Midterm Review 28-29/05/2015 Silvia ZORZETTI ESR4.1, WP4 1.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Silvia Zorzetti. PACMAN CLICScientific ProjectThe Team PACMAN (Particle Accelerator Components Metrology and Alignment to the Nanometer Scale) Ph.D. training.
1 KEK Cavity BPM Hitoshi Hayano Development of Cavity BPM for Q-magnet attachment, Aiming; compact design, 0.2µm resolution, BPM center error (between.
SCU Measurements at LBNL
Measuring the magnetic axis of quadrupoles by a stretched wire Domenico Caiazza CLIC Workshop 2015.
Accelerator and Beam Delivery The LC-ABD (Linear Collider: Accelerator and Beam Delivery) consortium is a group of UK institutes aiming to develop new.
A. Bay Beijing October Accelerators We want to study submicroscopic structure of particles. Spatial resolution of a probe ~de Broglie wavelength.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
Bob Lill LCLS FAC June 16-18, 2008 RF BPM Status and Production Test Results.
PEDM Review 12/7/091 Beam Position Monitors William Morse.
CLIC-PACMAN: BPM-to-Quadrupole Alignment based on EM Field Measurements Manfred Wendt CERN BE-BI-QP.
PACMAN Workshop OUTLINE Introduction ESR 3.1 Challenges - Stability budget and Precision Mechanical Design - Precision Assembly of MBQ and BPM - System.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
Midterm Review 28-29/05/2015 Iordan Doytchinov ESR3.1, WP3 1.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Experience on design, prototyping and testing of cavity BPM for the European-XFEL > Motivation > Introduction > Principle of CBPMs > Mechanical properties.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Status of the Fermilab Cold BPM R&D Manfred Wendt Fermilab 10/1/20091LCWA09 Main Linac WG.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
The Cavity Beam Position Monitor (BPM) Massimo Dal Forno Paolo Craievich, Raffaele De Monte, Thomas Borden, Andrea Borga, Mauro Predonzani, Mario Ferianis,
Tohoku university Daisuke Okamoto TILC09 1. Motivation 2. Principle 3. Design 4. Expected performance 5. Conclusion contents.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
The beam-based alignment and feedback systems, essential operations of the future colliders, use high resolution Beam Position Monitors (BPM). In the framework.
ABSTRACT The Compact Linear Collider (CLIC) is currently under development at CERN as a potential multi-TeV e + e – collider. The manufacturing and assembly.
Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti.
Status of training program N. Catalán Lasheras
November : PACMAN Kick-off Meeting Introduction to Work Package 3: “Precision mechanics and stabilization” Michele Modena - CERN.
Mid Term Review Meeting, 26 September 2012N. SURNAME1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Welcome to MONALISA A brief introduction. Who we are... David Urner Paul Coe Matthew Warden Armin Reichold Electronics support from CEG Central Electronics.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
WP5. Training N. Catalán Lasheras. Outline Introduction Existing vs. new training General training for all ESRs Training by work package Secondments in.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
Beam Test status and Plans of the ILC Main LINAC BPM
1 Cold L-Band Cavity BPM: Design Status July 2006 Gennady Romanov Linda Valerio Manfred Wendt Fermilab July 21, 2006.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
CARE Steering Committee, Paris, 5 septembre 2005O. Napoly, CEA/Saclay 1 SRF Work Packages 2 Improved Standard Cavity Fabrication 2.1 Reliability analysis.
SUM ESR ESR ESR ESR ESR ESR ESR ESR (TBC)
Introduction to the PACMAN project A study on Particle Accelerator Components’ Metrology and Alignment to the Nanometre scale OUTLINE Scientific goals.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Development of a High Resolution Cavity BPM for the CLIC Main Beam
Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
PACMAN : technical objectives Hélène Mainaud Durand.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
H. MAINAUD DURAND PACMAN training network A study on Particle Accelerator Components’ Metrology and Alignment to the Nanometre scale OUTLINE Scientific.
Sub-Task HOM-BPM HOM based Beam Position Monitors – Planned and Extant Measurements N. Baboi, DESY, Hamburg EuCARD WP 10: SRF, Annual Review Meeting.
Pasquale Arpaia, University of Naples Federico II
EUROTeV Diagnostics WP5
PACMAN impact on future module design
Re-entrant BPM R&D for ILC Main Linac
Procurement, Measurement and Installation of 2 Octupoles for ATF
Recent developments on micro-triangulation
CLIC Workshop 2016: Main Beam Cavity BPM
Ddd 4-Slides Challenge Silvia Zorzetti.
WP1 Metrology & Alignment
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
    BEAM POSITION MONITORS USING A RE-ENTRANT CAVITY C. Simon1, S. Chel1, M. Luong1, P. Contrepois1, P. Girardot1, N. Baboi2 and N. Rouvière3.
Beam Position Measurements in TTF Cavities
Breakout Session SC3 – Undulator
Presentation transcript:

Midterm Review 28-29/05/2015 Silvia ZORZETTI ESR4.1, WP4 1

 BSc Degree: Università degli studi di Napoli, Federico II  Main field of study: Electronics engineering  Thesis title: Analysis of the Raw Process Time on Dry Etch equipment for DRAM manufacturing  Internship: Micron Technology (Italy)  MSc Degree: Università di Pisa  Main field of study: Electronics engineering, electronic systems  Thesis title: Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators  Internship: Fermi National Accelerator Laboratory (USA) Background / 2 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015

