ICAL electronics and DAQ schemes - 1 B.Satyanarayana, TIFR, Mumbai For INO Collaboration.

Slides:



Advertisements
Similar presentations
Cosmic Ray Test of INO RPC Stack M. Bhuyan 1, V.M. Datar 2, S.D. Kalmani 1, S.M. Lahamge 1, N.K. Mondal 1, P. Nagaraj 1, S. Pal 1, L.V. Reddy, A. Redij.
Advertisements

6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
The MAD chip: 4 channel preamplifier + discriminator.
COSMIC RAY MUON DETECTION USING SCINTILLATION COUNTER AND WAVELENGTH SHIFTING FIBERS ARUNODAYA BHATTACHARYA VSRP-2009,TIFR,MUMBAI 6/7/09.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
Electronics for the INO ICAL detector B.Satyanarayana Tata Institute of Fundamental Research For INO collaboration.
ARNAB BANERJEE Variable Energy Cyclotron Centre, India.
ICAL Instrumentation Challenges &/ Opportunities B.Satyanarayana TIFR, Mumbai.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Multichannel Analyzers A multichannel pulse-height analyzer (MCA) consists of an ADC, a histogramming memory, and a visual display of the histogram recorded.
Hotel Arasan Sapthagiri, Madurai January 23, 2011.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
B.Satyanarayana, For INO Collaboration. B.Satyanarayana, INO INO-KEK Meeting January 28, 2009, TIFR, INDIA2 48.4m 16m 14.5m To study atmospheric neutrinos.
Naba K Mondal, TIFR, Mumbai ICAL ( conceptual) INO Peak at Bodi West Hills Prototype ICAL at VECC 2mX2m RPC Test Stand at TIFR ASIC for RPC designed at.
Status of INO detector R&D B.Satyanarayana TIFR, Mumbai.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
Second generation Front-end chip for H-Cal SiPM readout : SPIROC DESY Hamburg – le 13 février 2007 M. Bouchel, F. Dulucq, J. Fleury, C. de La Taille, G.
15th Dec, 2007DAE-SNP07 S.S.Upadhya1 Electronics and Data Acquisition system for prototype INO-ICAL detector A.Behere1, V.B.Chandratre1, S.D.Kalmani2,
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
Dr. B.Satyanarayana ▪ Scientific Officer (G) Department of High Energy Physics ▪ Tata Institute of Fundamental Research Homi Bhabha Road ▪ Colaba ▪ Mumbai.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
ICAL Electronics: Requirements and Challenges B.Satyanarayana TIFR, Mumbai.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
A Readout Electronics for MAPMT Matteo Turisini – E. Cisbani Italian National Institute of Health – INFN Rome 1 JLab/CLAS12 RICH Meeting - 16/Nov/2011.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Commissioning of ICAL prototype detector electronics B.Satyanarayana TIFR, Mumbai.
India-based Neutrino Collaboration(INO), INDIA1 B.S.Acharya, Sudeshna Banerjee, P.N.Bhat, S.R.Dugad, P.Ghosh, K.S.Gothe, S.K.Gupta, S.D.Kalmani, N. Krishnan,
A Front End and Readout System for PET Overview: –Requirements –Block Diagram –Details William W. Moses Lawrence Berkeley National Laboratory Department.
B.Satyanarayana, TIFR, Mumbai. Architecture of front-end ASIC INO Collaboration Meeting VECC, Kolkata July 11-13, Amp_out 8:1 Analog Multiplexer.
Front End Circuit.. CZT FRONT END ELECTRONICS INTERFACE CZTASIC FRONT END ELECTRONICS TO PROCESSING ELECTRONICS -500 V BIAS+/-2V +/-15V I/O signal.
Satyanarayana Bheesette Roll number: Supervisors Prof Raghava Varma, IIT Bombay Prof Naba Mondal, TIFR, Mumbai Department of Physics Indian Institute.
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
B.Satyanarayana, TIFR, Mumbai * With some updates from ICAL Electronics meeting held on Jan 23 in Madurai.
Status summary of RPC R&D for INO ICAL detector B.Satyanarayana, TIFR, Mumbai Satyajit Jena, IIT Bombay, Powai For INO Collaboration.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
16 October, 2009ASET talk - S.S.Upadhya Electronics and DAQ system for INO-ICAL prototype detector (Presented by S.S.Upadhya, TIFR on behalf of INO collaboration)
Valerio Re, Massimo Manghisoni Università di Bergamo and INFN, Pavia, Italy Jim Hoff, Abderrezak Mekkaoui, Raymond Yarema Fermi National Accelerator Laboratory.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
B.Satyanarayana (For INO collaboration) Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai, 400.
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
INO prototype detector and data acquisition system Anita Behere, M.S.Bhatia, V.B.Chandratre, V.M.Datar, P.K.Mukhopadhyay Bhabha Atomic Research Centre,
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
Satyanarayana Bheesette Tata Institute of Fundamental Research, Mumbai, INDIA (For INO Collaboration) INO: India-based Neutrino Observatory ICAL: (Magnetised)
High Voltage Power Supply for RPC Suvendu Nath Bose, Satyajit Saha, Sudeb Bhattacharya, Saha Institute of Nuclear Physics, Kolkata,, Description Presently.
R & D Status report on INO Naba K Mondal Tata Institute of Fundamental Research Tata Institute of Fundamental Research Mumbai, India.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Analysis of LumiCal data from the 2010 testbeam
INO TRIDAS presentations
Status of n-XYTER read-out chain at GSI
BESIII EMC electronics
PID meeting Mechanical implementation Electronics architecture
Presentation transcript:

