I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Improving Air Force Scheduling Processes and Tools – A Demonstration.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Project L.O.F.T. Report May 2007 through October 2007 Creating a design to meet stakeholder desires and dissolve our current set of interacting problems.
The Department of Energy Enterprise Risk Management Model
Program Management Office (PMO) Design
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Chapter 2 The Software Process
1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
W5HH Principle As applied to Software Projects
2003 Indigo Technology, Inc. All Rights Reserved Integrated Process Teams Process Management Quality Assurance Configuration and Data Management Program.
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
Contractor Assurance Discussion Forrestal Building Washington, D.C. December 14, 2011.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
The Executive’s Guide to Strategic C H A N G E Leadership.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Purpose of the Standards
Questions from a patient or carer perspective
Software Engineering Institute Capability Maturity Model (CMM)
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Competency Models Impact on Talent Management
Information Technology Audit
Effective Methods for Software and Systems Integration
Chapter : Software Process
Information Security Governance 25 th June 2007 Gordon Micallef Vice President – ISACA MALTA CHAPTER.
How to integrate the parts of your project to achieve success.
Edward B. Farkas, Managing Director, Project Management Practice
N By: Md Rezaul Huda Reza n
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
NIST Special Publication Revision 1
Task: Copyright © 2003 PM tec, Inc; D. Sankey; D. Padelford. All rights reserved. 1 Fast Start For Projects  Electric Dipole Moment Project Facilitator:
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Software Project Management With Usage of Metrics Candaş BOZKURT - Tekin MENTEŞ Delta Aerospace May 21, 2004.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Chapter 11. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Fred Meyer, AF PM&AE 04 February 2010 Air Force Program Management.
Government Procurement Simulation (GPSim) Overview.
SWEN 5130 Requirements Engineering 1 Dr Jim Helm SWEN 5130 Requirements Engineering Requirements Management Under the CMM.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
1 Advanced Project Management Project Plan Templates Ghazala Amin.
Earned Value Management Presented By: Steve Krivokopich May , 2006.
Page 1 The Capability Maturity Model (CMM) distinguishes between immature and mature software organizations. Immature software organizations are typically.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
CSPC 464 Fall 2014 Son Nguyen. 1. The Process of Software Architecting, Peter Eeles, Peter Cripss 2. Software Architecture for Developers, Simon Brown.
Project Management Basics
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Project Management Why do projects fail? Technical Reasons
Software Engineering (CSI 321) Software Process: A Generic View 1.
Continual Service Improvement Methods & Techniques.
NDIA - ICPM Program Planning and Scheduling Subcommittee Program Planning and Scheduling Subcommittee (PPSS) Initiative Presented by: Ms Carol Boser and.
NDIA - ICPM Program Planning and Scheduling Subcommittee Program Planning and Scheduling Subcommittee (PPSS) Initiative Presented by: Ms Lil Vayhinger.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
RUP RATIONAL UNIFIED PROCESS Behnam Akbari 06 Oct
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Managing Schedule Slack/Float PMI Scheduling Forum January 6, 2015 January 6, 2015 Presented by: Ric Albani, PMP, PMI-SP, PMI-RMP, MCTS.
GAO’s Cost and Schedule Assessment Guides U.S. Government Accountability Office Applied Research and Methods Cost Engineering Sciences Jason T Lee, Assistant.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
Creating a Work Breakdown Structure with Microsoft Project.
JMFIP Financial Management Conference
PKB’s IMS “Cheat Sheet” for DoD Program Managers
Chapter 11 Project Management.
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Cost Estimating Investment Planning and Project Management
Project life span.
Establishing and Managing a Schedule Baseline
Software Engineering (CSI 321)
Importance of Project Schedules
Time Scheduling and Project management
Presentation transcript:

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Improving Air Force Scheduling Processes and Tools – A Demonstration Fred Meyer, AF PM&AE Luis Contreras, AzTech Inc 04 March 2010

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Today’s Discussion The importance of a good schedule Scheduling challenges Collaborating with Industry Generally Accepted Scheduling Principles (GASP) Using GASP as an assessment tool Schedule assessment tool demonstration 2

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 3 OSD Voice Dr. Ashton Carter, USD for Acquisition, Technology & Logistics “Time is money…We need more programs with a philosophy of meeting a strict schedule.” “I am looking for earlier ways of assessing programs than waiting for the Nunn-McCurdy bell to ring.” “My approach to troubled programs is to go at them one-by-one, solve the underlying problems, get them on track. And if they cannot be gotten on track, face the music. If a program is not performing, we need the discipline to end it.”

