Variation Management of Key Characteristics Contents Key Characteristics definition Purpose Method for accomplishment Process Control Document form Structure.

Slides:



Advertisements
Similar presentations
1 The document represents the EMSWGs response to recommendation #12 o TOPs should take measures to ensure that their real-time tools are adequate, operational,
Advertisements

AS9102 First Article Inspection Report
Configuration Management
ISO 9001:2000 Documentation Requirements
Transition from Q1- 8th to Q1- 9th edition
PROJECT TITLE Project Leader: Team: Executive Project Sponsor (As Required): Date: Month/Day/Year 110/17/2014 V1.
MODELING THE TESTING PROCESS Formal Testing (1.0) Requirements Software Design Risk Data Approved, Debugged, Eng. Tested Code Automated Test Tools Tested.
Project Management Shuffle Directions: take the definitions from the following cards and write a song using the tune from “Cupid Shuffle”
PPAP Requirements Training
HR Toolkit Instruction Manuals Self- Serve Designing, Documenting & Delegating Critical Workforce Programs ©2015 Optimum Performance HR Consultants Sneak.
The Systems Analysis Toolkit
First Article Inspection Report
Variation Management of Key Characteristics
How to Document A Business Management System
Advancing Excellence in America’s Nursing Homes A Review of 2 Clinical Tools: Pressure Ulcer and Restraints.
1 Agenda: 09/01/2011 Finish preparing information visualization methods. Tables, diagrams, charts, bullet points Words vs. pictures vs. numbers Visualization.
Industrial Background Research Problematic Method Overview Key Characteristics Assembly Sequence Conclusion ADCATS Conference - 14/15 June 2001 Brigham.
FAA FAA Advisory Circular Presented at 9/16/03 Workshop (Chicago, IL) Background – Purpose of the advisory circular – Related regulations & guidance materials.
Major Exam II Reschedule 5:30 – 7:30 pm in Tue Dec 5 th.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
 User Manuals come in all types, designs and formats.  This presentation is designed to show a few basic elements that will serve any user manual. 
Huzairy Hassan School of Bioprocess Engineering UniMAP.
Managing Project Quality
Measurement System Analysis (MSA) Discussions at CSIR S.A
Guidelines for Carbon Fiber Tape Prepreg Specifictions W.T.McCarvill S.Ward August 6, 2002.
What is Business Analysis Planning & Monitoring?
Operational Excellence The Future?: …Process Management and Process Improvement.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
SLO Workshop #2. Overview Objectives for today: You will be able to..  Recognize well written components of an SLO  Practice the process of analyzing.
Introduction to Software Quality Assurance (SQA)
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Supplier Process Control.
NIST Special Publication Revision 1
Company Confidential Improvement Opportunities for Audit Reporting Tony Marino and Rick Downs July 19-20, 2012 Registration Management Committee RMC Workshop.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
Software Development Cycle What is Software? Instructions (computer programs) that when executed provide desired function and performance Data structures.
IS Analysis and Design. SDLC Systems Development Life Cycle Break problems into management review stages Control cost and time Works best with well understood.
Process System Capability An introduction to 9103 ‘VARIATION MANAGEMENT OF KEY CHARACTERISTICS’ Bernard LAURAS AIRBUS.
QUALITY MANAGEMENT STATEMENT
Michael Campe U.S. Army Aviation and Missile Command NDIA TID Technical Information Division Symposium Royal Sonesta Hotel, New Orleans, LA August 2003.
Responsiveness to Instruction RtI Tier III. Before beginning Tier III Review Tier I & Tier II for … oClear beginning & ending dates oIntervention design.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
Purpose: The purpose of CMM Integration is to provide guidance for improving your organization’s processes and your ability to manage the development,
Design Report – Fall Semester. Title Page List name of project and team number List date List team members, advisor, sponsor Team logos.
25 September 2002 AS 9103 Variation Management of Key Characteristics Lee Tait Director, Quality Assurance Lockheed Martin Aeronautics.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Supplier Performance Development Process
Workshop on Accreditation of Bodies Certifying Medical Devices Kiev, November 2014.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
PROGRESS REPORT LECTURE 7. What is a Progress Report? A Progress Report : documents the status of a project describes the various tasks that make up the.
Supplier Corrective Action Request (SCAR) Supplier Training
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
PRODUCT VERIFICATION Adapted from the NASA Systems Engineering Handbook for CSULB EE 400D by Alia Bonetti.
Six Sigma Greenbelt Training
Project Quality Management
Project quality.
DSQR Training Control Plans
Supplier Performance Development Process
Review.
of Key Characteristics
Product and Process Validation JAN ROOVERS ASSOCIATES, INC.
Supplier Performance Development Process
Research Proposal and Report
Presentation transcript:

Variation Management of Key Characteristics Contents Key Characteristics definition Purpose Method for accomplishment Process Control Document form Structure of the standard Status and timeframe objective.

Control of variation is necessary for meeting Customers' requirement/satisfaction. Control of variation is necessary for meeting Customers' requirement/satisfaction. Variation Management of Key Characteristics Definition of Key Characteristics Significant influence :  Product fit  Performance  Service life  Manufacturability Measurable features.

Variation Management of Key Characteristics Purpose Intent to drive the improvement of the manufacturing processes through adequate planning and effective management of Key Characteristic variation. Methodology for component/process proving focused on Key Characteristics.  Understanding processes  Using appropriate tools  Demonstrating acceptable process capabilities  Guidelines for reporting process capability data to primes.

Variation Management of Key Characteristics Method of accomplishment Operate the process Analyze data Analyze data Take action from study Yes  Output for each stage.  Report to a common form. Plan a manufacturing process Understand Key Characteristics Understand Key Characteristics Is a process change required ? Continue to monitor performances No

Variation Management of Key characteristics Process Control Document (PCD) form  Written description of manufacturing plan  Living document  Performance results  History of changes. PCD is the preferred method of fulfilling the documentation requirements PCD is the preferred method of fulfilling the documentation requirements

AS9103 PROCESS CONTROL DOCUMENT Page 1 of 2 Process Control Document NumberProcess OwnerDate (Original)Date (Rev)Flowchart Created? Yes/No Part Number / Part Family / Latest Change LevelProducer Approvals and DateCustomer Approvals and Date Part Name / DescriptionName: Producer / PlantManufacturer CodeName: STAGE 1STAGE 2 KC NoKEY CHARACTERISTIC(S)Minimum Requirement Origin of KCAre Sources of Variation Identified? Yes/No Is Risks Mitigation Specified? Yes/No KC Name Process IDOperation Number Work Instruction No. /Change Level CpCpk

AS9103 PROCESS CONTROL DOCUMENT Page 2 of 2 Process Control Document NumberPart Number / Latest Change LevelDate (Original)Date (Rev) STAGE 3STAGE 4 STAGE 5STAGE 6 KC No. Preliminary Process Capability Study -Type of Control Chart Results of StudyAction from Study, Y/N Ongoing Monitoring Methods Stable Y / N CalculationsControl Chart/OtherCapability Review Freq. Hist / NewDateGageGage #M.S.A. %nFreq.MeanStd. Dev.CpCpkTypeFrequency

Variation Management of Key Characteristics Structure of the standard  Consist of 2 sections :  Minimum requirements  general requirements (process capability, variation management, substitute KCs, flow-down to sub- tiers……)  Flowchart with 7 stages  Best practices / guidelines/ form in appendix format.  Process Control Document (PCD)  Model for flowchart activities

Variation Management of Key Characteristics Status and timeframe objective  Standard balloted and consensus reached  PCD form available on document.  Recommended tools / forms may be incorporated in the IAQG web-site THIS STANDARD SHOULD BE AVAILABLE IN JULY 2001

Variation Management of Key Characteristics Questions ?