ICAL electronics and DAQ schemes - 1 B.Satyanarayana, TIFR, Mumbai For INO Collaboration

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Plan of the presentation  Glass RPC characteristics  ICAL prototype detector  Electronics and DAQ system for the prototype detector  Preliminary results from the prototype detector  ICAL detector  Electronics and DAQ schemes for ICAL  Integration issues  Project implementation strategies

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, RPCs for prototype detector  Using 3mm thick Asahi Float glass procured from local market  Polycarbonate buttons, spacers and gas nozzles developed and fabricated  Resistive coat developed in collaboration with a local industry  Operated in avalanche mode using R134:Iso:SF 6 ::95.5:4.3:0.2 gas mixture 1m  1m

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Honeycomb pickup panel Terminations on the non-readout end Machined pickup strips on honeycomb panel Preamp connections on the readout end

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Pulse profiles while measuring Z  51  Open 48  100 

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, RPC pulse profile

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Decay constant  = 10nS

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Charge-pulse height plot

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Charge spectrum of the RPC  = 375fC

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Pulse height-pulse width plot

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Time spectrum of the RPC  t = 1.7nS

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, ICAL prototype detector  13 layers of 50 mm thick low carbon iron plates  35 ton absorber mass, rectangular design  1.5 Tesla uniform magnetic field  12, 1m 2 RPC layers  768 readout channels  Trigger on cosmic ray muons  In situ, using RPCs  Using scintillation paddle layers  Record strip hit and timing information  Chamber and ambient parameter monitoring

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Scheme for prototype detector

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, RPC stack for INO prototype detector

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Schematic of the prototype detector

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Front-end inventory per layer 2 planes (X & Y) 64 readout channels 8 preamplifier boards 4 Analog Front Ends 2 Digital Front Ends

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Preamplifiers  BARC designed HMCs inventoryHMCs  First stage negative input(1595): 1500 pcs  First stage positive input(1597): 1500 pcs  Second stage(1513): 1400 pcs1513  2 types of preamps for X and Y planesXY  Cascaded HMCs, Gain: 80, 8-in-1Gain: 80  Rise time: 3nS, Noise band: ±7mV  Need about 100 boards per stack  Installation of ¾ th of boards completed

