Summer 2012 A Brief Review of Technology Upgrades at Mead Hall Technology Committee Meeting
Aiken Prep Network Infrastructure Installed HP Procurve 4000m as core switch Located and identified edge switches – Replaced faulty edge switches – Simplified topology Installed pfSense router / firewall Established IPSec VPN tunnel connecting campuses WiFi APs – Installed additional AP – Corrected and matched configuration an all APs
Servers and Services Mead Hall Domain – Domain Membership for all PCs at each campus – Local domain controller at each campus – Elevated domain functional level to 2003 (soon 2008) Hyper-V Server 2012 Hosts – Aiken Prep (production) 2008 R2 domain controller 2012 file server – St. Thaddeus (in progress) 2008 R2 domain controller 2012 file server
Future Upgrades High bandwidth link between campuses WiFi network enhancement at both campuses Raise domain functional level to 2012