Accelerate the Construction of the UHV Power Grid and Promote the Sustainable Development of Chinese Power Industry Liu Zhenya State Grid Corporation of.

Slides:



Advertisements
Similar presentations
Dong Yanfei CEWP Chinese Secretariat Ministry of Water Resources, Peoples Republic of China 9 October 2013.
Advertisements

The Development Priorities of China ’ s of 11th Five-year Plan XU Lin( 徐林) National Development and Reforming Commission of PRC
Atlas Copco Group Q4 Results February 2, Q4 - highlights  Order growth continued  Record operating profit –All business areas above 20% operating.
Baltic Energy Strategy Einari Kisel Director of Energy Department.
1 Strategy of electric power industry development in Russia for the period up to Director of OJSC «ENIN», Academician of RAS Eduard P. Volkov.
Transboundary Water Issues in China Luwei Ying & Xianlong Hou CE 397 – Transboundary waters.
Address Water challenges with joint hands for promoting sustainable development Address Water challenges with joint hands for promoting sustainable development.
中 国 水力资源与开发概况 Overview of Hydropower Resources and Development in China Zhou Shangjie China Society for Hydropower Engineering.
1 Reform of Electricity Industry & Construction of Electricity Market In China Northeast East South Centre Northwest North Sitsang Taiwan Zhang Diansheng.
Energy Prospects in the Mediterranean Region Dr Houda Ben Jannet Allal Energy Prospects in the Mediterranean Region Dr Houda Ben Jannet Allal Geneva, 31.
The Need for an Energy Grid in the Maldives
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
Towards a Low Carbon Future: China’s Green Development Policy and Practice Ye QI Climate and Carbon Policy Institute (CPI) Tsinghua University & China.
Review and Outlook of China’s Economic Development LIU, Shijin Director of General Office and concurrently Director-General of Research Dept. of Industrial.
International Cooperation in China’s Poverty Reduction Jiang Xiaohua Director General Foreign Capital Project Management Center Of LGOP October 19, 2007.
The Status Quo, Barriers, and Countermeasures to Small Hydropower Development in Rural China Hydropower and Rural Electrification Development Bureau, the.
Input-Output Analysis of Climate Change: Case Study of Efficiency Driven Policy Choice of Indian Response Strategy Joyashree Roy Jadavpur University, Kolkata,
Promoting Energy Efficiency In Buildings in Developing countries.
Economic Impact of Poor Power Quality on Industry Nepal Adopted from The Internet for Educational Purpose Sudaryatno Sudirham October 2003.
China’s Sustainable Energy Policy
China Thermal Power Efficiency Project WB support to the improvement of coal-fired power generation efficiency in China Jie Tang Energy Specialist East.
Energy Development in China - From a View Point of Sustainable Development Yang Hongwei, Zhou Dadi Energy Research Institute, P. R. China
INTERNATIONAL ENERGY AGENCY World Energy Outlook: Key Strategic Challenges Maria Argiri Economic Analysis Division.
China’ s Labor Market and Proactive Employment Policy By Liu Yanbin.
WELCOME TO GUANGXI. Economic Development in Guangxi Location: in the South of China Land Area: 230, 000 Square KM.
1 TECHNOLOGICAL CONSIDERATION ON ENERGY COOPERATION OF N-E ASIA OCTOBER, 18, 2002 SUNWOO, HYUN-BUM.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
Study of Chinese Seed Project Informationization Shang Shuqi Qingdao Agricultural University Shandong,China Tel
An Introdution of Energy Situation and Policy of ROK September 2010 Park, Jimin.
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
Turkish Power System Overview March 2012
5 th World Water Forum 5 th World Water Forum Challenges Facing China and the Way Ahead CHEN Lei Minister of Water Resources People’s Republic of China.
国家开发银行 China Development Bank 1 Overview of China Development Bank March 30, 2010.
China NPP Development and Financing Li Kang Department of Nuclear Power CNNC.
WORLD ENERGY OUTLOOK OIL & GAS SUPPLY MOEB/D Existing New Actual
W. Schufft: Challenges for electrical power engineering IP 2007, Pernink Challenges for Electrical Power Engineering.
Several problems in implementation of the investment programs in power industry Speaker: A.Y.Kopsov, Member of the “Nice Club”, Doctor of Technical Science,
Updates on the RFE Energy Sector and the RFE LEAP model, and Implications of a Regional Alternative Path for the Russian Far East Victor Kalashnikov Economic.
Speech by Chinese Ambassador Xu Jianguo at Sister Cities New Zealand (SCNZ) 2012 Annual Conference May 10 th 2012.
Influence of Agricultural Policy on Chinese Food Economy TINGSI WANG.
Overview of the Cooperation and Major Schemes Bok-Jae Lee Senior Research Fellow.
VUJE, a. s., Okružná 5, Trnava Strengthening the European Union Energy Security Prepared by Peter Líška (Slovak proposal) Brussels, 14th September.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Yunnan Provincial Energy Administration, P.R.China Developing Low-carbon Energy to Contribute to Humanity Low-carbon Energy Development in Yunnan Province,
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Developing Africa’s energy potential and integrating power supply systems for sustainable development in African countries (case of Niger)
ENERGY SECURITY AND ENERGY UNION PERSPECTIVES FOR COUNTRY October/20/2015 CSF, Brussels BETTER RESEARCH, BETTER POLICY, BETTER REFORM
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
The added value of the Wind Energy Roadmap Christian Nath – TPWind Executive Committee.
1 Change in China’s Foreign Policy and The Belt and Road Initiative CHEN WENLING.
1 Strategic Plan | May Decisions on rates, budgets, investments, programs and services for six years ( ) The Strategic Plan.
Policy questions to be addressed and structures of IMACLIM-CHINA Wang Yu Institute of Energy, Environment and Economy Tsinghua University 29 January 2015.
Building the Belt and Road Sharing Opportunities of Prosperity Wu Yan Economic and Commercial councellor of Chinese Embassy.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
Resources Conservation and Environmental Protection in the Outline of the Twelfth Five-Year Plan for National Economic and Social Development of the P.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
Promote energy efficiency buildings and strengthen international cooperation Shen Longhai Senior Advisor, NDRC Energy Research Institute Director, EMCA.
A Global Energy Interconnection to Promote Clean and Green Development FOR FGV MAY 2016.
Work Together For a Bright Future November 18, 2014.
CARILEC. An Association of Electric Utilities CARILEC An Association of Electric Utilities The Caribbean Electric Utility Service Corporation (CARILEC)
NS4960 Spring Term 2017 China: Shift Away from Coal
Vice Minister of Water Resources, China
Chairman of the Board and CEO,
International Renewable Energy Agency
Department of Economics
NS4960 Spring Term, 2018 China: Expanded Renewables
POWER GRID INTERCONNECTIONS IN CHINA
Wide Gap between Regions Challenges China’s Development
NS4960 Spring Term 2018 China: Shift Away from Coal
Presentation transcript:

Accelerate the Construction of the UHV Power Grid and Promote the Sustainable Development of Chinese Power Industry Liu Zhenya State Grid Corporation of China October 24 th 2005 VLPGO 2005

Basic Situation of China’s Power Grid

The development of installed capacity in China 440GW By the end of 2004, the total installed capacity had exceeded 440GW with annual power generation of 2190TWh. Starting from 1996, both installed capacity and annual power generation in China have ranked No. 2 in the world. By the end of 2004, the total installed capacity had exceeded 440GW with annual power generation of 2190TWh. Starting from 1996, both installed capacity and annual power generation in China have ranked No. 2 in the world. GW

State Grid Others North east North China North west East China Central China South South TaiWan China now has 897,000 km of power transmission lines with voltage of 35kV and above, total power transformation capacity of 1.57 billion kVA. China now has 897,000 km of power transmission lines with voltage of 35kV and above, total power transformation capacity of 1.57 billion kVA. A primary nation wide interconnection has been formed in China covering six large regional power grid.

In 2004, inter-regional energy transmission has reached 65.3 billion kWh. It is estimated to reach 74 billion kWh in In 2004, inter-regional energy transmission has reached 65.3 billion kWh. It is estimated to reach 74 billion kWh in Northeast Northeast North China Northwest Central China ACDC TaiWan South East China

Since 1997, there is no major faults related to stability happened in China. The average service reliability for urban grid has reached % in Since 1997, there is no major faults related to stability happened in China. The average service reliability for urban grid has reached % in 2004.

The service area of State Grid Corporation of China covers 26 provinces in China, accounting for 90% of Chinese national territory. SGCC provides electricity to more than 1 billion people. In the year 2004, SGCC’s total asset exceed 1100 billion RMB; total electric power sales volume reached billion kWh with total sales income of billion RMB, all of which honored SGCC ranked No. 40th among the FORTUNE GLOBAL 500 The service area of State Grid Corporation of China covers 26 provinces in China, accounting for 90% of Chinese national territory. SGCC provides electricity to more than 1 billion people. In the year 2004, SGCC’s total asset exceed 1100 billion RMB; total electric power sales volume reached billion kWh with total sales income of billion RMB, all of which honored SGCC ranked No. 40th among the FORTUNE GLOBAL 500

Opportunities and Challenges Opportunities and Challenges

Challenges in Grid Construction By the end of 2004, the per capita installed capacity was only 0.34kW with per capita generation of 1670 kWh By the end of 2004, the per capita installed capacity was only 0.34kW with per capita generation of 1670 kWh TWh Power consumption Installed Capacity GW China’s GDP will reach 4000 billion US dollars in the year At that time, the total power consumption will be around 4600 TWh, and total installed capacity will reach 1,000GW. China’s GDP will reach 4000 billion US dollars in the year At that time, the total power consumption will be around 4600 TWh, and total installed capacity will reach 1,000GW.

