PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.

Slides:



Advertisements
Similar presentations
Sharing of ISTS Charges & Losses Regulation
Advertisements

ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
FREQUENCY SPECTRUM FROM AUGUST 06 TO OCT 06 (UPTO 20 TH OCT 06) < 49.0 HZ< 49.5 HZ< 50.0 HZ HZ>50.2HZ>50.5 HZ Aug
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Energy Accounting and Need for Special Energy Meters under ABT Regime.
Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)
‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
FREQUENCY PATTERN DURING JAN 2007 Freq Profile 1-11 Freq Profile Freq Profile
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
14 TH Commercial sub-committee meeting UI &REC Audit Talcher II scheduling SEM DATATransmission pricing AMR Others.
LOAD FORECASTING T SRINIVAS MANAGER SRLDC. MAIN COMPONENTS OF THE GRID  GENERATION  LOAD  TRANSMISSION NETWORK DETAILS.
14 TH Commercial sub-committee meeting UI &REC Audit Talcher II scheduling SEM DATATransmission pricing AMR Others.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
W E L C O M E Power Grid Corporation of India Limited.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
1 PRESENTATION ON “OPEN ACCESS – ELECTRICITY ACT 2003” TO THE OFFICERS OF KARNATAKA ELECTRICITY BOARD On POWER ENGINEERS’ DAY 23 RD January, 2005 by V.K.
Anil Thomas Asst. Executive. Engineer Southern Regional Power Committee Central Electricity Authority.
WELCOME TO CIGRE MEMBERS
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI& Reactive charges Tamilnadu to pay 100Crs. as UI charges and 2Crs. as Reactive.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI & Reactive charges Tamilnadu still to pay 74Crs. as UI charges during
HYDRO TARIFF Commission Tariff Notification 26/03/01 Commission Tariff Notification 26/03/01 Applicable Period 01/04/01 to 31/03/04 Applicable Period 01/04/01.
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
UI IN SR (FROM 01/01/03 TO 13/05/07) TOTAL UI TURNOVER :- 13,831 MU TOTAL UI AMOUNT DISBURSED:- 3,177 CR AVG WEEKLY TRANSACTION:- 61 MU AVG WEEKLY UI AMOUNT.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Settlement System under ABT Regime. WHAT IS SETTLEMENT ? “ Settlement means finalisation of payment bill after consumption” To be FAIR and EQUITABLE To.
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
Availability Based Tariff (ABT) in Northern Region.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
Transmission Tariff V.Balaji Chief Manager SRLDC.
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
Issues related to UI pool. Payment to pool account by KPTCL and Pondy Till June 2010 payment to UI pool by KPTCL and Pondy was through cheque/DD. Pondy.
Extract from Annexure-1 on ‘Complementary Commercial Mechanisms of Indian Electricity Grid Code ’12(a) Weekly bills shall be issued to the constituents.
Issues for discussion ON INTERTRIP SCHEME AT TALCHER II Present Scheme has worked satisfactorily as per the Logic designed On number of occasions unit(s)
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
UI IN SR (FROM 01/01/03 TO 12/08/07) TOTAL UI TURNOVER :- 14,596 MU TOTAL UI AMOUNT DISBURSED:- 3,434 CR AVG WEEKLY TRANSACTION:- 61 MU AVG WEEKLY UI AMOUNT.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
AVAILABILITY BASED TARIFF. - Tariff structures - Two part tariff - Concept of ABT - ABT structure - Expectations from OEMs/Utilities Session outline.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO SHRI U. C. MISRA Director (Personnel )
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
STATE-WISE INSTALLED ELECTRICITY GENERATION CAPACITY OF CAPTIVE PLANTS (1 MW & ABOVE) StatesHydroSteamDieselGasWindTotal AP
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Hon’ble Commission has issued Interim order dated 19/ directing :
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
Presentation transcript:

PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05

PRESENTATION OVERVIEW  CERC TARIFF ORDER – RELEVANT ABSTRACT CERC TARIFF ORDER – RELEVANT ABSTRACT  INSTALLED CAPACITY OF ISGS IN SR INSTALLED CAPACITY OF ISGS IN SR  UI SUMMARY UI SUMMARY  EXCESS GENERATION BY ISGS EXCESS GENERATION BY ISGS  STATEMENT OF DC,SCHEDULE AND ACTUAL GENERATION STATEMENT OF DC,SCHEDULE AND ACTUAL GENERATION  DC, SCHEDULE AND ACTUAL DRAWAL GRAPHS DC, SCHEDULE AND ACTUAL DRAWAL GRAPHS

