Linac2 Review  L2 operated with 99 % uptime in 2010 and 98% in the last 10 years  Systems review: all under control even for L2 till LS2 if ‘nightmare’

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

H. Haseroth July 26 – August 1, 2004 NuFact04, Osaka 1 The 3 MeV H - Test Stand at CERN - The first part of the SPL - H. Haseroth on behalf of the SPL.
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
Linac4 Ion Source commissioning: Vacuum Aspects C.Pasquino, N.Thaus, J.Hansen, P.Chiggiato Linac4 Ion Source Review - 14th November 2013.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
1 Chamonix 2010 Summary of Session 7: Future Upgrade Scenarios for the Injector Complex P. Collier /BE (V. Mertens /TE) Chamonix Summary, 5th Feb 2010.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
TS, Length of YETS EYETS LIU & CONS Project
R Scrivens, D Kuchler, IEFC Workshop  Schedule and Performance  The Source  Other Linac Issues (not exhaustive)  New ions  Final remarks 1.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 111 Middle-Long Term Needs for Ion Beams S.Maury Thanks to T. Bohl, C. Carli, D.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
Linac4 Status 1 M. Vretenar sLHC public event
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
LIU Day – 11 th april 2014 ALESSANDRA LOMBARDI LINAC4 COMMISSIONING OVERVIEW.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Content  The LHC beams produced  LINAC2 & PSB  The PS  The SPS  Super Cycles and N0n-LHC physics  Conclusions IEFC Workshop, 8 March 2012 Rende.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
1 1.Summary of H- source review 2.Options for connection to the PS Booster 1.Summary of H- source review 2.Options for connection to the PS Booster.
J.M. Jowett, S. Maury, PANIC05 HI Satellite meeting, 23/11/ LHC as a Heavy-Ion Collider An update John M. Jowett, Stephan Maury I-LHC Project CERN.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
Summary Session 5 Chamonix 2011, 24. – Session 5: “High Intensity: Present and Future” R. Assmann & S. Redaelli Thanks to Frank Z. for his notes…
Linac4 status and long-term schedule M. Vretenar, Project Meeting  status  timeline  open issues  status  timeline  open issues.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
LHC Injectors Upgrade Project 11/11/2010 R. Garoby.
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
1 NA61/SHINE Collaboration Metting, Dubna, April 7-11, 2014 NA61/SHINE news and plans (October 2013-February 2014) Published papers: Measurements of production.
The CERN Linac4 history, performance, perspectives
ICE SECTION The coolest place to be! Elias Métral
NA61 news and plans (May 2013-October 2013) Publications:
Status and Plans for InCA
Linac4 M. Vretenar for the Linac4 design team
Plans for ions in the injector complex D
EC Activities Status for the LIU
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Acknowledgments: LIU-PT members and deputies, H. Bartosik
How to run ions in the future?
Alexander Herlert, CERN (PH-SME-IS)
LHC status Benoit Salvant (Beams department, Accelerator and Beam Physics group) for the LHC complex teams With many thanks for their inputs to J. Boyd,
LINAC4 commissioning plans etc.
Progress towards Pulsed Multi-MW CERN Proton Drivers
Advanced Research Electron Accelerator Laboratory
Generation of Higher Brightness Beams for LHC
SLHC-PP kick-off meeting, CERN 9 April 2008
The SPL-based Proton Driver at CERN
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Presentation transcript:

Linac2 Review  L2 operated with 99 % uptime in 2010 and 98% in the last 10 years  Systems review: all under control even for L2 till LS2 if ‘nightmare’ scenarios (e.g. DTL quad failure, inter-tank vacuum leak) don’t happen  DTL vacuum sector conditions are delicate and must be kept under close surveillance/control  The first series of consolidation measures for intervention in case of quadrupole faults in Tank 2 are in place and have been tested on dummy loads  Present operational performances:  165mA average at DTL exit  L2-PSB transmission 70%-100% depending on users  Requested current increase to 180mA (Chamonix ‘11):  possible but risky (RFQ sparks, RF tubes lifetime). Can be tested for short periods  MD requested, Replacement of 3 RF tubes during April TS approved  In 2010 radiation levels increased  source of losses not fully understood  new optics shifted downstream the hot spot  for 2011 new BLMs + new optics should help Total downtime= ~964 hrs Total op. time = hrs avg. availability = 98.4% Total downtime= ~964 hrs Total op. time = hrs avg. availability = 98.4% faults – integrated General messages:  as long as we need to rely on L2, risk mitigation must be prepared as much as possible  Long shutdown in requires continuous running of the infrastructure (cooling and ventilation) and monitoring of the Linac temperature and vacuum.  The replacement for LINAC2 faces a tough challenge in terms machine reliability and uptime  Commissioning time for LINAC4 must be sufficiently long to assure a similar performance in term of reliability General messages:  as long as we need to rely on L2, risk mitigation must be prepared as much as possible  Long shutdown in requires continuous running of the infrastructure (cooling and ventilation) and monitoring of the Linac temperature and vacuum.  The replacement for LINAC2 faces a tough challenge in terms machine reliability and uptime  Commissioning time for LINAC4 must be sufficiently long to assure a similar performance in term of reliability In general: optics retuning to improve transmission not unusual IEFC Workshop 2011, LINACS Session