Newly Installed Capacity from 1995 to 2005 Newly Installed Capacity from 1995 to 2005 GW

In the coming 15 years, Chinese annual power consumption growth will reach 170 TWh, annual newly installed power generation capacity will exceed 33 GW. In the coming 15 years, Chinese annual power consumption growth will reach 170 TWh, annual newly installed power generation capacity will exceed 33 GW. Due to long lasting under-investment of Chinese power grid, plus large scale of power generation units put into operation in recent years, the conflicts brought by a under-developed power grid becomes very distinct. All of these for the development of Chinese power grid are both precious opportunities and big challenges. Due to long lasting under-investment of Chinese power grid, plus large scale of power generation units put into operation in recent years, the conflicts brought by a under-developed power grid becomes very distinct. All of these for the development of Chinese power grid are both precious opportunities and big challenges.

China has constituted and prepared to implement the 11 th five- year- plan for national economic and social development from 2006 to In the coming five years, China ’ s development goal is to be inherent on scientific developing guideline, vigorously adjust our economic structure, change the economic growth pattern, improve development quality and make good efforts to make our society grow in a healthy and sustainable way. China has constituted and prepared to implement the 11 th five- year- plan for national economic and social development from 2006 to In the coming five years, China ’ s development goal is to be inherent on scientific developing guideline, vigorously adjust our economic structure, change the economic growth pattern, improve development quality and make good efforts to make our society grow in a healthy and sustainable way. 2. The sustainable economic, social and environmental development raised a new task for electric power and power grid 2. The sustainable economic, social and environmental development raised a new task for electric power and power grid

According to the plan, China will reduce its unit energy consumption of GDP ratio by 20 percent by According to the plan, China will reduce its unit energy consumption of GDP ratio by 20 percent by To promote sustainable development of economy and society in a coordinated way with economic, clean and stable development in power industry is the direction in the future. China must insist on an intensive development way, attach great importance and strengthen energy saving and environmental protection, contribute our best efforts to the construction of conservation society. To promote sustainable development of economy and society in a coordinated way with economic, clean and stable development in power industry is the direction in the future. China must insist on an intensive development way, attach great importance and strengthen energy saving and environmental protection, contribute our best efforts to the construction of conservation society.

3. The development pattern of Chinese power grid must concentrate on improvement of resources configuration optimization ability. The coal and hydro power mainly allocated in western and northwest China, but the energy resources and power consumption are mainly located in Eastern China and Central China where economy is relatively more developed. The distance between energy base and load center are normally km. The coal and hydro power mainly allocated in western and northwest China, but the energy resources and power consumption are mainly located in Eastern China and Central China where economy is relatively more developed. The distance between energy base and load center are normally km. These basic facts determine that China have to optimize nation wide allocation of energy resources, and realize large scale and long distance inter-regional transmission of power with compensated balancing between thermal power and hydro power in order to realize the effective exploration and efficient utilization of resources. These basic facts determine that China have to optimize nation wide allocation of energy resources, and realize large scale and long distance inter-regional transmission of power with compensated balancing between thermal power and hydro power in order to realize the effective exploration and efficient utilization of resources.

The existing power system based on 500kv is weak in interconnection, Interregional and inter-provincial power exchange capacity is not sufficient, resulted in unsatisfying the demand of resources, but also bringing negative impacts to the safe and stable operation of power grid and reliable power supply due to issues like long-term overloading of major connection lines and short currency over limit become more and more imminent. In order to effectively secure the power supply for future economic and social development, we must start construction of a strong network based on higher voltage level. The existing power system based on 500kv is weak in interconnection, Interregional and inter-provincial power exchange capacity is not sufficient, resulted in unsatisfying the demand of resources, but also bringing negative impacts to the safe and stable operation of power grid and reliable power supply due to issues like long-term overloading of major connection lines and short currency over limit become more and more imminent. In order to effectively secure the power supply for future economic and social development, we must start construction of a strong network based on higher voltage level. 4. It is urgent to construct higher voltage power grid.

The Construction of UHV power grid is the tendency of the development of State Power Grid in the future.