THANK YOU

CERC TARIFF ORDER- RELEVANT ABSTRACT (i) “Any generation up to 105% of Declared Capacity in any time block of 15 minutes and averaging up to 101% of the average Declared Capacity over a day shall not be construed as gaming, and generator shall be entitled to UI charges for such excess generation above the scheduled generation (SG). (ii) For any generation beyond the above prescribed limits, the Regional Load Despatch Centre shall investigate so as to ensure that there is no gaming and if gaming is found by the Regional Load Despatch Centre, the corresponding UI charges due to the generating station on account of such extra generation shall be reduced to zero and the amount shall be adjusted in UI account of beneficiaries, in the ratio of their capacity share in the generating station.” Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations,2004,Dated 26 th March 2004 of clause 24 of 2 is as follows:

SOUTHERN REGIONAL GRID Inter State Generating Stations in the Region participating in the UI mechanisem: Ramagundam STPS 1-6 : 2100 MW (200x x4) Ramagundam STPS 7 : 500 MW NLC TPS 2 / I : 630 MW (210 x 3) NLC TPS 2 / II : 840 MW (210 x 4) NLC TPS 1(EXP.) : 420 MW (210X2) TALCHER STAGE II : 2000 MW (500X4) situated in ER

SUMMARY OF UI – 141 WKS (FROM 01/JAN/03 TO 11/SEPT/05) WEEK WISE UI AMOUNT Total UI in MUs Total amount in Crores Rs. Average rate of UI in paise/unit AP (S) KAR (P) KER (P) TN (P) RSTPS (1-6) (S) RSTPS UNIT (S) NLC II/ (S) NLC II/ (S) NLCEXP (S) TALST (S) UI IN MU (+) OVER DRAWAL BY STATES (+) OVER GENERATION BY GENERATORS ( - ) UNDER DRAWAL BY STATES ( - ) UNDER GENERATION BY GENERATORS TOTAL AMOUNT ( + ) PAYABLE TO THE POOL ( - ) RECEIVABLE FROM THE POLL P - PURCHASE PRICE S - SELLING PRICE

SUMMARY OF UI –65 WKS (FROM 01/JAN/03 TO 29/MAR/04) Total UI in MUs Total amount in Crores Rs. Average rate of UI in paise/unit AP (S) KAR (P) KER (P) TN (P) RSTPS (1-6) (S) RSTPS UNIT 7 NLC II/ (S) NLC II/ (S) NLCEXP (S) TALST ( P) UI IN MU (+) OVER DRAWAL BY STATES (+) OVER GENERATION BY GENERATORS ( - ) UNDER DRAWAL BY STATES ( - ) UNDER GENERATION BY GENERATORS TOTAL AMOUNT ( + ) PAYABLE TO THE POOL ( - ) RECEIVABLE FROM THE POLL P - PURCHASE PRICE S - SELLING PRICE WEEK WISE UI AMOUNT

SUMMARY OF UI – 76 WKS (FROM 29/MAR/04 TO 11/SEPT/05) Total UI in MUs Total amount in Crores Rs. Average rate of UI in paise/unit AP (S) KAR (P) KER (P) TN (P) RSTPS (1-6) (S) RSTPS UNIT (S) NLC II/ (S) NLC II/ (S) NLCEXP (S) TALST ( S) UI IN MU (+) OVER DRAWAL BY STATES (+) OVER GENERATION BY GENERATORS ( - ) UNDER DRAWAL BY STATES ( - ) UNDER GENERATION BY GENERATORS TOTAL AMOUNT ( + ) PAYABLE TO THE POOL ( - ) RECEIVABLE FROM THE POLL P - PURCHASE PRICE S - SELLING PRICE WEEK WISE UI AMOUNT

DECLRATION OF ACTUAL DC BY NTPC STATIONS OVER NORMATIVE DC RSTPS (U1 - U6 ) Month Average Normative DC Average Actual DC Average Additional DC Maximum Additional DC Extra Available Energy To Constituents (in MW) (in % ) (in MW) (in %) Dec Jan Feb Mar Apr May

GRAPHS OF DC, SCHEDULE AND ACTUAL DRAWAL NTPC –RSTPSRSTPS –RSTPS UNIT 7RSTPS UNIT 7 –TALCHER STAGE 2TALCHER STAGE 2 NLC –NLC STAGE 2/1NLC STAGE 2/1 –NLC STAGE 2/2NLC STAGE 2/2 –NLC TPS1 EXPANSIONNLC TPS1 EXPANSION TNEB

DC,SCHEDULE AND ACTUAL DRAWAL NTPC –RSTPSMWMUMWMU -TALCHER STAGE 2MWMUMWMU NLC –NLC STAGE 2/1 MWMUMWMU –NLC STAGE 2/2 MWMUMWMU –NLC TPS1 EXPANSION MWMUMWMU