Herschel/Planck January 13, 2005PACS IQR - SCI-PT/332021 ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.

Slides:



Advertisements
Similar presentations
PACS IHDR 12/13 Nov 2003 Overview and Mechanical/Thermal IFs to FPU 1 MPE J. Schubert PACS IHDR.
Advertisements

Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PACS Management, …1 PACS Management, Funding and Schedule Otto H. Bauer MPE Garching.
1 GAIA System Level Technical Reassessment Study Final Presentation ESTEC, April 23rd 2002 Part 1b Development & AIV.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
Turin. ALTEC. ExoMars Progress Report ExoMars Science Working Team
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
IMPRS June Space Research, in praxis, illustrated by a ground-based example The „Ozonometer“ as a student project.
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
Current Safety Status Phase III Flight Safety Review 12 Jan 2009.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IIDR 01/02 Mar 2001 PACS  -ISVR 1  -ISVR Recommendations Introduction and Close-out A. Poglitsch.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
Development programs and model philosophy1 Preliminary design review Prototype program Critical design review Qualification program Qualification review.
COROTWEEK n°8 Toulouse May the 24th, 2005 Program Status (Th. Lam-Trong) 1 COROT.
PACS IQR 13 Jan 2005 IHDR Close-out1 Close-out of IHDR: Concerns / Recommendations A. Poglitsch.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
PACS IBDR, Garching 27/28 Feb 2002 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause J. Katzer (ZEISS) Max-Planck-Institut für Astronomie, Heidelberg.
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
PACS IQR ESTEC, 13 Jan 2005 Documentation1 G. Wildgruber MPE Garching Introduction to Documentation - CQM/AVM EIDP and IQR-
PACS IQR 13 Jan 2005 First Assessment1 The PI’s Self-Assessment A. Poglitsch.
- Introduction - Procurement status - Main milestones EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Schedule.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
DPE CSSW Process Model Annex A WP-400 ECSS Case Study.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
SPICA / AIV&T issues Spacecraft test program & model philosophy
Test Readiness Review 23 October 2003 CRAL - LYON.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
GOES Program October 1, 2002 Steven P. Kirkner GOES Program Manager, NOAA/NESDIS.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
PACS SVR 22/23 June 2006 Test Campaigns1 Overview of PACS Test Campaigns Helmut Feuchtgruber MPE.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
PACS IIDR 01/02 Mar 2001 EGSE1 Otto H. Bauer MPE.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
PACS IBDR 27/28 Feb 2002 PACS ICC1 ICC (EGSE, IA/QLA, HCSS) Otto H. Bauer MPE Garching.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
K. Mercier, Shanghai meeting, 19th-22 May 2014 CNES, 5 th June 2014 Karine MERCIER EUSO Balloon Key Point Flight Acceptance Organisation.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
PACS IHDR12/13 Nov 2003 Warm Electronics1 Warm Electronics: Overview, Interfaces, Grounding and EMC Martin von Berg PACS IHDR.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PA/QA Status1 O.H. Bauer MPE Garching PA/QA Status.
PACS IHDR12/13 Nov 2003 Cryo Harness1 Cryo Harness, Test Cryo Harness Martin von Berg PACS IHDR.
SPF MAG Quarterly Report – Feb 2015
The European Contribution to eXTP
First Stage Cryogenic IF Amplifier
GLAST Large Area Telescope
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
Update on EUMETSAT CEOS Plenary 2018 Agenda Item # 4.3
Instrument Overview Larry Springer HMI Program Manager
Presentation transcript:

Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt Herschel/Planck Project

Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ Instruments Review Cycles in Perspective Instruments: ISVR IIDR IBDR IHDR IQR … IFAR Spacecraft ITT SRR PDR CDR … Phase B Phase C/D Launch

Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ From Qualification to Flight Acceptance CQM at module (EQM) level : Delivery (DRB)  Test readiness (TRR)  Test review (PTR) 2005 After CQM System Campaign hold a Instrument Status Review FM at instrument level: ILT TRR  ILTs  ILT Test review prior to warm-up (PTR) 2005 To decide on need for further tests or to terminate & deliver FM at module (PLM) and system level: Delivery (DRB)  Test readiness (TRR)  Test review (PTR) 2006 In preparation of FAR Instrument Status Review

Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ Herschel Status Herschel Payload Module CDR completed in July and Space Segment CDR completed in October with official close-out end 2004 Herschel EQM - Ready for Herschel CQM Focal Plane Units. All Herschel Instruments: HIFI, PACS and SPIRE have successfully completed CQM Instrument Level Tests. All instruments delivered and in ASED OTN. (N.B. SPIRE to be returned 17 th January) Instrument testing to commence April 2005 Instrument FM program underway – Baseline delivery Nov 2005

Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ Herschel EQM

Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ Herschel PFM status All units passed CDR, manufacturing well underway Optical bench delivered HTT delivered, most cryo-components, instrumentation, MLI integrated HOT delivered instrumentation, cryo- components and MLI mounted. Tank integrated on framework. Both fully integrated Cylinder thermal shields delivered-Others completed CVV cylinder delivered-Upper and lower bulk head imminent. Integration to be completed by May 2005; first cool-down with MTD instrument prior to shipment to ESTEC for STM campaign

Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ Instrument Qualification Review - Objectives Ref: IQR Proceedings - v2 Aug 26, SCI-PT/27108  Confirmation of instrument CQM hardware/software qualification  Completion of instrument design verification  Assessment of performance and compliance with sci. reqs  Identification and confirmation of improvements for FM  Completion of OBSW design and demonstration of functionality  Confirmation of EGSE design and demonstration of functionality  Confirmation of instrument operability - User Manual

Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ IQR - Proceedings Data Package – complete delivery at K.O. [PACS] Documents as identified in SCI-PT/27108 Presentations as given during the K.O. meeting Review of Data Package [Board] Discrepancies and open issues raised as RIDs RIDs issued up to one week before co-location Answers to RIDs [PACS] Provided, discussed and resolved at co-location Board Report = Result of the three items above [Board]

Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ IQR Timeline K.O. Meeting and Data Pack today Preliminary feedback 18 Jan 2005 Issue of RIDs 02 Feb 2005 Co-location Feb 2005 Issue of Board Report 25 Feb 2005

Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ Review Board / Representatives of third parties Herschel/Planck Project (ESTEC) G. Crone (chair) G. Pilbratt (co-chair) A. Heske (secretary) P. Estaria J. Rautakoski F. Pedersen T. van der Laan Industry Representative G. Doubrovik (Alcatel) SPIRE Representative B. Swinyard (RAL) Funding Agency Representatives M. Falvella (ASI) K. Mercier (CNES) K. Proetel (DLR) H. Schroeven-Deceuninck (Prodex) Experts D. Schink (Astrium) B. Collaudin (Alcatel) G. Coe (ESTEC) F. Marliani (ESTEC)

Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ PACS IQR K.O. - Agenda 09:00Welcome MPE 09:05Review Organization and ObjectivesESA 09:15Introduction – IHDR close-out and docsMPE 09:45Instrument Qualification Status and plans for PFMMPE Mechanical, Thermal, Electrical I/Fs and EMC, Optical 11:45PhFPU Qualification and plans for PFMCEA 12:15Ge:Ga detector arrays QualificationMPE with Coffee Break at 11:00 12:45Lunch 13:45On-Board Software and UMMPE 14:15EGSE, I-EGSE and MIBMPE 14:25CQM/AVM ILT Results MPE 15:30PA/QA StatusMPE 15:40Management and ScheduleMPE 15:55Critical Items and next stepsMPE 16:15Lessons learnt from CQM Integration in IndustryMPE 16:30Questions and ClarificationsAll 17:00First Impressions and FeedbackESA with Coffee Break at 15:15