B eam-line O perational S pares S trategy BI equipment status. 27/05/2014 Javier SIMÓN1.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
MD status. 50 ns double batch, preliminary results Intensity: extraction Transverse parameters at PS extraction, end of last week LHC50_DB Eh.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
ToPOTools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April –
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
(BI) Needs and Experience with Cameras in Radioactive Environment Stephane Burger BE BI-PM BI review on Radiation development and testing 22 nd of November.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
360 Panoramic Photographs Capture, Processing, Layout Database T. Birtwistle EN-MEF-DC.
1 Importation of Medical Devices FDA Chicago District O’Hare Import Resident Post August 26, 2010 Import Entry Review Team Tamara M. Qtami, CSO.
Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz,
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
Engineering Data Management System CERN Drawing Directory overview - Stephan Petit - CERN EST/ISS - LHC Auditorium :00 CERN DRAWING DIRECTORY.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Injector De-cabling Project Project Team Meeting #
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
ELENA LAYOUT MACHINE status. Stephane Maridor/ ELENA collaboration ELENA – LAYOUT machine WHO WE ARE ? HOW IT WORKS ? STATUS of ELENA LAYOUT MACHINE ACCESS.
BCT for protection LHC Machine Protection Review April 2005 David Belohrad, AB-BDI-PI
Christophe Mugnier, on behalf AB/PO Group ATC-ABOC days, 23 January 2008 AB/PO equipment review and Stand-by service description for the power converter.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
Application Development for Operations in the Coming Years Mike Lamont.
Davide Tommasini Status and prospects of the PS magnet consolidation program ATOP Days March 4 th – 6 th 2009 Status and prospects of PS magnets programs.
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
Injector De-cabling Project Enlarged project meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
Louis Hammouti. AGENDA 1. Introduction 2.Access authorizations more restrictive in the experiments 3.Access request managed by EDH 4.Access rules 5.Authorization.
Next Steps, Priorities, Strategy for Spares Ray Veness.
0 © Copyright 2013 Wellesley Information Services, Inc. All rights reserved. HANDS ON LAB: Customizing Dashboards with SAP BusinessObjects Design Studio.
EDMS/CDD Overview Stephan Petit - EST/ISS LHCb EDMS Seminar – Dec. 5 th, 2001 EDMS Doc EDMS/CDD Overview.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
Shielding Naming Layout Database Tom Birtwistle EN-MEF-DC.
European Organization For Nuclear Research PS2 Naming Conventions: the Options Ronny Billen 15 June 2009 Accelerators and Beams Department Controls Group.
Standby Services or Reliance on Experts for Accelerator control? Claude-Henri Sicard AB/CO ATC/ABOC Days 2007.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part I: Current Situation a) Overview of TE-ABT Systems & equipment b) Naming conventions used.
Stephane Deghaye (AB/CO) The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop Motivations & Objectives.
Database - How to keep BI information up to date? Samy Chemli on behalf of EN-MEF-DC.
Storage Areas 865, 879, 954 and 955 G. Schneider J. Simon N. Sharmazanashvili G. Schneider BE-BI BI Beamline Operational Spares Strategy 2 (BOSS.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
Radiation Protection computing tools Gérald Dumont HSE/RP.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
Archives/References for SPS Faraday Cage Timing Vito Baggiolini AB/CO after discussions with M. Arruat, J.-C. Bau, R. Billen, A. Butterworth, F. Follin,
1 TI 8 LHC SPS LSS6 IR2 TT41 LSS4 IR8 TI 2 TT60 TT40TT20 LSS2 LSS1 TT10 Mobile dump block (TED) Targets T2, T4, T6 Target T40.
ELENA Layout Naming Convention F. Butin / ELENA collaboration.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Project Codes/Coding Pierre Bonnal Project Codes/Coding — P. Bonnal2 Three to tango Agenda “as-is” “should-be” “to-be”
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Naming conventions Sub-committee Meeting.
ToPO Tools for PS Operation
Introduction Intro Problem Materials Hypothesis Procedure Results
Wire Scanner / A.Demougeot
Naming convention and layout database for the East Area
Injector De-cabling Project
Configuration Management and Layout Database ELENA Project
Post-mortem of Experience with LEIR Controls
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
دانشگاه شهیدرجایی تهران
تعهدات مشتری در کنوانسیون بیع بین المللی
Present and Future test facilities for High-intensity Targetry CERN
Presentation transcript:

B eam-line O perational S pares S trategy BI equipment status. 27/05/2014 Javier SIMÓN1

BI equipment status.  Sources of information  Machines inspected  Component statistics  To be inspected  Stored reserves (B879, 954, 955)  Conclusion, global status. 27/05/2014 Javier SIMÓN 2

Introduction 27/05/2014 Javier SIMÓN 3

Introduction /05/2014 Javier SIMÓN 4

Sources of information 27/05/2014 Javier SIMÓN 5  Layout DB  Layout drawings  CDD  Websites: OP, Optics, BI experts.  DFS - Old drawings.  Visual inspection.

Inspected until now. 27/05/2014 Javier SIMÓN 6

Lines in the Layout DB 27/05/2014 Javier SIMÓN 7

PS Ring 27/05/2014 Javier SIMÓN 8

PS Booster 27/05/2014 Javier SIMÓN 9

Component statistics 27/05/2014 Javier SIMÓN 10  Instrumentation and types.  Layout DB discrepancies.  Amount of instrumentation in lines not yet including in the layout.  Total unregistered equipment.  Drawing status.

Component statistics 27/05/2014 Javier SIMÓN 11  Data registered in the layout.  LHC: just the ring.  SPS: ring TI2 TI8 TT10.  PX: LEIR, proton lines up to FT16.

Component statistics PS complex 27/05/2014 Javier SIMÓN 12

Component statistics 27/05/2014 Javier SIMÓN 13  Disconnected instrumentation.  Inside those 478, everything is working?

Component statistics 27/05/2014 Javier SIMÓN 14  Disconnected instrumentation.

Component statistics 27/05/2014 Javier SIMÓN 15  Equipment types  Drawing Status.

Component statistics 27/05/2014 Javier SIMÓN 16

Component statistics 27/05/2014 Javier SIMÓN 17  PX drawings in numbers.

To be inspected  Before LS1 end.  SPS  LHC  To be scheduled.  AD, Isolde, target areas. 27/05/2014 Javier SIMÓN 18

Stored reserves 27/05/2014 Javier SIMÓN 19

Reserves (B879, 954, 955) 27/05/2014 Javier SIMÓN 20

Global status. In one word, heterogeneous.  The documentation is stored in many formats, places and with different naming conventions.  Amount of information: From correct and accurate, to no information, or “excessive” duplicated…  Descriptions need to be improved 27/05/2014 Javier SIMÓN 21

27/05/  Thanks for your attention.  Question time. Javier SIMÓN Hope to se you in BOSS 2.0

Global status.  Examples.  2 names same equipment.  1 name different equipment's 27/05/2014 Javier SIMÓN 23

2 names same equipment. PX-UDCSPS-BPCL 27/05/2014 Javier SIMÓN 24

2 names same equipment. PX-UDCSPS-BPCL 27/05/2014 Javier SIMÓN 25

2 names same equipment. 27/05/2014 Javier SIMÓN 26

2 names same equipment. 27/05/2014 Javier SIMÓN 27

2 names same equipment. 27/05/2014 Javier SIMÓN 28

2 names same equipment. SPS SPSBPCLM /05/2014 Javier SIMÓN 29

Global status.  Examples.  Intro.  2 names same equipment.  1 name different equipment's. 27/05/2014 Javier SIMÓN 30

1 name different equipment's. BTV 27/05/2014 Javier SIMÓN 31

1 name different equipment's. BTV 27/05/2014 Javier SIMÓN 32

1 name different equipment's. BIMTVBTVMR 27/05/2014 Javier SIMÓN 33

Generating the list. Layout label Equipment code label 27/05/2014 Javier SIMÓN 34

Equipment code label 27/05/2014 Javier SIMÓN 35  Video.

Equipment code label 27/05/2014 Javier SIMÓN 36

Descriptions need to be improved. 27/05/2014 Javier SIMÓN 37