Report from COEN CAMD Krakow 27 – 28 October 2011 Lars Johansson.

Slides:



Advertisements
Similar presentations
Risk Management in Regulatory Systems An Introductory Webinar.
Advertisements

Authorities role in the assessment of energy efficiency Marianne Lindström, Conference on Energy Efficiency in IPPC Installations, Vienna
Annual Report Executive Summaries Food and Veterinary Office Unit F1-Country profiles, Coordination of Follow-up.
Seventh Framework Programme Grant Agreement No Improving the Organic Certification System Workshop in Brussels, October 14, 2011 Lizzie Melby Jespersen.
RACS coordination meeting 29 May 2008 Brussels. Review of the functioning of the RACs.
Second expert group meeting on Draft fiche on delegated act on the European code of conduct on partnership (ECCP) Cohesion Policy
Working Group on Environmental Expenditure Statistics Luxembourg, March 2015 EGSS data production and dissemination (point 3.1 of the agenda) Eurostat.
28th Meeting of the Competent Authorities Matthias Neumann Federal Ministry of Health, Germany Cracow, 27th of October 2011 Central Management Committee:
TRADE CONTACT GROUP meeting Brussels, 11th May 2012 Item 4: Information on the Commission proposal for the Union Customs Code (Recast) (COM(2012)064 of.
Session 5 – CA work program, results and ongoing work – Report from NBOG Rainer Edelhäuser Zentralstelle der Länder für Gesundheitsschutz bei.
Directorate General for Enterprise and Industry European Commission The New Legislative Framework - Market Surveillance UNECE “MARS” Group meeting Bratislava,
November 2013 Shobu Nagatani Agency for Natural Resources and Energy METI, Japan Progress of the APEC LCMT Project Phase 4 6 th APEC LOW CARBON MODEL TOWN.
Item 5: Vision 2020 Implementation paper – version 1.1 DIME/ITDG Steering Group – item 05 Meeting of 18 November 2015 BECH B2/404.
The New Legislative Framework
Report from COEN CAMD Krakow 27 – 28 October 2011 Lars Johansson.
Water.europa.eu CIS Ad hoc activity on WFD Economic Issues -Progress Update Strategic Coordination Group Meeting, 23 February 2010 DG Environment, European.
CIS-Workshop on „WFD and Hydropower“ June 2007 Berlin, Germany - First Workshop under Phase II ( ) of the EU activity „Water Framework Directive.
Water.europa.eu Priority substances inventoryemissions, discharges and losses Priority substances inventory emissions, discharges and losses Working Group.
Agreement concerning the adoption of uniform conditions for periodical technical inspections of wheeled vehicles and the reciprocal recognition of such.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Legal Metrology in Europe: Harmonising requirements trough directives and the cooperation of authorities trough WELMEC by Knut Lindløv Director Legal.
EQAVET Secretariat Survey Draft analysis NRPs meeting Oct 2014 NRPs meeting, Brussels October 2014.
INTERNATIONAL ELECTROTECHNICAL COMMISSION «Harmonization of the national accreditation system of Eurasian countries» 23 December 2013 Moscow World Trade.
Terms and Conditions Review 2011
EUROPEAID/121737/D/SV/RO - Training in Project Cycle Management, Procurement and Contracting of Pre-Accession Projects and Management of EU Structural.
The New Legislative Framework Miniseminar New Legal Framework Reykjavík, 10 December 2008 Doris Gradenegger Unit C1: Regulatory Approach for the Free.
2010, European Year for combating poverty and social exclusion
NCWG Terms of Reference NCWG April 2016, IHB, Monaco
Patient Participation Group Representative Elections
Grid Code Development Forum – 6 September 2017
15-16 November 2017 Valenciennes, Cité des Congrès
ERIC Experiences and New Developments
DG Environment, Unit D.2 Marine Environment and Water Industry
5. Areas under organic farming
The UN Ad Hoc Committee The process to draft a new human rights treaty for people with disabilities.
MIWP : Deliverables for approval
Basics European Social Model - European Social Dialogue
GBV survey: progress EUROSTAT 20 March 2018.
Updating of the Reporting Guidance for the Floods Directive: Context
ESS Security and Secure exchange of information Expert Group (E4SEG) DIME/ITDG Item 8 ESS Security Assurance Pascal Jacques ESTAT B2 Local Security Officer.
Ag.no.16 A65 country manuals and country assessments
on Priority Substances Strategic Coordination Group
GPC WG and GPC meeting 5th of June “Future of Joint Programming”
1.
Overview US Paper C2-7.INF
LAMAS Working Group 29 June-1 July 2016
WG Environmental Accounts
GUIDANCE ON PLANNING PROCESS GUIDANCE ON PLANNING PROCESS
Item 11 – Conclusions – ETS 2018 WG meeting
Item 8.1 Implementation of the 2016 Adult Education Survey
Draft Mandate and Proposed Approach for the Drafting Group on
MIG-P orientation debate
Developing a common understanding of Articles 8, 9 & 10 MSFD
Water Directors’ Meeting Working Group D (Reporting) activities
LNG Workshop Bilbao, March 13th 2009 GLE.
Progress of intersessional work
Legal and implementation issues update
Meeting of Water Directors State of transposition and implementation
ESS Security and Secure exchange of information Expert Group (E4SEG) Item 1 of the agenda IT security assurance DIME/ITDG SG Meeting London 15/2/20189.
Strategic Coordination Group 2007 Reporting Guidance on Monitoring
Item 4.2 – Towards the 2016 AES Philippe Lombardo Eurostat-F5
Gender Based Violence State of Play Item 5 of the draft agenda
WG E on Priority Substances
Strategic Coordination Group
LAMAS October 2018 Agenda Item 4.1 LMI Review – main scenarios
Doc.A6465/16/03 Ag.no.16 A65 country manuals
IT security assurance – 2018 and beyond Item 2 of the agenda DIME/ITDG Steering Group June 2018 Pascal JACQUES ESTAT B2/LISO.
DG Environment, Unit D.2 Marine Environment and Water Industry
WG A Ecological Status Progress report October 2010 – May 2011
Item 6 Harmonised questionnaire for data collection
Presentation transcript:

Report from COEN CAMD Krakow 27 – 28 October 2011 Lars Johansson

28 th CAMD Krakow Session 5 COEN Election of a new Chair and Co-Chair You are all invited to nominate candidates to the positions as Chair and Co-chairof COEN We would like to have your nomination before the end of January The appointments will take place at the CAMD in DK

28 th CAMD Krakow Session 5 COEN 3 COEN October 2011 Meetings: – 5 th May 2011(18 MS + COM) – 7 th October 2011(19 MS + COM) From those figures it is obvious that there are to many countries that does not take an active part in the work of COEN.

28 th CAMD Krakow Session 5 COEN Work Programme status Guide for Authorised representatives – A revised document was discussed and approved by COEN 7 th October. – After that EAAR has expressed their support for this document – Proposal: CAMD endorse the guide for further processing (MDEG + publication at COM Webb- page)

28 th CAMD Krakow Session 5 COEN Work Programme status Guide for conformity assessment of IVF and ART products – A document has been developed by an ad hoc group set up by FR, PT, SE – The document was approved by COEN in May and it was presented to MDEG in June (invitation to industry to send in comments during summer) Proposal: CAMD endorse the guide for further processing (MDEG + publication at COM Webb- page)

28 th CAMD Krakow Session 5 COEN Work Programme status FAQ - Guide for market surveillance – For the time being we are focusing 67 questions – 39 questions are closed by COEN (6 in cooperation with NBOG) – A compiled list is included in the documentation (clarifications and statements to improve a harmonised implementation). – We ask you all to study those questions and to make use of the answers given.

28 th CAMD Krakow Session 5 COEN Economic operators This issue was discussed during the preparation of 2007/47. After discussion in MSOG (2006) the presidency presented a document that was agreed by MS. The present discussions in COEN are based on 768/2008 and the document from The draft document being circulated to this meeting is the result from two discussion held in COEN (May and Oct). – My impression is that we reached a point where we accept the basic structure of the document and also the majority of the more detailed points. Proposal: The document will be sent to the Recast WG and COM. COEN shall follow the progress of this matter

28 th CAMD Krakow Session 5 COEN Work Programme status IFU for cleaning and re-sterilisation of reusable medical devices – An ad-hoc group is established with members from DE, ES, IE, CH and PT – Work is carried out and a document is announced for the next meeting with COEN

28 th CAMD Krakow Session 5 COEN Addresses 7th June 2011 CMC issued a decision to harmonise the interpretation on what address shall be presented on a MD placed on the market. COEN was asked to appropriately enforce the implementation of this decision. – At the meeting in May it was decided to give manufac- turers a transitional period of one year (1 st September 2012) – A letter from COEN to European branch organisations, notified bodies and WG’s (6 th July) – NCA to inform national MF/AR and other stakeholders Follow up 7 th October: 

28 th CAMD Krakow Session 5 COEN Cooperation with customs authorities TAXUD has launched a project to develop guidelines to improve cooperation between market surveillance authorities and customs. 10 MS has formed a WG and we expect to have a first set of guiding documents in 2012 (an umbrella combined with an information sheet and a checklist describing the different sectors) A proposal set up by COM has been discussed in detail and it will be presented to TAXUD.

28 th CAMD Krakow Session 5 COEN Work program for 2012 COEN is in reality over loaded Difficult to develop and finalise the individual items in due time. - Difficult to have two masters WI:s to be closed/halted Put the development of new answers to FAQ on hold Close the WI on the development of a Guide for Authorised Representatives Close the WI on IVF/ART

28 th CAMD Krakow Session 5 COEN Proposals for new work items CMC has asked COEN to provide – A guide specifying the content of the Declaration of conformity. PL, NL, DK, PT, BE-IVD, FR – Unduly CE market medical devices (Main issue to clarify when we may grant a period of grace) FI – Step by step guide to market surveillance SE Proposal: CAMD endorses the inclusion of the two NWI.

28 th CAMD Krakow Session 5 COEN 13 New Work Programme for Continuation of work programme from 2011 Main focus – To carry on the work with development of the decided guide documents, – To identify and coordinate Market surveillance projects, – Follow the legal development and the impact it will have on market surveillance, – Follow and Co-ordinate actions based on national projects and experiences

28 th CAMD Krakow Session 5 COEN 14 Thank You