N-TOF review HVAC and cooling systems YB-JIG 15/06/07.

Slides:



Advertisements
Similar presentations
World Health Organization
Advertisements

Heating, Ventilating, and Air-Conditioning
Intelligent Air Handling Units AADTECH INDIA PRIVATE LIMITED
Make the most of your energy Head Office – Case Study.
Heat Recovery for Commercial Buildings
PLANT HVAC SYSTEMS DU-109-PP PLANT HVAC SYSTEMS.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Objectives Finish with ducts and fans Define project topics.
Industrial Ventilation - A major control measure Dr. AA, UTM.
Unit 6.2. Mechanical and mixed mode ventilation TB Infection Control Training for Managers at National and Subnational Level.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
1 MCC PRESENTATION - GMP MANUFACTURING ENVIRONMENTS Presented by : Deryck Smith Consulting Engineers Module 3.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
PLATFORM UTILITIES PAB 2073 Reference: PCSB/PMO document.
Technical Specification April 23rd-24th 2013Handling Engineering Group1  Technical documents during tender  Contract execution  Documents during contract.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
1 MCC PRESENTATION - GMP MANUFACTURING ENVIRONMENTS Presented by : Deryck Smith Consulting Engineers Module 2.
World Health Organization
N O R T H A M E R I C A C O M M E R C I A L TDP
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
World Health Organization
PSB Beam Dump Cooling Constraints Glen Mason EN-CV 30 August 2012.
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
Cooling and Ventilation Activities M. Battistin – EN/CV/PJ IEFC Workshop th March 2012 « CONSOLIDATION and UPGRADE PLANS for the INJECTOR COMPLEX.
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
N_TOF Technical Report INTC, CERN 21 May 2007 P. Cennini AB-ATB n_TOF Technical Coordinator Status of the old Target Removal Status of the old Target Removal.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
Vessel Wash Wastewater Management – Options for Marinas Presented by: Michael J. Danko New Jersey Sea Grant Consortium Virginia Marine Trades Conference.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Engineering Department EN 1 IT3853-EN Design, Supply of Ventilation Units and Smoke Extraction Systems for Building 192 Bidder’s conference – 29 th April.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL CERN TS/CV Wednesday 9 th July 2008 CLIC.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
N-TOF review HVAC and cooling systems Proposal to be validated by the project CERN TS/CV 13th February 2008.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Ullrich, DESY Dubna GDE XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Water cooling XFEL Desingn of the XFEL water cooling.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
HIE-ISOLDE Workshop: The Technical Aspects Target Area Infrastructure Ventilation 29 November 2013 Andrea Polato* - CERN EN-CV-PJ * The research project.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
Update on the PSB Cooling and Ventilation Systems
Demineralised water cooling system
EN-CV activities for LHC during LS2
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
BUILDING HEATING AND COOLING
Heating Ventilating and Air Conditioning
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
CV maintenance works during YETS
CEDAR Detector Ventilation System Review
Bidder’s conference – 21st May 2013
COOLING & VENTILATION INFRASTRUCTURE
HVAC EQUIPMENT General
East Area Cooling & Ventilation Status
Energy Efficiency in District Coiling System
High-rise Hotel Lobby Air Handling System
VED and VEDI VED and VEDI.
FCI and FCX Range FCI and FCX Range.
FCI and FCX Range FCI and FCX Range.
FCI and FCX Range FCI and FCX Range.
Air Conditioning System-1
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
B. Munkhbayar BEEC/SCEA/MUST
Presentation transcript:

n-TOF review HVAC and cooling systems YB-JIG 15/06/07

HVAC system

HVAC system proposal #1 Principle 100% recycling No pressure control Area treated comprise between doors 202 & 203 Air Handling Unit An access section with door A filter section An access section with door A filter section, absolute filter A fan section with centrifugal fan, and one speed motor Tapping for RP monitoring system Estimate Total : 35 kCHF

HVAC system proposal #2 Principle One 100% recycling AHU + one extraction AHU No pressure control Area treated comprise between doors 202 and 203 AHUs located in bldg. 375 Air Handling Units recycling AHU same as for proposal #1 Extraction to be designed in accordance with the RP requirements for contaminant dispersion. By-pass of the extraction filters for cold smoke extraction Estimate 35 kCHF (AHU1) + 40 kCHF (AHU2) + 15 kCHF (electrical) + 40 kCHF (CE works) Total : 130 kCHF Operating modes To be determined Smoke extraction policy to be defined

HVAC system proposal #2

HVAC system proposal #3 Principle One 100% recycling AHU + one extraction AHU + one fresh air AHU Differentiel pressure control Area treated comprise between doors 202 and 203 AHUs located in bldg. 375 Air Handling Units Recycling AHU, extraction AHU same as for proposal #2 Fresh air AHU fitted with heating and cooling coils Estimate 35 kCHF (AHU1) + 40 kCHF (AHU2) + 15 kCHF (electrical) + 40 kCHF (CE works) + 50 kCHF (AHU3) Total : 180 kCHF Operating modes To be determined Smoke extraction policy to be defined

HVAC system proposal #3

exhausts

Water cooling system

Water cooling system : proposal #1 Present state Contamination of the pipes with radioactive isotopes (higher degree of contamination in the lower part) Cleaning proposal Installation of a high capacity ion-exchange cartridge (200l) Circulation of water through the circuit (target removed) and recuperation of the contaminant in the resin If required, cleaning of the circuit with a nitric acid Waste disposal Regeneration of the cartridge and treatment of the regeneration wastewater (possibility to store the cartridge for a given time before treatment) at CERN If required, neutralization of the acid and treatment at CERN Estimate Around 15kCHF

Water cooling system : wastewater treatment

Water cooling system : proposal #2 Dismantling of the distribution circuit and installation of a new one (to be decided if the cooling station is replaced) Estimate Estimate based on CV contract pricelist : < 60 kCHF 3-5 weeks of work Constrains No CV Contractors qualified for this work Consequences Need to launch MS and IT (technical specification to be written, delay for the answers and signature of the contract, …) Planning : MS 6 weeks, IT 6 weeks, award of contract 3 weeks, works (incl. design + execution) 6 weeks

Summary TaskEstimateDuration (tendering + works) Ventilation proposal #135 kCHF10 weeks Ventilation proposal #2130 kCHF14 weeks Ventilation proposal #3180 kCHF17 weeks Water cooling proposal #115 kCHF- Water cooling proposal #2>200kCHF21 weeks