CSC Synchronization documentation Step-by-step procedure to… – Read out a chamber – Synchronize triggers from many chambers (and read out data) Description.

Slides:



Advertisements
Similar presentations
24 April 2007G. Rakness (UCLA) 1 Power cuts at Green Barracks/SX5 False fire alarms from the central fire alarm system (incendie central) cut power to.
Advertisements

22 May 2007G. Rakness (UCLA) 1 At minus-side slice test… Complete description of how to bring back slice test all the way from (power=off) to (local run=physics.
US Test Beam Results Of Front End Timing T. Ferguson, N. Terentiev* (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25.
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
ETrack User Manual Penchant Software Inc. This manual was written using an Iphone 4s Version One of the keys to successful freight management,
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
20 Oct 2009G. Rakness (UCLA)1 Powering on… Last week: CMS off to give evaporation time to dry out the experiment Monday – Tuesday: Began powering on CSCs.
1 CSC operation news M. Ignatenko UCLA group meeting CERN February 18, 2014.
15 Sept 2009G. Rakness (UCLA)1 Paper progress On the Analysis Review Committee for the paper: “Performance of the CMS Cathode Strip Chambers with Cosmic.
13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Program documentation Using the Doxygen tool Program documentation1.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Aug 13 th 2003Scheduler Tutorial1 STAR Scheduler – A tutorial Lee Barnby – Kent State University Introduction What is the scheduler and what are the advantages?
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Cover for special hardcover edition of Phys. Lett. B featuring CMS+ATLAS Higgs results 31 July 2012G. Rakness (UCLA)1 The articles were submitted today.
Save Your Movie on a CD. After creating a movie in Windows Movie Maker, you can share it with your family and friends in a variety of formats. One of.
Various Wrote Run Coordination job description – Found this exercise to be useful as CSC Operations guy, so decided to do it as Deputy Run Coordinator…
Collisions… … with “non-stable beams” maybe on Thursday –Got experts to converge on goal and how to do it … to check timing, using L1 = zero-bias seeding.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
10/06/09 UCLA Meeting Hauser 1/14 really Various updates Update on LHC schedule: Beam to Alice starts ~Oct. 24. Not all sectors are cold. Circulating beam.
UCLA group meeting1/9 CSC update – my random summary Another good week for LHC: L=0.9E32 reached (nearly the goal of 1E32 in 2010) Test run with 50 ns.
UCLA group meeting1/11 CSC update – a 2-week summary Status of CMS at LHC: L=2*10 32 reached 25-Oct-2010 (=the original goal for 2011) and 42 pb -1 collected.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
UCLA meeting, 2012 Hauser1 Since last week Technical Coordination workshop Gave talk on CSC upgrades New 2013 timeline – ME4/2 seems okay, ME1/1 is tight,
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
ETrack User Manual Penchant Software Inc. This manual was written using a Samsung Galaxy Nexus phone with Android OS version (Jelly Bean) Version.
1 Microsoft Project 2003 Starting a New Project. 2 Creating a new project plan To start Microsoft Project, click the Windows Start menu. Point to All.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
13 March 2007G. Rakness (UCLA) 1 RPC efficiency in RAT Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Installing Microsoft C++ Microsoft Visual Studio 6.0.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
Andrew Peck 1 CSC OTMB Firmware Meeting February 21, 2014 ALCT/TMB/RAT Test Stand at CERN Setting up complete duplicate of the ALCT-TMB-RAT test stand.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
DCS for TRD Pre-trigger Ken Oyama Jan. 22, 2007 DCS Workshop in Heidelberg.
22 Sept A slight reformulation of (ALCT) muonic timing… In terms of brass tacks.
CMS livetime during last week’s runnin 11 Sep 2012G. Rakness (UCLA)1 Fills  1.02/fb delivered, 0.98/fb recorded 96.1% live ~2.4% not running.
40 Minutes Left.
3 Nov 2009G. Rakness (UCLA)1 Weekend of 24 – 25 October Loaded all TMB firmware –Version 15 Oct 2009 XML file created using Jay’s muonic timing constants.
Timer Alarm. What Is The Timer Alarm? The Timer Alarm provides a method for triggering time- based alarms during script playback.
A Low Voltage Problem Seen by TMB Greg Rakness University of California, Los Angeles CSC Operations + DPG Meeting 28 July 2010.
Recall: CFEB inefficiencies Collision Run June 2010G. Rakness (UCLA)1 validation/run135445/ExpressPhysics/Site/PNGS/hORecHits.png.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
Management hoo-hah Created short list for DPG coordinator ( ) – Talked with several people to converge on the list – Tiziano now has the list and.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
Sundry LHC Machine Development starts 19 June –Original plan to have 90m comm. next week was torpedoed by private discussions between spokesperson and.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
Various Gave presentation at TIG meeting on p5 control room. Feedback included… Proposal should explicitly cover all phases of CMS operations Running.
Update on “Muonic Timing” of CSC Electronics
Recall: CSC TF Halo rate spikes during run (23 May)
904 Status Recall last Group Meeting…
Timing/Synchronization Status
VME Bus error A possible error condition for TMB whose firmware has been “misloaded” is to cause Bus Error on VME crate controller (VCC) at power up… Under.
“Golden” Local Run: Trigger rate = 28Hz
Study Manager is a kalmstrom
Electronics for RPC Upscope
Cabling Lengths and Timing
CSC Trigger Primitives Test Beam Studies
CSC Turn ON Status Report by Fred B.
Pierluigi Paolucci & Giovanni Polese
Configuring the Peripheral Crates
Technique_Creator_Name Date Software_Version
Prepared for CSC by Fred Borcherding FNAL
CSC Electronics Problem Report CSCE I&C
CSC Shift Training and Operation + B904 Status
Presentation transcript:

CSC Synchronization documentation Step-by-step procedure to… – Read out a chamber – Synchronize triggers from many chambers (and read out data) Description of each step, including… – Requirements (LV, HV, etc.) – Depends on (cable lengths, firmware, etc.) – Description of scan (including parameter name) – How to navigate Yellow Page to measure on one chamber, crate, or endcap – Example logfile of successful scan Other stuff… – Description of TOF parameters – Description of parameters which affect timing (some indirectly) – Parameters which seem like they should be touched, but they shouldn’t – How to run scripts to… Change a few parameters in one chamber Change one parameter in many chambers Insert measured scan values back into xml file – How to accommodate a change in L1A latency 12 Mar 2013G. Rakness (UCLA)1

Finished, except for… Description of… – ALCT and CLCT TOF parameters and measurables – CSCTF timing/MPC-SP automatic timing at Resync Reference for fiber lengths (TTCrx delays) 12 Mar 2013G. Rakness (UCLA)2

To do Pick up neutron note – Read it again… what all is left to be done? – Likely need to pick up Chad’s analysispick up Chad’s analysis FNAL – Write seminar – Write 20 minute short talk on “technical contribution” (need details) – Continue to study upgrade TDR’s – Upgrade meetings  match to CD tasks Management cleanup – RC job description – boxes for point 5 tasks General – Template for Shift leader summary elog – Understand data losses 12 Mar 2013G. Rakness (UCLA)3