Agenda TopicSpeaker Coffee and welcome Project update over last 6 monthsGDM (general stuff, financials etc) Workpackage updatesWorkpackage leaders Demonstrator.

Slides:



Advertisements
Similar presentations
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Advertisements

Report from IWG on Environmental and Propulsion Performance Requirements for Light vehicles (EPPR) 70 th GRPE th January 2015 Geneva Chair: Petter.
TRIUMPH Meeting Cork P. Vorreau WP1 Universität Karlsruhe (TH) Institute of High-Frequency and Quantum Electronics.
GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
WP1 – Project Management Start M0, finish M36 CIP lead Progress to date & plans for next 6 months: –Deliverables –Financials –Audits.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 Plan 1 st period Inova+
All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer PSNC October 20, 2009, Garching.
Workpackage 3 New security algorithm design ICS-FORTH Heraklion, 3 rd June 2009.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
ICS-FORTH WISDOM Workpackage 3: New security algorithm design FORTH-ICS The next six months Cork, 29 January 2007.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
Workpackage 3 New security algorithm design ICS-FORTH Paris, 30 th June 2008.
WP1 presentation Christian Jagersma Bucharest, 1-4 March 2010 Agentschap NL (NL Agency)
2-6th June 2003 WP6 MAMA project WWW WP6 MAMA WWW 4 rd MAMA Meeting ROME, 3-6th June 2003 IFREMER coordinator Responsible
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
Agenda TopicSpeaker Wednesday Coffee and welcome Project update over last 6 monthsGDM (general stuff, financials etc) Workpackage reviews, updates and.
SLHC-PP Admin News Admin guide Time sheets Effort Web Pages 1 st Deliverable Report SLHC-PP Steering Committee Meeting CERN, July 3 rd, 2008.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
WP0 Management Gillian Armitt. Outline Objectives for Year 2 Progress Issues resolved/outstanding Forward planning Electronic submission of Form C.
Biokenaf QLK5 CT th technical meeting Madrid, 27 and 27 th of September 2006 E. Alexopoulou/CRES.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
MODERN Final Review ENIAC MODERN Ref. Technical Annex MODERN_PartB Rev2 v3.7 WP1: Giuliana GangemiWP2: André Juge WP3: Wilmar HeuvelmanWP4: Davide.
WISDOM WP7 Dissemination & Exploitation Start M0, End M36 WP leader is CIP Objectives –Identification of potential groups of users of the developed technologies.
WISDOM WP7 Dissemination & Exploitation Start M0, End M42 WP leader is CIP Objectives –Identification of potential groups of users of the developed technologies.
Overview BT’s contribution to WISDOM in 2 nd semester Dr Carla Di Cairano-Gilfedder BT GCTO Office, Research Department 4 th June 2006, Crete.
WP1 – Project management EuroVO-ICE– First review – 26 October 2010 Françoise Genova, EuroVO-ICE coordinator,1 WP1 Management.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
MODERN 1 st Year Review ENIAC MODERN Ref. Technical Annex MODERN_PartB Rev2 v2.4 WP1: Giuliana GangemiWP2: André Juge WP3: Wilmar HeuvelmanWP4:
WISDOM WP7 Dissemination & Exploitation Start M0, End M36 WP leader is CIP Objectives –Identification of potential groups of users of the developed technologies.
Dunstaffnage Marine Laboratory Oban, Argyll, Scotland PA37 1QA ECASA Kick-off Oban 8-9, December 2004.
1 ENV-NCP-TOGETHER - THE FUTURE - Viorel Vulturescu – ANCS Romania
Agenda TopicSpeaker Coffee and welcome Project update over last 6 monthsGDM (general stuff, financials etc) Workpackage updatesWorkpackage leaders Demonstrator.
Green Partnerships Local Partnerships for Greener Cities and Regions Study visit and 3 rd Steering Committee meeting Freiburg, 14 – 18 October 2013.
-1- Elias Athanasopoulos, ICS-FORTH Software Modeling WP3 Software Modelling WISDOM Simulator Elias Athanasopoulos*, Antonis Krithinakis, George Kopidakis.
Project overview objectives, work plan, milestones and deliverables Mark Stevenson, University of Sheffield Kate Fernie, MDR Partners PATHS Final Project.
Biokenaf QLK5 CT Final meeting Athens Hotel Acropol 26 & 27 February 2007 Efi Alexopoulou CRES.
Consortium building PHOENIX Training Course Laulasmaa, Estonia
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval Annual Review Meeting - Introduction.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
11 June WP4 Forum and dissemination By Kim Haugbølle, WP4 leader Forum meeting 6, DG ENTR, Brussels.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Agenda. WP1 – Project Management Start M0, finish M36 CIP lead Progress to date & plans for next 6 months: –Deliverables –Financials –Annual review –Audits.
NSHIELD Project Meeting Brussels - 15 Feb 2012 Luigi Trono.
Workpackage 3 New security algorithm design ICS-FORTH Ipswich 19 th December 2007.
WISDOM WP6 Manufacturability, Scalability and Functionality Study Start M0, End M35 WP leader is CIP Objectives –Assessment of manufactureability of the.
WP5 – Wirespeed Photonic Firewall Validation Start M27, finish M35 Avanex lead Description of Work –Establish test bed suitable to validated the optical.
ICS-FORTH WISDOM Workpackage 3: New security algorithm design FORTH-ICS Update and plans for the next six months Heraklion, 4 th June 2007.
Work Package 1: Progress and Focus on specific issues 5th Steering Committee Meeting Rijeka, 26/2/2015 Presented by: Mrs Maria Poulou.
WISDOM meeting 29/01/07 Photonic Systems Group Tyndall National Institute R.J. Manning R.P. Webb, X.Yang, R. Giller Tyndall National Institute/University.
WISDOM WP6 Manufacturability, Scalability and Functionality Study Start M0, End M35 WP leader is CIP Objectives –Assessment of manufacturability of the.
Overview deliverables and achievements second reporting period Presentation at 2nd COPRAS annual review, 15 March 2006, CEN/CENELEC meeting centre, Brussels.
Mathias DEPRETZ – EuroVO-DCA Project Manager Work Package 1 – Management First Board Meeting – 2&3 october 2006 WP1 Management EuroVO-DCA Project FIRST.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
WP5 – Wirespeed Photonic Firewall Validation Start M27, finish M41(tbc) CIP now lead Description of Work –Establish test bed suitable to validated the.
Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.
TECHNICAL QUALITY MANAGEMENT Technical Quality Management Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related.
Review Preparation Meeting of the FP7 Project J-AGE Vienna 25th March 2015.
12 th General Assembly Meeting Joint Programming Initiative „More Years, Better Lives ” Rome 18 th November 2014.
11 th General Assembly Meeting Joint Programming Initiative „More Years, Better Lives ” Palermo 22 nd -23 rd May 2014.
4th. Plenary Meeting, Edinburgh, May 2010
Istituto Nazionale di Statistica – Istat
SKADS Controller’s Meeting Timeline Annual Financial Report
OBJECT-ORIENTED APPROACH TO OFFICIAL STATISTICS
Update Interim implementation report and financial statement (December 2006) request from the Commission for additional documents in February –
HERITAGE PLUS – Management Group Meeting
A High Intensity Neutrino Oscillation Facility in Europe
Report on Date: Authors: July 2016 July 2013
Report on Date: Authors: July 2016 July 2013
Presentation transcript:

Agenda TopicSpeaker Coffee and welcome Project update over last 6 monthsGDM (general stuff, financials etc) Workpackage updatesWorkpackage leaders Demonstrator update and plans for next 6 months All Lunch WP5 and the final demonstratorAP + All Proposal for project extension and deliverable timetable All Plans for 3rd annual review in Brussels - tbd AOB

WP1 – Project Management Start M0, finish M36 CIP lead Progress to date & plans for next 6 months: –Deliverables –Financials –Audits

Sums Distributed EU accepted submitted costs including amendments to previous figures 3 rd year sums distributed ~ October 2008

Year 3 Manpower (so far)

Year 3 Spend Spend (so far)

Spend across categories

Progress To Date: Deliverables Deliverable No Deliverable titleDelivery date NatureDissemination level D7.1Project presentationM03PPU D1.1Mid-year technical progress reportM06RCO D2.1Optical firewall architecture with target specifications for the optical sub-systems M06RRE D2.2Outline proposals for algorithm designM06RCO D7.2Web site developmentM06PPU D4.1Optical sub-system boundary conditionsM09RCO D1.2First year technical, administrative and future plan report M12RCO D1.2bFirst year periodic activity reportM12RCO D3.1Security Applications PartitioningM12PCO D4.2Hybrid optical circuit layoutsM12RPU D4.3Outline operating conditions for optical sub- system firmware M15RCO D1.3Mid-year technical reportM18RCO D7.2bMid-term report on WISDOM exploitation and dissemination plans M18RCO D1.4Second year technical, administrative and future plan report M24RCO D1.4bSecond year periodic activity reportM24RCO

Next Deliverables Deliverable No Deliverable titleDelivery date NatureDissemination level D3.2Identification of simplified Security Algorithms Components M24RCO D6.1Manufactureability of the complex sub-systemsM24RPU D3.3Definition of a Security Application Programming Interface: SAPI M30RCO D4.4Hybrid Sub-system DevicesM30PPU D4.5Control firmware and software for hybrid sub-systemsM30PRE D1.5Mid-year technical reportM30RCO D5.1Optical Firewall TestbedM30PCO D5.2Firewall response to simulated security attack.M34RCO D5.3Overall performance of the firewall.M34RPU D6.2Optimum location of optical firewall and optical/electronic balance M35RRE D6.3Scaleability of the optical firewallM35RPU D1.6Third year technical and administrative reportM36RCO D1.7Final project reportM36RPU D7.3Third year report on WISDOM exploitation and dissemination plans M36RCO D7.4Route to commercialisation and exploitation including activity on raising public participation and awareness M36RRE

Workplanning WPMM

Manpower

Next 6 months WP3 & WP4 completing –Electronic controls and firmware will have been delivered –Expect first iteration of hybrid circuits (Jan) and designs for second iteration including integrated memory loop to follow WP5 will become primary focus –Need to decide on final demonstrator –Location? –Available equipment? WP6 –Scaleability in terms of speed (line rate), complexity (number of gates per device) and rule checking scaleability WP7 –OFC09, ECOC 09 –Further discussions with system companies