1 1/27/2011 PHENIX WEEKLY PLANNING 1/27/2011 Don Lynch No Meeting Today Lab Closed due to 2011 Snow Storm # 7.

Slides:



Advertisements
Similar presentations
4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
Advertisements

PHENIX WEEKLY PLANNING 2/8/2007 Don Lynch. 2/8/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress Pink.
1 2/11/2010 PHENIX WEEKLY PLANNING 2/11/2010 Don Lynch.
1/12/20121 PHENIX WEEKLY PLANNING 1/12/2012 Don Lynch.
1 2/3/2011 PHENIX WEEKLY PLANNING 2/3/2011 Don Lynch.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
1 4/7/2011 PHENIX WEEKLY PLANNING 4/7/2011 Don Lynch.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
11/3/20111 PHENIX WEEKLY PLANNING 11/3/2011 Don Lynch.
1 3/5/2009 PHENIX WEEKLY PLANNING 3/05/2009 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
1 3/3/2011 PHENIX WEEKLY PLANNING 3/3/2011 Don Lynch.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
5/5/11 1 PHENIX WEEKLY PLANNING 5/5/2011 Don Lynch.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 12/09/2010 PHENIX WEEKLY PLANNING 12/09/2010 Don Lynch.
11/15/20121 PHENIX WEEKLY PLANNING 11/15/12 Don Lynch.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
1 3/24/2011 PHENIX WEEKLY PLANNING 3/24/2011 Don Lynch.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
5/16/ PHENIX WEEKLY PLANNING 5/16/2013 Don Lynch.
3/1/20121 PHENIX WEEKLY PLANNING 3/1/2012 Don Lynch.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
5/12/11 1 PHENIX WEEKLY PLANNING 5/12/2011 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
1 1/20/2011 PHENIX WEEKLY PLANNING 1/20/2011 Don Lynch.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
1 3/31/2011 PHENIX WEEKLY PLANNING 3/31/2011 Don Lynch.
10/20/20111 PHENIX WEEKLY PLANNING 10/20/2011 Don Lynch.
1 6/23/2011 PHENIX WEEKLY PLANNING 6/30/2011 Don Lynch.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/31/2009 Don Lynch.
1 1/28/2010 PHENIX WEEKLY PLANNING 1/28/2010 Don Lynch.
8/11/20111 PHENIX WEEKLY PLANNING 8/11/2011 Don Lynch.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/17/2009 Don Lynch.
1 5/19/2011 PHENIX WEEKLY PLANNING 5/19/2011 Don Lynch.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 2/4/2010 PHENIX WEEKLY PLANNING 2/4/2010 Don Lynch.
Presentation transcript:

1 1/27/2011 PHENIX WEEKLY PLANNING 1/27/2011 Don Lynch No Meeting Today Lab Closed due to 2011 Snow Storm # 7

2 1/27/2011 This Week: Controlled Accesss Wednesday VTX flow meter repair – successful 2 DC FEM’s removed to be repaired and reinstalled next week during Scheduled maint access on Wed. 2/2 MPC Replaced ASIC RICH board changed EMCAL cable strain relieved DAQ work BBC, ZDC, PC, MuTrig, RPC operational troubleshooting Continue support for new detector commissioning Continuing mechanical, electrical and gas system support for Run 11 Plan for shutdown 2011 Future upgrades support

3 1/27/2011 Next Week Continue support for new detector commissioning Continuing mechanical, electrical and gas system support for Run 11 Continue planning for shutdown 2011 Future upgrades support VTX chiller repairs Next: Scheduled Maintenance Access: Wednesday Feb 2 (Ground Hogs Day) Replace DC boards VTX flow meter work MuTr capacitor test work: WP still in effect, notify CA for air sampling Examine CM region for possible FoCal prototype mounting locations

4 1/27/2011 FoCal Prototype Installation Plan Scout possible installation locations Assembly fixtures and parts design complete Materials ordered Assembly components placed with CS

