P.O. Box 463 6200 AL Maastricht The Netherlands www.riks.nl RIKSDeSurvey AGM2 - Vasto, Italy, 4-7 April 2006 DeSurvey Module 1.8 ‘Integration towards a.

Slides:



Advertisements
Similar presentations
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
Advertisements

New market instruments for RES-E to meet the 20/20/20 targets Sophie Dourlens-Quaranta, Technofi (Market4RES WP4 leader) Market4RES public kick-off Brussels,
1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) iCargo 1st Review Meeting Brussels 5/12/12 Technical.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
C2-SENSE WP2 Bojan Božić, Gerald Schimak, Refiz Duro C2-SENSE WP2 Meeting Paris
WP 3 - Technical design & Implementation of the Integrated system Wouter Jan Smeulers LogicaCMG The Hague Roland Ettema LogicaCMG Maastricht Louis Maessen.
D ET N ORSKE V ERITAS DNV - 01/06/ Project Progress between review meeting #2 and #3 Peik Jenssen Copenhagen 25 May 2000.
Work Package 13 Knowledge Management, Exploitation and Dissemination Dr. Jay Pearlman, IEEE, WP co-lead Dr. Christian Kittl, Evolaris, WP co-lead January.
Requirements Engineering Processes
Understand European Energy Supply Security Management Co-ordinators UNDER way towards STANDard indicators for continuous VET A short summary.
The Open University's Institute of Educational Technology Improving the accessibility of virtual learning environments using the EU4ALL framework Chris.
1 Mouse Cases M.Ellis/Y.Torun Wednesday 31 st March 2004.
ESSnet on SDMX phase II Dario Camol
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
Work Package 6: Performance Specification Ian McCrea.
The Astro-Wise Pipeline Conceptual Design Review Roeland Rengelink Requirements Development Framework Prototype.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems WP8: Use case 1: Quality Analysis for Satellite Missions.
CSI315 Web Applications and Technology Overview of Systems Development (342)
This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF. Work Package 4 & Methodology for Open Living Lab O4.1.7 Budapest,
WP10 Dissemination Oleg Liber, U. Bolton UK Objectives 1.To disseminate, on an on-going basis, the RTD outcomes: specifications and standards, architectures,
المحاضرة الثالثة. Software Requirements Topics covered Functional and non-functional requirements User requirements System requirements Interface specification.
SIXTH FRAMEWORK PROGRAMME FP INCO-MPC-1 MEditerranean Development of Innovative Technologies for integrAted waTer managEment.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
GENIUS. WP600 Support Activities Participants: University of Barcelona: 6PM CESCA (Center for Scientific and Academic Services of Catalonia): 24PM University.
GRID IIII D UK Particle Physics GridPP Collaboration meeting - R.P.Middleton (RAL/PPD) 23-25th May Grid Monitoring Services Robin Middleton RAL/PPD24-May-01.
02/11/98ISO-3D Kick-Off Meeting Esprit Project N° Interpretation of Symbolic Objects in 3D representation (ISO-3D) (ISO-3D) Kick-Off Meeting.
Partner’s Roles Valuable partners, I want to remind our roles in project. And I want to get feedback from you about this. These are our roles in project,
Security Area in GridPP2 4 Mar 2004 Security Area in GridPP2 “Proforma-2 posts” overview Deliverables – Local Access – Local Usage.
1 ESSnet workshop Eurostat Vision infrastructure project : SICON - Secured Infrastructure or CONfidential data access and sharing Jean-Marc Museux Eurostat.
> 1 ENGINE WP2 Special Meetings, Orléans, France, 13&15/02/2006 ENGINE ENhanced Geothermal Innovative Network for Europe WP2 Special Meetings Information.
MODA-TEL An IST project on Model Driven Architectures for Telecommunications System Development and Operation.
ANDROME – WP3 - Applications definition and development | Enabling Community Communications-Platforms and Applications | WP3 : Applications.
WP6: Coastal Transects Ratana Chuenpagdee, Coastal Development Centre, Thailand Kungwan Juntarashote, Coastal Development Centre, Thailand Robert Kay,
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
EVA Workshop, 26 March 2003, Florence, Italy1 COINE Cultural Objects In Networked Environments Anthi Baliou University of Macedonia,Library Thessaloniki,
Xplorah: support for integrated spatial planning in Puerto Rico Xplorah is developed for the Graduate School for Planning of the University of Puerto Rico.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
EIPA CAF Resource Centre CAF CAF activities – state of affairs Patrick Staes & Ann Stoffels EIPA CAF Resource Centre Berlin, 8-9 February 2007.
CARPE DIEM 6 th meeting – Helsinki Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches.
Project Database Handler The Project Database Handler dbCCP4i is a brokering application that mediates interactions between the project database and an.
WP2: Domain Model + WP3 TENCC Rob Koper & Hubert Vogten TENCompetence Project Meeting 3-4 July 2006 Kerkrade, The Netherlands.
Kick of WP3 Steps towards building Oxford, first project meeting :30 am – 11:15 am.
NOV-3261-SL-3699 v.1.0 The DeSurvey website Véronique BRUNIQUEL First Annual Meeting – April 4-7, 2006 Vasto, Italy.
> 1 The information system of the ENGINE co-ordination action, Launching conference, Orléans, France, 15/02/2006 The information system of the ENGINE co-ordination.
SLHC-PP WP2: Coordination for the SLHC accelerator implementation, agenda for the kick-off meeting 1. Introduction to WP2(20’, G. de Rijk) 2. Work plan:
Module 1.9; WP Innovation-related activities Leaders: Gérard Bégni, Yves M. Tourre and Hélène Gauthier-Bourret (MEDIAS- France) Direct Partners:
ITSRM Content Management Infrastructure Coordination David Foster IT June 2010.
TCS-ICS interactions Kuvvet Atakan 1 and the WP6 and WP7 Teams 1 University of Bergen / Department of Earth Science.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
PI2134 Software Engineering IT Telkom.  Layered technology  Software Process  Generic Process (by Pressman)  Fundamental activities (by Sommerville)
44222: Information Systems Development
11-May-01D.P.Kelsey, Security Update1 GRID Security Update David Kelsey CLRC/RAL, UK
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
WP5 – Infrastructure Operations Test and Production Infrastructures StratusLab kick-off meeting June 2010, Orsay, France GRNET.
ΑΝΝΕΧ 10 by EK. Rail Operators‘ Group (1) 1.Background F-Man Cargo operators: FS, CP, SZ. Their responsibilities: - to define their needs for a F-Man.
Brussels, January 16th, Overview and status of the project.
Frank Schipplick Work Package Coordinator WP1 - eSignatures.
Theme (iv): Standards and international collaboration
Bob Jones EGEE Technical Director
EGEE Middleware Activities Overview
Work Package 2 TECHNOLOGICAL HARMONISATION Reporting period
WP5: Dissemination, studies, web portal and tools
WG-I #16 Meeting SESAR Security Tasks
OBJECT-ORIENTED APPROACH TO OFFICIAL STATISTICS
BioMedBridges – Work Packages 2 & 12
X-DIS/XBRL Phase 2 Kick-Off
CORA ESSNet COmmon Reference Architecture starting ...
The basics ESSnet on SDMX prepared in 2008/2009
Members: Keshava Shiva Sanjeeve Kareena
Towards a new tool for seasonal adjustments: Demetra+
Presentation transcript:

P.O. Box AL Maastricht The Netherlands RIKSDeSurvey AGM2 - Vasto, Italy, 4-7 April 2006 DeSurvey Module 1.8 ‘Integration towards a prototype DeSurvey Surveillance System’ Bernhard Hahn

RIKS DeSurvey AGM2 - Vasto, Italy, 4-7 April Module 1.8: main activities  Interfacing with policy and user needs (Lead: Cranfield University, UK, Brian McIntosh)  Desertification policy support  DeSurvey user interface design  Implementation of the DeSurvey Surveillance System (Lead: RIKS, the Netherlands, Bernhard Hahn)  Develop Integrated Assessment Model Desurvey Surveillance System  Integrate knowledge, models, data and tools developed in the WPs into Desurvey Surveillance System  Validation of the DeSurvey Surveillance System (Lead: IRD, France, Jean-Marc d’Herbes)  Application and validation of the system in # of sites.  This WP does not initiate formally within the first 18 months of the project.

RIKS DeSurvey AGM2 - Vasto, Italy, 4-7 April WP 1.8 Deliverables (18 month plan) D : Review of desertification policy objectives and issues, how they relate to policy instruments and the way in which scientific knowledge has been used to design and implement instruments (delivered) D : Method for eliciting information on the relationships between policy objectives, organisational dimensions, policy instruments and the use of scientific knowledge (due month 18) D : Analysis of the functional, technical and end-use aspects of the models and tools being developed within DeSurvey (due month 10, 2 months late) D : Functional design for the DeSurvey Surveillance System (due month 18)

RIKS DeSurvey AGM2 - Vasto, Italy, 4-7 April WP Task 1 (18 month plan) Task 1: In collaboration with WP 1.8.1, the detailed analysis of the functional, technical and end-use aspects of the models, tools and data available from the other Modules of the project. Status: Technical aspects on schedule. Most of the activities so far concentrated on technical and functional aspects of model integration. Concern: Clear user requirements for the DeSurvey Surveillance System not yet elicited. Probably not available before moth 18. The functional system design to be delivered by WP in month 18 will therefore be driven by available models and data, rather than user requirements.

RIKS DeSurvey AGM2 - Vasto, Italy, 4-7 April WP Task 2 (18 month plan) clear set of tasks which the user will be able to carry out with the system Task 2: Functional requirements analysis and development of a Functional design for the DeSurvey Surveillance System based on the above analysis as well as the end-use and end- user analyses carried out in WP This should result in a clear set of tasks which the user will be able to carry out with the system (and functionality which he can invoke from the menus of the system); Status: Coordination meeting with Module 1.8. and Module 1.9 in Maastricht -> Preparation of user requirements workshop. Initial technical requirements analysis

RIKS DeSurvey AGM2 - Vasto, Italy, 4-7 April WP Task 3 (18 month plan) Task 3: Development of an Open Architecture and Technical design for the DeSurvey Surveillance System enabling a modular development as well as its straightforward upgrading and extension during and beyond the lifetime of the project. Status: On schedule. Technical analysis and test implementations of several integration technologies: Web Services (gSOAP), OpenMI and open source software tools (R, Python) to investigate their potential as a backbone for integration of the DeSurvey Surveillance System.

P.O. Box AL Maastricht The Netherlands RIKSDeSurvey AGM2 - Vasto, Italy, 4-7 April 2006 Summary of work carried out in WP presented by: Esther Diez-Cebollero Cranfield University (UK)