Module Loading Site Qualification G. Darbo - INFN / Genova SQTF, 25 / 11 / 2004 Module Loading TF - Genova Site G. Darbo - INFN / Genova November 25, 2004.

Slides:



Advertisements
Similar presentations
3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:
Advertisements

Air and Water Chiller Basic Class
A “BTeV” Hybrid Pixel Telescope for MTest David Christian May 4, 2007.
Heat and cold generation Meyer Hospital Florence Meeting, 8-9 May 2003.
FACILITIES AND PROPERTY MANAGEMENT – BEMS Plant and Equipment Operating Hours.
Reviewer’s Mandate G. Darbo – INFN / Genova Sensor Review, 4 May 2011 o Sensor Review Slides for Jörn Talk IBL Sensor Review Kick-off Meeting CERN, May,
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
Critical Design Review: Dead Reckoning System for Mobile Robots Lee FithianSteven Parkinson Ajay JosephSaba Rizvi.
IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March 2010 o IBL interim-MoU Annexes Pixel Extended Institution Board CERN, March 1 st, 2010 NCP.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 18 August 2003 Sam Burke UCSB HEP Group.
SQTF: Phone Conference G. Darbo- INFN / Genova SQTF, 03/08/2006 o SQTF - Phone Conference G. Darbo - INFN / Genova Indico agenda page:
2S Module Workshop, 30 Jan 2012 Module positioning and cooling contacts 2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN  The objectives  Module positioning.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Troubleshooting Electric Control Devices
1 TPC online  offline calibration November 2002.
MCS’S MAGNUM DIAGNOSTICS PACKAGE Visit us at
Chiller basics With Phil Rodin. Things to check when chiller is not running or is in alarm.
IBL Slides G. Darbo – INFN / Genova CSN1, 22 November 2010 o IBL Spare Slides Commissione I – 22 Nov 2010 G. Darbo - INFN / Genova.
So… How does Smartcool achieve savings??.  Compressors use 70% of the energy in refrigeration and air conditioning systems.  The cooling cycle is dynamic.
STEAM TURBINE POWER CYCLES. The vast majority of electrical generating plants are variations of vapour power plants in which water is the working fluid.
Back up stave test program status Eric VIGEOLAS Pixel week December 2000 Pre production status Assembling phase comments Geometrical control Stave Qualification.
Pixel/IBL status and plans A.Rozanov A.Rozanov ATLAS-France
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 25, 2004.
IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July 2009 o IBL kick off meeting summary and issues ATLAS Upgrade Project Office.
Stave 4028 Thermal tests Electrical tests. 4028: THERMAL TESTS We have studied the effect of the liquid speed on the modules heating. Test 1: all 13 modules.
Genova Site - Report at SQTF G. Darbo - INFN / Genova SQTF, January 2005 Genova Site Report C.Gemme, G. Darbo, V.Kostyukhin INFN / Genova Copy of.
Loading stave 4000  Receiving test of modules : No problem despite some damages at one edge of few modules (AMS) One MCC failure in one module, reworked.
Valencia Report 5 Pre-qualification (2 mechanical + 3 electrical) All inside mechanical specification in XY after assembled. However, Pre3-Pre5 bad planarity.
1 Recent Updates Stony Brook Crew. 2 Maintenance Week Cryo Gate Valve –Dirt-like black substance on Valve—cleaned –Repair Successful; no more leaks. Rebuilt.
M. Gilchriese Towards Fabrication of a Mechanical Prototype Stave.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
ATLAS ITk - Activities Common Mechanics group (Lukasz Zwalinski, Paolo Petagna, … ) Plant →PP1 DEMO & BABY DEMO 14/03/2016C. Rossi - INFN Genova1 Detector.
7 A/C System Components, Operation, and Service.
Electrical Measurements on stave S4028 Claudia, Fabrizio, Illona After loading, we have done a quick test (RECV) using a single module setup (MAC-based)
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Liverpool March 09 Irradiation Meeting. Graham Beck (QMUL) 1 Dissipated Power: Sensor (at -10C, 200V bias, after protons/cm 2 ) ~ 1W (×3 for.
Rack Refrigeration Systems ©2015 Master-Bilt Products, an unincorporated division of Standex International Corporation. All rights reserved.
S A Griffiths CM42 June 2015 Electrical & Control.
Date of download: 10/6/2017 Copyright © ASME. All rights reserved.
Compact line ‘EW*D~J-’ water-cooled chiller range
Study of Indium bumps for the ATLAS pixel detector
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Stave 4008 Z rubyballs coordinates
Module Loading Task Force Meeting October 21, 2004
MODULE QUALIFICATION STATUS AT LIVERPOOL
Sector 002 Assembly status report
Update on HW commissioning
Energy- and mass flows in cooling and in heat pumps
F. Ronchetti, INFN-LNF, September
10TR Nominal Glycol Chiller
The Stave Thermo-Conductivity QC Procedure Idea
Presentation Test. Second Slide Third Slide It worked.
UCSB Testing Status Anthony Affolder
Elec 2607 Digital Switching Circuits
Tests on a dummy facet of PIX upgrade using CO2 cooling
Cell Simulation Pick and Place Routine.
Update on ATLAS insertable B-layer
FNAL module testing summary
Hybrid & Module Testing Status
Tests of Endcap capillary & Heat exchangers at CERN
Presentation transcript:

Module Loading Site Qualification G. Darbo - INFN / Genova SQTF, 25 / 11 / 2004 Module Loading TF - Genova Site G. Darbo - INFN / Genova November 25, 2004 Copy of this talk on the CDS Agenda:

Module Loading Site Qualification G. Darbo - INFN / Genova SQTF, 25 / 11 / Cooling & Thermal Cycles  Cooling circuit modified:  Lauda RK20-KS with Ethylene Glycol (75%) + H2O (25%) running at - 30ºC to cool the box at ~ -3º  Lauda RP855C with C8F18 to cool or thermal cycle the stave.  Problems encountered with Lauda chillers:  Lauda RP845 break down, under repair -> Given a new and more powerful version in evaluation: RP855 -> faulty behaviour from time to time of the refrigerator…  Lauda RP855 has a pressure/suction pump (see next slide) for fluid circulation in the application. We suspect that the suction generates cavitations in the C8F18 (bubbling) -> fluid lost.  The system is now capable to run thermal cycles between ±30º on the power off modules (see slide)

Module Loading Site Qualification G. Darbo - INFN / Genova SQTF, 25 / 11 / Lauda RP855 Pressure/Suction Pump

Module Loading Site Qualification G. Darbo - INFN / Genova SQTF, 25 / 11 / Thermal Cycles

Module Loading Site Qualification G. Darbo - INFN / Genova SQTF, 25 / 11 / Stave S Electrical Test  LOAD test completed:  Some dead pixel on the first row of several chip (see last week presentation) are not really bad - they respond to source.  Thermal cycles done  STAVE test underway

Module Loading Site Qualification G. Darbo - INFN / Genova SQTF, 25 / 11 / S Robot Upgrade  Third production stave under loading  11 modules loaded -> completed tomorrow.  A Heidenhain Linear Encoder will be added to verify/correct the Z movement of the robot  A better visual inspection/measure digital microscope is under evaluation to improve module positioning in the garage position and to improve the Z precision of the CMM.