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, channel analog front-end  Functions  To digitize the preamp signals  To form the pre-trigger (Level-0) logic  Signal shaping  Features  Based on the AD96687 ultra-fast comparator  Common adjustable threshold going up to 500mV  V Th now at -20mV  ECL output for low I/O delay and fast rise times

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, channel digital front-end  Functions  Latch RPC strip status on trigger  Transfer latched data serially through a daisy chain to the readout module  Time-multiplex strip signals for noise rate monitoring  Generate Level-1 trigger signals  Features  Latch, shift register, multiplexer are implemented in CPLD XC95288  Trigger logic is built into a CPLD XC9536; flexible  Data transfer rates of up to 10MHz

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Control and data router  To route the control signals and shift clock from controller to the individual FEP modules  To route the latch data from all the FEPs to the readout module  To route strip signals from FEPs to the scalers for noise rate monitoring

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Trigger and TDC router  To route the m-Fold signals from each RPC plane to the final trigger module  To route TDC stop signals (1-Fold) from each plane to the TDC module  All signals are in LVDS logic, except TDC stop signals which are in ECL logic for achieving better timing resolution

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Data and monitor control module  On FTO, triggers all the FEPs to latch the strip signals  Initiates serial data transfer to the readout module  Manages the noise rate monitoring of strip signals, by generating periodic interrupts and selecting channels to be monitored sequentially  CAMAC interface for parameter configuration (like data transfer speed, size, monitoring period) as well as diagnostic procedures

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Data and monitor readout Module  Supports two serial connections for event data recording of X and Y planes and 8 channels for noise rate monitoring  Serial Data converted into 16-bit parallel data and stored temporarily in 4k FIFO buffer  Source of LAM for external trigger source  CAMAC interface for data readout to Computer

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Final trigger module  Receives m-fold layer triggers and generates m  n fold final trigger  Final trigger out (FTO) invokes LAM and is Logic Trigger Out (LTO) vetoed by gated LAM  Inputs can be selectively masked  The rates of different m  n combinations counted by embedded 16-bit scalers  Rate monitoring of LTO signal using the built in 24-bit scaler  Logic inputs and m  n signals are latched on an FTO and can be read via CAMAC commands  Implementing using FPGA adds to circuit simplicity and flexibility Developed by ED, BARC

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Power supplies and monitoring  Essentially commercial solutions  Low voltage & monitoring  CAEN’s 1527 mainframe  EASY 3000 system  Multi-channel, adjustable voltage, high current modules  High voltage & monitoring  CAEN’s 2527 mainframe  RPC bias current monitoring  CAEN’s 128-channel ADC board in 2527 mainframe

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Low voltage current inventory  Preamps  ±6V 16.32A each plane  AFEs  +6V 28.8A for each plane  -6V 34.8A for each plane  DFEs  +8V 11.76A for each plane  -8V 6.36A for each plane

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, On-line monitoring & services  On-line event display  On-line web portal for monitoring chambers under test as well as ambient conditions of the laboratories  Chambers  High voltage and current  Strip noise rates  Cosmic muon efficiency  Ambient parameters  Temperature  Relative humidity  Barometric pressure  Magnet control and monitoring  Gas system control and monitoring  Web based electronic log book

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, BigStack: Data analysis software  ROOT based C code  Works on highly segmented configuration file  Handles event, monitor and trigger rate data  Interactively displays event tracks  Generates frame and strip hit files  Produces well designed summary sheets  Plots and histograms produced:  Efficiency profiles  Absolute and relative timing distributions  Strip cluster size calculations  Strip profiles and lego plots  Strip rate and calibration signal rate profiles and distributions  Paddle and pre-trigger rate profiles and distributions

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, A muon track in the BigStack

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Strip hit map of an RPC in a run

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Efficiency time profile of an RPC

