DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Control and Monitoring Summary of DAQ WS III o General Architecture o RF System C&M o D0 EPICS extensions.

Slides:



Advertisements
Similar presentations
MICE CM January 2009Jean-Sébastien GraulichSlide 1 DAQ and CAM Summary o Organization o Control and Monitoring o Detector DAQ o Online Monitoring o Front-End.
Advertisements

1 Personnel Protection System (PPS) – Definition Interlock system, to protect personnel from Ionising Radiation (and other hazards) –(Note: does not include.
Daresbury Aug 2005Jean-Sébastien Graulich Detector DAQ Overview and Needs Jean-Sebastien Graulich, Univ. Genève o Introduction o Detector Systems Overview.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Wrap Up o Control and Monitoring o DDAQ o Interface between DDAQ and MCM o Infrastructure Jean-Sebastien.
Workshop Goals MICE Controls and Monitoring Workshop September 25, 2006 A. Bross.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 DDAQ Hardware Architecture o General Architecture o Tracker Baseline o TOF Baseline & Options o EmCal Baseline.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Control and Monitoring of PID Detectors o Disclaimer o Remarks on Control and Monitoring: 1) Missions.
Paul drumm daq&c-ws august/september Cooling Channel.
Pete Owens MICE Controls & Monitoring Workshop 25th September 2006 MICE Control and Monitoring: General Architecture Subsystem Integration User Interface.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
1 Online data quality and monitoring M. Ellis Daresbury DAQ Meeting 31 st August 2005.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
Tracker Controls MICE Controls and Monitoring Workshop September 25, 2005 A. Bross.
2005/10/22 MICE CM at RAL, Tracker Parallel, Makoto Yoshida 1 KEK test beam - introduction - M. Yoshida MICE CM tracker parallel 2005/10/ /10/22.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DDAQ Pending Issues o Detector FEE o Software framework o Trigger o Data Storage Jean-Sebastien Graulich,
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Control, Monitoring and DAQ Makoto Yoshida Osaka Univ. MICE Frascati June 28, 2005.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Report on FEE for PID o Reminder o TOF o EMCAL o Summary Jean-Sebastien Graulich, Geneva.
Controls Review  Want to record a full configuration of the experiment at every possible “event”, including controls data.  Event trigger = accelerator.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Interface between Control & Monitoring and DDAQ o Introduction o Some background on DATE o Control Interface.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
RF controls for MICE Andrew Moss Sept 06. What we need A flexible easy to use solution to control the amplitude, phase and timing of the MICE RF amplifiers.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Online Summary o Detector DAQ o Controls And Monitoring o Online Data Base o Bottom Lines Jean-Sebastien.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
CM26 March 2010Jean-Sebastien GraulichSlide 1 Online Summary o The heplnw17 case o DAQ o CAM o Online Reconstruction o Data Base o Data Storage Jean-Sebastien.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Control and Monitoring System / EPICS Pete Owens Daresbury Laboratory.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
MICE VC June 2009Jean-Sébastien GraulichSlide 1 Feed back from the DAQ review o Facts o Detector DAQ o Important Comments o Bottom line Jean-Sebastien.
Control & Monitoring System Update Contributors: Brian Martlew - Daresbury Laboratory - STFC James Leaver - Imperial College Pierrick Hanlet - Fermilab.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring.
Adrian Oates Daresbury Laboratory ALICE Control System July 08.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Mice CM Oct 2005Jean-Sébastien GraulichSlide 1 MICE Collaboration Meeting Oct05 Review of DAQ Workshop and DAQ Issues Jean-Sebastien Graulich, Univ. Genève.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
Controls & Monitoring Overview J. Leaver 03/06/2009.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
1 Virtual Accelerator plan and status at RCS Hiroshima University, Graduate School of Science Experimental Quark Physics Lab ( & JAEA Accelerator Development.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
RF Review CM37 Andrew Moss. Amplifier results at Daresbury 2MW at 35kV, good efficiency and gain.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
ONCS Subsystem Status Chris Witzig (BNL), Stephen Pate (NMSU) DC Meeting PHENIX Collaboration Week 22-June-1998 Chain Test Software Subsystem Support Tests.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Operations Machine Simulator.
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
Online – Data Storage and Processing
Controls & Monitoring in MICE
Hardware integration and interfaces
Presentation transcript:

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Control and Monitoring Summary of DAQ WS III o General Architecture o RF System C&M o D0 EPICS extensions for MICE o Tracker and PID Detectors C&M o Safety o Outlook Jean-Sebastien Graulich, Geneva