5 1/27/2011 Looking Ahead to the 2011 Shutdown Run 11 Ends6/30/2010 Shutdown Standard Tasks (Open wall, disassemble wall, Remove MuID Collars, Move EC to AH, etc.7/21/2010 Disassemble VTX services8/1/2010 Remove VTX and transport to Chemistry Lab8/15/2010 BBC North maintenance8/31/2010 MuTr North Station 1 work9/15/2010 VTX maintenance and integration of FVTX onto VTX support structure9/15/2010 Install VTX&FVTX 9/30/2010 Undefined detector subsystem maintenance and repairs10/7/2010 RPC1 and Absorber upgrades10/7/2010 Roll in EC10/7/2010 VTX and FVTX Services and commissioning10/30/2010 Prep for run 1210/31/2010 Run 12 cooldown11/1/2010 Note: This schedule is for initial planning and discussion purposes only. More details for the various tasks is necessary before. A detailed schedule can be presented.

6 1/27/2011 Roof leaks in utility bathroom at northwest corner behind tech offices, over door between rack room and assembly hall, over door between control room and elect. ass’y room, southeast corner of IR and laser room. General maintenance for Trailer Offices (in progress) -Repair replace floor tiling as Flooding in AH/ Driveway heaving [Lake PHENIX] New projector for conference room – Add USB Repeater & network connection 2010 Building Maintenance Issues

7 1/27/2011 Trailer Office Space Allocation Space Allocation for run Elec. Engr P. Giannotti (P.Giannotti) 2. Run Coordinator/Chief Engr (D.Lynch) 3. Documents (P. Giannotti) 4. Electrician: (M. Rau) 5. Mu Tr (M. Leitch) 6. PbSc (E. Kistenev) 7. PHENIX Engineering (D.Lynch) 8. Engineering Documents (P.Giannotti) 9. Trailer Conference Area (P.Giannotti) 10. Computer Network Cage (P.Giannotti) 11. Printing & Fax (P.Giannotti) 12. PC (A. Oskarsson) 13. VTX (J. Koster) 14. TOF Aerogel (M. Shimomura) 15. RICH (A. Takahara ) 16. BBC (T. Sugitate) 17. FEM Electronics Lab (J. Haggerty) 18. DAQ /Trigger (C. Chi) 19. DAQ (C. Chi) 20. DC (V. Riabov) 21. PbGl (J. Frantz) 22. Storage (C. Biggs) 23. Analysis Center (RC/PC) 24. MPC/RPC (M. Chiu) 25. Storage (C. Biggs) 26. Ladies’ Bathroom (C-A) 27. Men’s Bathroom (C-A) 28. Storage (C. Biggs) Note: Space is assigned by subsystem/support function not by individual or institution. Name/Group in parentheses is responsible for maintaining the assigned subsystem/ support function space. Changes to allocation must be approved by PHENIX Operations management

8 1/27/2011 PHENIX Procedure Review Current Status: 148 Procedures Identified 85 Made Inactive (not currently in use, will require revision to re- activate if and when necessary, available for reference purposes) 9 CAD procedures relevant to PHENIX, all are up to date and available on the CAD web site 42 PHENIX approved procedures. all are current and up-to-date 11 Proposed/Draft Procedures (never previously formalized) (3 are ready for review) These will be addressed during next few months. Web retrieval of latest procedures now available from PHENIX Internal:

9 1/27/2011 Safety, Security, Etc. Snow, snow, snow: long range predictions for the next month or so are for more of the same. Please be careful when outside and use common sense to stay safe. From the BNL ES&H Directorate we get these words of wisdom: Given the weather and snow and ice conditions, please keep the focus and continue to be careful walking and driving. Freeze and thaw cycles are creating slippery patches of black ice that can and do cause people and vehicles to slip. Encourage staff to wear appropriate footwear for snow and ice conditions. If desired, change into dress shoes once inside. When exiting your vehicle, keep 2-handed contact with the car until you are sure of solid footing. Choose your route into and out from buildings deliberately, avoiding areas of snow and ice. Walk with your hands out of your pockets. It helps you balance if you slip. “Walk like a duck” over icy patches that can’t be avoided.

10 1/27/2011 Where To Find PHENIX Engineering Info Links for the weekly planning meeting slides, archives of past meeting slides,long term planning, pictures, videos and other technical info can be found on the PHENIX Engineering web site: The Jets fell a little short this year, but we plan to be back next year.