Base on analysis of current situation and power supply characteristics, and according to the development trend of power industry and power grid in China, State Grid Corporation of China brings forward the development concept of accelerating the construction of UHV power grid with 1000KV AC and±800KV DC power transmission. Base on analysis of current situation and power supply characteristics, and according to the development trend of power industry and power grid in China, State Grid Corporation of China brings forward the development concept of accelerating the construction of UHV power grid with 1000KV AC and±800KV DC power transmission. 1. The construction of UHV power grid is the objective for the development of Chinese power industry.

UHV power grid will push the intensive development of large coal-power, large hydro-power and large nuclear power, which will promote the effective exploration and utilization of energy resources in Western China area such as Xinjiang Autonomous Region and Tibet Autonomous Region; improve the comprehensive energy utilization efficiency; and promote international electric energy exploration and cooperation with surrounding countries. UHV power grid will push the intensive development of large coal-power, large hydro-power and large nuclear power, which will promote the effective exploration and utilization of energy resources in Western China area such as Xinjiang Autonomous Region and Tibet Autonomous Region; improve the comprehensive energy utilization efficiency; and promote international electric energy exploration and cooperation with surrounding countries.

For long-distance, large capacity power transmission, UHV transmission line has distinctive advantages. The construction of UHV power grid can greatly reduce line loss, decrease transmission circuits, saves land resources and construction investment. For long-distance, large capacity power transmission, UHV transmission line has distinctive advantages. The construction of UHV power grid can greatly reduce line loss, decrease transmission circuits, saves land resources and construction investment. The construction of UHV power grid can also fully exert the network benefits of large power grids; improve security and economic operation level of the power grid. Especially by researching and manufacturing of those key technology and equipments of UHV, it will promote Chinese electric power technical innovation, improve the manufacturing standards of Chinese manufactures. The construction of UHV power grid can also fully exert the network benefits of large power grids; improve security and economic operation level of the power grid. Especially by researching and manufacturing of those key technology and equipments of UHV, it will promote Chinese electric power technical innovation, improve the manufacturing standards of Chinese manufactures.

According to the plan, it is anticipated that around 2020, the UHV backbone network will be preliminarily completed. The ability and scale of power grid to optimize resources allocation will be greatly improved. This will greatly improve efficient exploration and utilization of Chinese energy resources. At that time, SGCC will form a power grid with interregional or even international transmission capacity over 250GW by UHV line. The operational stability and anti faults ability will also be greatly improved. According to the plan, it is anticipated that around 2020, the UHV backbone network will be preliminarily completed. The ability and scale of power grid to optimize resources allocation will be greatly improved. This will greatly improve efficient exploration and utilization of Chinese energy resources. At that time, SGCC will form a power grid with interregional or even international transmission capacity over 250GW by UHV line. The operational stability and anti faults ability will also be greatly improved.

By organization and coordination of relevant government agencies, SGCC is actively promoting the UHV power grid development planning, key technology research and preliminary work for relevant projects. Productive progress has been achieved. By organization and coordination of relevant government agencies, SGCC is actively promoting the UHV power grid development planning, key technology research and preliminary work for relevant projects. Productive progress has been achieved. The successful completion and operation of 750kv project in this September has accumulated precious experiences for us. The successful experiences of UHV transmission line construction and operation in the world also provide us with instructive references. The successful completion and operation of 750kv project in this September has accumulated precious experiences for us. The successful experiences of UHV transmission line construction and operation in the world also provide us with instructive references. 2. The Chinese Government attaches great importance and highly support the SGCC’s concept on developing UHV power grid.

At present, the research and development of the first 1000kv AC UHV project is urgently being carried out. We will try our best to have an earlier start for the project. At present, the research and development of the first 1000kv AC UHV project is urgently being carried out. We will try our best to have an earlier start for the project. UHV power grid is an important orientation for technical development of power grid. The development of Chinese UHV power grid will vigorously promote the self-innovative of electric power industry and will surely push the power grid technology development and application in world wide. State Grid Corporation of China do hope to strengthen our cooperation with all utilities in various countries. UHV power grid is an important orientation for technical development of power grid. The development of Chinese UHV power grid will vigorously promote the self-innovative of electric power industry and will surely push the power grid technology development and application in world wide. State Grid Corporation of China do hope to strengthen our cooperation with all utilities in various countries.

VLPGO has provided Chinese and foreign power grid utilities a nice platform to further communicate and cooperate. We highly value the opportunity and look forward to launching international cooperation based upon equality and mutually sharing benefit principle to achieve high efficiency and jointly work together for the goal of sustainable development of power industry for our countries. VLPGO has provided Chinese and foreign power grid utilities a nice platform to further communicate and cooperate. We highly value the opportunity and look forward to launching international cooperation based upon equality and mutually sharing benefit principle to achieve high efficiency and jointly work together for the goal of sustainable development of power industry for our countries.

Thank you!