First United Methodist Church Katy, Texas Preliminary Master Plan Presentation OCTOBER 6, 2009.

Slides:



Advertisements
Similar presentations
Building for tomorrows leaders Place Campus logo here 11/08/13 – R8 [year] Facilities Master Plan Update [College Name Here] 201X Draft Facilities Master.
Advertisements

FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
BOE Goal: Study long-term facility needs All patrons invited to join Each building and special education co-op represented KIDS Committee met.
Identify source area and COCs Determine nature and extent of discharge Evaluate potential risks to public health and the environment Develop Investigation.
Transport.tamu.edu Parking Garage Feasibility Study TSAC December 5, 2012.
Betsy Kerrison Property Acquisition Town of Kiawah Island Municipal Campus Site October 28, 2014 October 30, 2014.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Cost Impact Analysis Proposed College Station Tree Ordinance.
Building Plan Presentation The Evangelical Lutheran Church of The Holy Trinity.
Classroom Addition Facility Planning funds to study a possible addition Enrollment Projections Increase capacity for 2300 students Program includes 19.
AGENDA – PUBLIC FORUM October 12, Welcome and Background – Rod Lehnertz 2.Site Evaluation Progress Report – Joe Hibbard 3.Public Discussion 4.Closing.
Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM Presented.
1 Manassas Park Town Meeting 29 October Welcome This is the first Manassas Park Town Meeting Governing Body implemented this as a way to improve.
1 Agenda District Board of Church Location and Building Meeting Objective To bring District up to date with renovation of Annex (complete) To receive constructive.
Logo. PRELIMINARY SITE PLAN PROGRAM GOALS Embrace & live out our Mission Grow in commitment to Christian living through: Education, Worship, Stewardship,
City of Fitchburg, WISAA Design Group + Teska +Montgomery NORTH STONER PRAIRIE NEIGHBORHOOD PLAN Steering Committee Workshop: Plan Vision, Principles,
CALIFORNIA STATE POLYTECHNIC UNIVERSITY, POMONA | MASTER PLAN UPDATE CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AGENCY Bulldog Drive Improvements Right-of-Way and Design September 21, 2010 Presentation for SR 100 CRA.
Kittery Schools Reconfiguration Plan Update May 26, 2009.
Multi-Modal Transit Center at Taylor Street: Project Overview and Uses for the Upper Floors Public Forum October 16, 2013.
Existing Pedestrian Paths Existing & Proposed Pedestrian Paths.
Given Connections Solution
Platting Update Orange County BCC January 27, 2015.
Space Needs Assessment: Outcomes Space Needs Survey Assumptions Existing Parking Existing Uses Key Issues Potential Uses Other Considerations.
APRIL 2, Superintendent proposes to consider construction of new administration building to Board May 2010 Board gives approval to begin search.
Building 100 Remodel - Feasibility Chabot College
Advisory Committee Meeting October 1, 2013 – 1 pm to 3 pm.
Main Building Utility Plan Phase 1 - Study PRE-SUBMITTAL CONFERENCE May 14, 2008, 9:00 AM.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
Broadview Second Access. Parlette Annexation What has changed? Parlette has asked for reconsideration –Recitals in agreement are not operative provisions.
Grace Bible Church Ministry Goals & Master Plan Presentation.
St. Thomas à Becket Church Timberland October 2011.
MTAC Program Evaluation Survey 2003  Better Understand Membership Needs  Identify Actions Needed to Better Achieve MTAC’s Purpose.
First United Methodist Church Katy, Texas Preliminary Master Plan Presentation September 29, 2009.
1 Cary Wayfinding Program Town Council Worksession #2 February 23, 2010 Juliet Andes, Planning Doug McRainey, PRCR John Bosio, Merje.
North Carolina Community College System H. Martin Lancaster, President Fifty-eight Institutions Educating and Training a World-Class.
Welcoming Heart. “Welcoming” grows on You! Welcome!!! Church Fix Up Team
 Introduction by the Chair  Confirmation of public notice  Municipal overview of planning applications  Public comment  Council & public questions.
UTILITY EASEMENTS AND SUBDIVISIONS Prepared for Rapid Fire Case Studies October 31, 2012 Present by Donald A. Fisher, MAI.
Presented by: Servus Place – A Plan for the Future Report on Public Consultation and Revised Plans Diane Enger Director Servus Credit Union Place March.
ULCH Stormwater Fees An Equivalent Stormwater Unit (ESU) is calculated so 1 ESU covers the average impermeable surface in one normal city lot Given all.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
AGENDA Chair’s Report & Minutes Approval7:30 – 7:40 AM Briefing: Proposed Mayor’s Office of Planning and Community Development7:40 – 8:20 AM Robert Feldstein,
UTSA WAYFINDING September 29, 2010 Business Affairs: Your Partner for Successful Solutions Next Steps.
CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
St. Mary Magdalene Catholic Church Town Hall Conversation.
Aquatic Facility Concept Design. “Every Dog has its Day” Park Valley Pool Pool is 28 years old and nearing the 4-9 years of identified life expectancy.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
Campus Master Plan Online Survey Summary. Survey: Faculty, Staff & Students.
Florida SUS Board of Governors Campus Master Plan Regulation 6C-21 Workgroup Florida Collaborative Resources Consortium Florida State University/University.
1 Temporary Construction Staging Area Licensing Agreement for Peabody Hotel April 1, 2008 Orange County Convention Center.
Landscape Design Stakeholder Meeting Palo Alto Regional Water Quality Control Plant 1.
Transportation System Comments Santolina Level ‘A’ Master Plan.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
6/15/2001Y. Diana Wu1 National Conference on Asian Pacific American Librarians San Francisco, California June 13-15, 2001.
CONGREGATIONAL MEETING July14th, 2015 ORIGINAL OBJECTIVES OF THE PROJECT JORDAN TEAM 1)Investigate the unused portions of our land – either for ministry.
Concept Design Community Center Proposed Spaces New Construction63,000 SF – Gym Spaces13,500 SF – Fitness Center 9,000 SF – Walking Track 4,000 SF – Multipurpose.
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission EA DA New NE MLK & Multnomah.
ASHLAND TOWN HALL May 10, Ashland Town Hall  Dedicated April 12, 1955  Plan for the next 50+ years  Strategic Plan:  Initiative – Develop.
Public Safety Facilities Plan. Goal Make Recommendations to the BOS regarding the location of Public Safety Facilities This is a 50 year decision – Plan.
Presented by Kelsey Lang, Planning Associate June 27, 2016
Community Meeting, July 18, 2016 Update Designs and Phasing
2006 Facilities Master Plan Update Cañada College
Willow Meadows Civic Club Meeting September 13, 2011
PROJECT PLANNING MEETING
Demolition Ordinance Updates
CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
Comprehensive Plan Update Work Session #4b – Land Use
3rd Meeting of the IHO Council
Presentation transcript:

First United Methodist Church Katy, Texas Preliminary Master Plan Presentation OCTOBER 6, 2009

 Review Owner Comments  Present Additional Options / Issues The purpose of presenting these additional Options is not to present a final solution, but to highlight issues that arose from the last meeting and to reassure the state holders we are listening and the issues will be investigated including in this case relocation of easement, relocating the “front door” to the Church, etc…  Discussion Agenda

Submitted Comments / Questions:

PROS: ALLOWS CONSRUCTION W/O DISPLACEMENT OF EXISTING FELLOWSHIP HALL REMAINS BLDGS. CENTRALIZED CONNECTED, CONTIGOUS AND UNDER COVER PROMOTES “CAMPUS” ENVIRONMENT VEHICULAR VS. PEDESTRAIN CIRCULATION SEPARATED “WAYFINDING” IMPROVED PARKING IS EVENLY DISTRIBUTED CONS: ADDED COST OF ~$100,000 TO $150,000 TO RELOCATE UTILITIES / EASEMENT POTENTIAL LOSS OF LAND DUE TO DEDICATED EASEMENT LIMITED TREE REMOVAL WITH TWO (2) FLOORS MAX. AVAILABLE LAND IS REDUCED NOTE: INFORMATION AT THIS STAGE INCLUDING COST ESTIMATES ARE “GENERAL” IN NATURE AND WOULD HAVE TO BE CONFIRMED

PROS: DAY SCHOOL ADJACENT TO FAMILY LIFE CENTER FELLOWSHIP HALL REMAINS MAJORITY OF BLDGS. CENTRALIZED ALL BUILDING ARE CONTIGUOUS/CONNECTED PROMOTES “CAMPUS” ENVIRONMENT VEHICULAR VS. PEDESTRAIN CIRCULATION SEPARATED “WAYFINDING” IMPROVED CONS: ADDED COST OF ~$100,000 TO $150,000 TO RELOCATE UTILITY/ EASEMENT POTENTIAL LOSS OF ADDITIONAL LAND DUE TO DEDICATED EASEMENT LIMITED TREE REMOVAL SIGNIFICANT DISPLACEMENT RELOCATED CHURCH IN THIS OPTION IS PHASE 1 PRIORITY WHICH DOES NOT REFLECT SURVEY RESULTS NOTE: INFORMATION AT THIS STAGE INCLUDING COST S ARE “GENERAL” IN NATURE AND WOULD HAVE TO BE CONFIRMED

DISCUSSION