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 4 The Importance of a Good Schedule Schedules are Forward-looking management tools with predictive capabilities Critical path(s) are defined Dates are forecast Float/slack provides a management metric The foundation for all baseline planning and integration Resources are tied to schedules to form cost baselines Subsystem data is captured (MRP, labor, material) Subcontractor efforts are integrated

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 5 Scheduling Challenges Contractor schedules are not properly constructed or maintained No standardization Cannot be used to effectively manage Used as a report, not a management tool PMs do not understand how to assess contractor schedules Lack of scheduling expertise across DoD Little practical training available Analytical tools are not used or understood Fixing the problems requires Commitment at all levels to reinvigorate scheduling capability Using schedule data to inform management decisions A standardized Industry/DoD approach to scheduling Tailored training for all levels of acquisition

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 6 Meeting the Challenge -- Collaboration with Industry The National Defense Industrial Association-Industrial Committee for Program management (NDIA-ICPM) was established as a collaborative Industry and Government forum whose purpose is to address common program related issues. NDIA-ICPM membership includes senior leadership from Industry, OSD and the Services NDIA-ICPM recognized the need for consistency and standardized planning practices and established the Program Planning and Scheduling Subcommittee (PPSS)

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 7 Revitalizing Air Force Scheduling Capabilities In parallel with PPSS initiatives, PM&AE is developing a comprehensive IMS assessment instruction and related training Provides a consistent approach to schedule assessment Ensures Program Managers and their teams understand the health of their schedules and their program's critical path Results in more robust program schedules that are continually improved over time AF PM&AE has begun to use the GASP as a framework for developing quick-look schedule assessments Concise Easily understood Provides pros, cons and suggested improvements Assigns actions for program office and industry to work collaboratively

I n t e g r i t y - S e r v i c e - E x c e l l e n c e A valid schedule provides reasonable & credible information based on realistic logic, durations, & dates. 1. Complete: The schedule captures the entire discrete, authorized project effort from start through completion. 2. Traceable: The schedule logic is horizontally & vertically integrated with cross-references to key documents & tools. 3. Transparent: The schedule provides visibility to assure it is complete, traceable, has documented assumptions, & provides full disclosure of program status & forecast. 4. Statused: The schedule has accurate progress through the status date. 5. Predictive: The schedule provides meaningful critical paths & accurate forecasts for remaining work through program completion. An effective schedule is useful, helps align time-phased resources, & is built & maintained using a controlled process. 6. Usable: The schedule is an indispensable tool for timely & effective management decisions & actions. 7. Resourced: The schedule aligns with actual & projected resource availability. 8. Controlled: The schedule is built, baselined, & maintained using a stable, repeatable, & documented process. GASP Essential Element Statements

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Complete Schedules represent authorized discrete effort for the entire contract, with essential subcontracted or other external work or milestones integrated yet distinguishable from internal work. Traceable Schedules reflect realistic & meaningful network logic that horizontally & vertically integrates the likely sequence for program execution. Schedules are coded to relate tasks or milestones to source or dependent documents, tools, & responsible organizations. Transparent Schedules provide full disclosure of program status & forecast & include documented ground rules, assumptions, & methods for building & maintaining schedules. Documentation includes steps for analyzing the critical paths, incorporating risks & opportunities, & generating schedule health & performance metrics. Statused Schedules reflect consistent & regular updates of completed work, interim progress, achievable remaining durations relative to the status date, & accurately maintained logic relationships. Predictive Schedules accurately forecast the likely completion dates & impacts to the program baseline plan through valid network logic & achievable task durations from the status date through program completion. GASP Narratives for Valid Schedules

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Usable Schedules produce meaningful metrics for timely and effective communication and tracking and improving performance, mitigating issues and risks, and capturing opportunities. Schedules are robust and functional to help stakeholders manage different levels, groupings, or areas as needed. Schedules are developed and maintained at a size, level, and complexity such that they are timely and enable effective decision-making. Resourced Resources align with the schedule baseline & forecast to enable stakeholders to view & assess the time-phased labor & other costs required to achieve project baseline & forecast targets. Each program is unique & uses varying techniques to load, baseline, & maintain the time-phased resources at levels that are practical & produce meaningful & accurate projections. When resource-loaded schedules are used they enable flexible updates to resource requirements as conditions change. Whether or not resource-loaded schedules are used, cost & schedule data are integrated for internal & external reporting. Controlled Schedules are baselined & maintained using a rigorous, stable, & repeatable process. Schedule additions, deletions, & updates conform to this process & result in valid & accurate results for sound schedule configuration control & maintenance. GASP Narratives for Effective Schedules

I n t e g r i t y - S e r v i c e - E x c e l l e n c e GASP / 14 Point Assessment Comparison 11

I n t e g r i t y - S e r v i c e - E x c e l l e n c e GASP Quick-Look Schedule Assessment

I n t e g r i t y - S e r v i c e - E x c e l l e n c e GASP Quick-Look Schedule Assessment

I n t e g r i t y - S e r v i c e - E x c e l l e n c e BACKUP

I n t e g r i t y - S e r v i c e - E x c e l l e n c e GASP Quick-Look Schedule Assessment

I n t e g r i t y - S e r v i c e - E x c e l l e n c e GASP Quick-Look Schedule Assessment

I n t e g r i t y - S e r v i c e - E x c e l l e n c e GASP Quick-Look Schedule Assessment

I n t e g r i t y - S e r v i c e - E x c e l l e n c e GASP Quick-Look Schedule Assessment

I n t e g r i t y - S e r v i c e - E x c e l l e n c e GASP Quick-Look Schedule Assessment

I n t e g r i t y - S e r v i c e - E x c e l l e n c e GASP Quick-Look Schedule Assessment