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 2 Preliminary remark  We have also discussed Data Storage (M. Ellis) Preparation for Data Taking (P. Kyberd) But I will focus on C&M issues

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 3 Control and Monitoring  Peter Owens presented General Architecture, Subsystem Integration and User Interface  Subsystem integration: Recommendations Use File System convention Use standard hardware (Hytec 9010 IOC) Use Simulation Name Convention

DDDD-TT-CCCCC-NN:SSS:RRRRRR Max 3 char Max 5 char Max 3 digits Max 10 char Agreed

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 5  Actions: Prepare the list of Technical Area codes (Equipment codes are under the responsibility of the subsystem developer). Names should be approved by Peter Owens Set up a DAQ web site to centralize the information web master: Vassil Verguilov

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 6 RF Control System  Andy Moss introduced the Direct Digital Synthesizers as very flexible way to produce RF Can be programmed via serial ports Exists in 4 channel version: Allows independent control of 4 RF channels synchronised to the same clock, with excellent isolation between channels Can be interfaced with Epics  Digital timing system with 5 outputs Can EPICS provide the timing signal? ->Triggered Discussion on RF phase measurement RF amplitude measurement

Basic Layout of LLRF system

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 8 RF  Decision RF phase: A logic pulse with precise constant phase w.r.t the RF should be sent to the TOF TDC We’ll use the locking signal and not zero crossing of the probed RF field A signal should be sent to the DDAQ when the cavities are locked  Action Investigate the possibility of using ~GHz waveform digitizer (oscilloscope) to measure the RF amplitude Contact MTA people for tests

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 9  Fritz Bartlett presented D0 EPICS Extensions for MICE Significant Event System Replaces the standard Alarm handler Fritz is willing to make SES “D0 independent” COMICS (Experiment Configuration System) GUI  The possibility to use SES will be seriously considered  The need for an Experiment Configuration System is recognized

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 10 Subnets  Fritz strongly recommended to set up a subnet for the C&M (IOC are not protected)  A separate subnet is also needed for DDAQ

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 11 Tracker C&M  Alan Bross has shown that  Alan Bross has shown that the basic infrastructure for the MICE tracker C&M can be copied from D0 GUI Python Code EPICS implementation  To do Customization to MICE (considerable weight loss) Develop a stand-alone VLPC cryostat C&M application

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 12 PID C&M  Essentially HV power supply (~350 channels)  Naming convention TOF EMC CKV Station 01, 02, 03 Part # (01 for KL, 02 for SW) Part # (01 or 02) MICE-DDD-HVPS-##:###:HVSP Channel Example: For High Voltage Power Supply For High Voltage Set Point

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 13 TOF0 TOF1 TOF2 USCDSC Tracker 1 Tracker 2 EMCAL  The Ideal GUI  Each Detector has a color:  Each Detector has a color: Green= FULL_READY Yellow= OUT_OF_RANGE_L2 Red= OUT_OF_RANGE_L3 or TRIPPED or NOT_READY White= INACTIVE  Each Detector is clickable, a panel pops up with the status of each individual channel  The same panel can be used to edit the settings, providing a password

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 14 Database  Discussion initiated Some Database is needed Detector Configuration Calibration and Geometry DATE is using MySQL C&M archive should allow random access  Action ORACLE cost estimation – Paul Kyberd Find other options – All

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 15 Safety  John Alexander reported on Personal Protection System (PPS) at Daresbury and RAL

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 16

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 17 MICE PPS  Search Areas MICE Decay Solenoid Area MICE Hall  Controlled equipments ISIS Synchrotron Beam (to enable: Decay Solenoid Area vacated) via ISIS PPS (hooks already included) MICE RF System (to enable: MICE Hall vacated) switch off RF drive to IOTs switch off HT to IOTs Superconducting Magnets – sequence to enable 1) MICE Hall searched (but ‘Limited Access’ permitted) 2) Hall inspection for loose magnetic material – not PS function 3) Insert and turn ‘Magnet Enable’ key Dropping search does not disable magnet PSU, – turn off key does Not comprehensive list yet

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide MICE Hall Decay Solenoid Area (shielding: schematical representation only) 4

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 19 Outlook  Preliminaries are complete Agreement on General Architecture Naming Convention (and colour code) Information Distribution (Web site)  The group includes individuals with high level of expertise ?Available for MICE  Connection with subsystems is too loose My personal feeling is that we need someone who would take that in charge