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, RPC Id HV(KV) Mean(nS) Sigma(nS) RelMean(nS) RelSigma(nS) AB JB IB JB JB IB AB AB AB AB Reference RPC AB AB RPC-wise timing parameters

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, RPC strip background rate monitor

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, We are here …  RPC’s pulse characteristics and ICAL’s requirements understood to a large extent; more will be known from the prototype detector  Formulating competitive schemes for electronics, data acquisition, trigger, control, monitor, on-line software, databases and other systems  Feasibility R&D studies on front-ends, timing elements, trigger architectures, on-line data handling schemes will be shortly taken up  Segmentation, power budgets, integration issues etc. must be addressed  Trade-offs between using available solutions and customised design and developments for ICAL to be debated  Procurement of design tools, infrastructure, fab facilities  Recruitment and placement of design engineers  National and international collaboration and team work

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, ICAL module

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Triggered scheme  Conventional architecture  Dedicated sub-system blocks for performing various data readout tasks  Need for Hardware based on-line trigger system  Trigger latency issues and how do we take care in implementation

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Trigger-less DAQ scheme Suitable for low event rate and low background/noise rates On-off control and V th control to disable noisy channels

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Front-end specifications  No input matching circuit needed, HCP strips give ~50Ω characteristic impedance  Avalanche mode, pulse amplitude: 0.5-2mV  Gain ( , fixed) depends on the electronic noise obtainable  No gain needed if operated in streamer mode, option to by-pass gain stage  Rise time: < 1nS  Discriminator overhead: 3-4 preferable  Variable V th for discriminator ±10mV to ±50mV  Pulse shaping (fixed) nS  Pulse shaping removes pulse height information; do w need the latter?

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Front-end considerations  RPC strip pitch versus front-end packaging  n-in-1 ASIC or PCB: Routing of tracks  1-in-1 ASIC: Mounted on pickup panels  Low voltage distribution  DC-DC converters, one per RPC to generate high voltage supply  Output signal routing

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Sub-systems  Front-ends  Latch and timing units  Pipelines and fiber  Backend (VME) data collectors  Trigger system  Central clock  Slow control and monitoring  Gas, magnet, power supplies  Ambient parameters  Safety and interlocks  Computer, networking and security issues  On-line data quality monitors  Voice and video communications  Remote access protocols to detector sub-systems and data

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Important considerations  Information to record on trigger  Strip hit  Timing  Rates  Individual strip background rates ~100Hz  Event rate ~10Hz  On-line monitor  RPC parameters  Ambient parameters  Services, supplies

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Other critical issues  Power requirement and thermal management  25mW/channel → 100KW/detector  Magnet power  Front-end positioning; use absorber to good use!  Do we need forced, water cooled ventilation?  Suggested cavern conditions  Temperature: 20±2 o C  Relative humidity: 50±5%

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Placement of front-end electronics RPC Gas volume RPC signal pickup panel Front-end for X-plane Front-end for Y-plane

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Cables & services routing RPC Iron absorber RPC Signal cables from RPCs Gas, LV & HV cables from RPCs

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, DAQ & services’ sub-stations Iron absorber Iron spacer RPC DAQ LV HV Gas

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Industries’ role  What should be INO’s modus operandi for involving industries?  Jobs like chip fabrication of course will be handled by industries (govt. or pvt.)  Can we out source some design jobs as well?  Board design and fabrication  Slow control and monitoring sub-systems  Industries are very eager and quite willing to!  Interacted with CAEN, NI, Datapatterns, ChipSculpt …

B.Satyanarayana, TIFR, Mumbai ICAL Electronics September 17, Design team members  INO collaborating institutes must pledge design team members on full or serious basis  Need to train some of the younger members with expert institutions/members  Distributed tools and software so that engineers can work on defined segments of jobs at their home institutions  Particularly useful to begin with when new engineers will be working on well defined primitives