Linac 3 Source Review  Nominal beam parameters just within reach for LEIR with the present performance of the source and Linac3.  ECR source proved to be reliable (96% uptime 2010 to be corrected for low performance periods)  Oven1 typically runs for 2 weeks, so the second oven was used as a backup in 2010 (and used several times).  Trying to refill one oven while keeping the other one in operation is not possible, as the oven movement leads to a long retuning time 28hr, so the highest uptime is found by running, and then refilling both ovens  oven length or diameter could in principle be increased, but not clear if in any case can reach 4 weeks without re-fill. For the moment: foresee 1 stop (1-2 days) per LHC ion run  Stripper mechanism is orphan, needs 250kCHF to change it  Only NA61 + LHC would occupy all L3 time. Any other ion species (apart from Ar and Xe) must be after 2017, unless a dedicated test stand can be found  Request for ion operation for NA61 with Argon and Xenon can be satisfied with current hardware (iThembaLABS will make development and provide a starting point for CERN's studies).  Second ECR source?  if to have spare: for fast switching, it needs to run in parallel with 1st source  if for other ions: needs its own RFQ  New EBIS source?  Choice of future ion source and RFQ needs to be based on desired ion type and beam characteristics. General messages:  Need to define if and for what a second source would be needed  If new source tests are needed, money and resources must be assigned  Need to identify an adequate space for testing a source for new ion species General messages:  Need to define if and for what a second source would be needed  If new source tests are needed, money and resources must be assigned  Need to identify an adequate space for testing a source for new ion species in both cases L3 modif needed, L3 little space IEFC Workshop 2011, LINACS Session

Medium-Long Term Needs for Ion Beams (S. Maury) General messages:  Need a review of the various scenarios in order to establish the accelerator complex planning  One needs to identify any ion choices other than Pb for the LHC in due time to allow sufficient time for the ion beam preparation (we do not even know yet how to generate Deuterons) General messages:  Need a review of the various scenarios in order to establish the accelerator complex planning  One needs to identify any ion choices other than Pb for the LHC in due time to allow sufficient time for the ion beam preparation (we do not even know yet how to generate Deuterons)  Simultaneous ion and proton operation not compatible for the NA.  The new LHC schedule implies the following planning:  Pb-Pb collisions in the LHC from now to 2017: – only Pb beams for the experimental areas during the period of Pb operation in the LHC.  p-Pb beam in the LHC in 2012, 2016 and 2019: – request for 2019 only valid if no d-Pb run is planned for 2019 and no p-Pb in  d-Pb collisions in the LHC as of 2019: – not yet clear how d-beams can be generated in the LHC injector complex. It also requires new RFQ and source commissioning during 2017 shutdown and therefore a decision on this scenario needed by next year (preparation time).  Ar-Ar collisions as of 2014 or 2015: – implies Ar operation in the injector complex as of 2013 (LINAC3 and source and RFQ) and several weeks of Ar beam commissioning in LEIR, PS and SPS – seems to be a very ambitious planning and is not compatible with NOT operating the injector complex in LS1.  Xe-Xe collisions 1 year after Ar-Ar collisions. Same commissioning requirements in LEIR, PS and SPS as for Ar- Ar (source and RFQ already done in 2013).  Ar and Xe source is prepared by ITHEMBA collaboration (but they will not deliver a source to CERN). Dedicated commissioning periods will be required for LEIR, PS and SPS before the beams can be used for physics.  Studies for a Medical program can not start before 2017 (machine time up to 2017 required for above ion commissioning) but decision on ion species should be taken 5 years in advance -> by IEFC Workshop 2011, LINACS Session

LINAC4 Source Review  Prototype source (20-40 mA) needs to be ready by mid 2012 (plus new extraction system and pulsed power supplies) and commissioned by end 2012 to be ready in time for deciding on a LINAC4 connection to the PSB in LS1  very ambitious schedule, but is the current baseline.  Final source after stepwise improvement and test of successive prototypes until 2015  Operational spare and quick ion source exchange mandatory.  Review of the H- source work package planned for June  Present source (based on DESY design)  commissioned to operation at 35keV  operation at 45 KeV not possible due to electron dump design.  Nominal performance not within reach of this source design.  A crash program was launched in August 2010 for investigating the option of using a Cesiated H- source and address the e-dump issue.  Review of options in February 2011:  None of the ion sources matches the required L4 emittance/current/extr.-voltage figure of merit.  Identified 2 options:  modification to the existing sLHC plasma Generator (implement Cesium inlet)  upgrade of the BNL magnetron source to 45 keV  the Linac4 and test stand design must be compatible with both options. IEFC Workshop 2011, LINACS Session

LINAC4 Connection as Possible Backup to LINAC2  50 MeV and 160 MeV proton production possible with LINAC4.  50 MeV: switch off CCDTLs and PIMs  160 MeV: re-match from DTL to PIMS ok  Multi-turn injection into PSB only compatible with 50 MeV:  Assuming a rough performance scaling for the attainable brightness for PSB and LINAC4 operation with 50 MeV protons this might perhaps be useful for LHC operation with nominal bunch intensities 75ns bunch spacing (factor 3 loss in performance as compared to nominal LHC performance)  However, this performance can not yet be guaranteed and more precise estimates require detailed simulations.  Intervention time estimated to 2 to 3 month  The discussions questioned if this could not be significantly reduced provided that preparatory measures are already implemented during LS1 (e.g. new distributor). At the PSB distributor General Messages:  more detailed simulation studies are needed for estimating what proton beam types could be generated in this setup (but definitely NOT nominal LHC beams)  the use of the present distributor is limited to 100us pulse length, new distributor (able to inject 400us and compatible with both L2 and L4) could improve L4 with protons (more studies needed)  The peak current in LINAC4 is limited by the klystron (beam loading) General Messages:  more detailed simulation studies are needed for estimating what proton beam types could be generated in this setup (but definitely NOT nominal LHC beams)  the use of the present distributor is limited to 100us pulse length, new distributor (able to inject 400us and compatible with both L2 and L4) could improve L4 with protons (more studies needed)  The peak current in LINAC4 is limited by the klystron (beam loading) IEFC Workshop 2011, LINACS Session