature Superconductor test Corrector Magnetic Measurements High Voltage Isolation test Quench recording 23-09-05 AB/CO Review, Adriaan Rijllart

LabVIEW Systems at CERN Superconducting Strands test B163 Special magnetic and optical measurements SM18 Corrector cold tests Block 4 Magnetic Measurements SM18 23-09-05 AB/CO Review, Adriaan Rijllart

LabVIEW Systems at CERN SM18: Magnet Test Control Room B163- FRESCA: superconducting cable reception test 23-09-05 AB/CO Review, Adriaan Rijllart

Supervision and PLC Systems (Philippe + Hervé) Upgrade from PCVue to PVSS using UNICOS on PLCs SM18: Refrigerator and cryo for the benches (PLC S7) Block4: Cryo for the benches + PLCs (S5 to S7) To be maintained beyond LHC completion Manufacturing tools based on PLC for winding, collaring, and welding. Now at magnet industries, these tools need to be installed and maintained at CERN. 23-09-05 AB/CO Review, Adriaan Rijllart

Databases (Ronny and Maciej) SM18 + Block4 upgrade to Oracle 10 (? not desirable) Magnetic Measurement Data Reference tables HW Recognition: maintain + develop MS-DS SSS (ongoing) Magnet Rescue Factory and FIDEL HW Recognition: adaptation to low test rate, less complex Field description for LHC, 1 month cycle, measure analyse include in FIDEL (request of ABP) Later cycle time much faster (request of ABP) 23-09-05 AB/CO Review, Adriaan Rijllart

AB/CO Review, Adriaan Rijllart Conclusion Systems deployed in industry will return Some will be reused for the Magnet Rescue Factory Magnet Rescue Factory + SM18, Block 4 LabVIEW, PCVue+PLC and Database upgrade FAME and FIDEL LabVIEW-RT and Database Many presently running systems are to be maintained LabVIEW Cables, Strands, Cryolab, Warm measurements and Calibration systems PLC manufacturing tools systems Magnetic Measurement DB 23-09-05 AB/CO Review, Adriaan Rijllart