ESR4.1, WP4 /  Contract starting date: 1 st April 2014  PACMAN subject: Alignment and Resolution of a Beam Position Monitor Operating at Microwave Frequencies in the Nanometer Regime  PhD in: Information Engineering  PhD Institution: Università di Pisa  Secondment: National Instruments Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 CERN SupervisorManfred WENDT Academic supervisorLuca FANUCCI Industry supervisorBotond BARABAS 3

 Title: Alignment and Integration of Beam Devices for Particle Accelerators at Microwave Frequencies in the Sub-Micrometer Regime  Starting date: 01/11/2013  Status: First year passed; Second year review foreseen on December 2015  Credits obtained / Credits required : 22/35 4 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 PhD Thesis / Information Engineering University of Pisa

For future electron/positron linear collider CLIC at CERN, a strong focusing beam is required to produce a high number of particle collisions (luminosity) at high frequency 5 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Project / Main Beam Quadrupole (MBQ)  to focus the beam Beam Position Monitor (BPM)  to detect the beam position Final Objective – INTEGRATION Align the CLIC accelerator components in the sub- um regime on a standalone test bench PACMAN final objective

Beam Position Monitor (BPM) characterization  Electrical center  Study of the resolution 6 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Project / BPM-MBQ Integration  Define the linear zone of the BPM  Hardware and software integration of different systems  Stretched-wire measurements Role in PACMAN

 Test two measurement methods on the BPM Test Bench  Find the best trade off between integration and measurement sensitivity  Find the relative and the absolute position of the electrical center with a sub-micrometric error  Integrate the BPM with the magnet on a standalone test bench  Find the magnetic-electrical centers displacement in the µm-meter regime  Demonstrate the nano-metric resolution of the BPM-MBQ system 7 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 State of the art / BPM Test Bench and Integration

 Resolution to find the BPM Electrical center between 1 and 2 µm  Resolution to find the magnetic center between 10 and 20 µm  The offset between the magnetic and electrical centers was calculated by number of steps of the translation stages, without referencing the position to any external fiducial. 8 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Research gap / At Desy for TTF2 Literature review  The PACMAN BPM resolution is expected to be ~50nm.  This result was achieved by the designer (A. Lunin - Fermilab) only by simulations BPM Design at Fermilab D. Noelle e t Al. “BPMs with Precise Alignment for TTF2”, AIP Conf.Proc. 732 (2004) A. Lunin et Al., “Design of a Submicron Resolution Cavity BPM for the CLIC Main LINAC”, TD-Note – TD

 The PACMAN BPM operates at 15GHz, such high frequency range requires more accurate RF electronics and precision mechanics  At DESY: strip line BPM at 325MHz  For the PACMAN Project we want to achieve a sub-micrometric resolution and for the BPM electrical center and for the quadrupole magnetic  At DESY: ~um for the BPM and ~10um for the magnet  The offset between the two center will be measured with the aid of a Coordinate Measuring Machine (CMM) available at CERN, referencing the wire position to an external fiducial  At DESY the offset was measured by means of the count of the stepper motor, without any external fiducial  The nano-metric resolution of the RF-BPM will be proved by a dedicated nano positioning system (in collaboration with D. Tshilumba ESR 3.3)  BPM resolution anticipated as ~50nm 9 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Research gap / Challenge

 Build a dedicated BPM Test Bench  Find the best measurement method  Perform RF accurate measurements and translation stages  Perform stretched-wire measurements on the Quad-BPM test bench  Have a micrometric displacement between the BPM electrical center and the quadrupole magnetic center  Prove the resolution of the BPM in the nanometer regime 10 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Project / Objectives

 Resonant Frequencies  Quality Factor  Impact of the wire  Find the best measurement method 11 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Project / Simulations on the BPM cavity Simulations Method followed

12 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Project / Identification of the measurement method Signal excitation A 15 GHz CW signal is fed on a conductive stretched wire, causing an excitation in a similar way as the beam. By small transverse movements of the BPM with respect to the wire it is possible to scan the cavity and find the electrical center. Perturbation analysis The cavity BPM is excited via one of the lateral waveguide-to-coaxial ports, and the output signal is analyzed on the opposite waveguide. A conductive stretched-wire is used as a perturbation target inside the cavity. Measurement methods Method followed

13 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Project / BPM Test Bench and Measurements BPM test bench design In collaboration with N. Galindo Munoz (ESR 4.2) Signal excitationPerturbation Analysis -Sensibility -Resolution -Repeatability -Linear zone -Electrical center Test Bench Method followed

14 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Project / Integration The BPM needs to be integrated with the magnet Linear Zone Electrical Center Measurement on the Quad-BPM system Electrical and Magnetic centers displacement Compact electronic interface including Vibrating and temperature sensors Translation stages controller Signal generation and Acquisition Integration Method followed In collaboration with the other ESRs: ESRs 1.1, 1.2, 1.3: Metrology ESR 2.2: Magnetic Measurements ESR 3.1: Integration ESR 3.2: Seismic sensors ESR 3.3: Nanoposition system ESR 4.1: BPM Measurements

Project / 15 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 BPM Test Bench Familiarization and Specifications Jul.14 Drawings and commercial components Oct.14 Manufacturing and commissioning Feb. 15 Measurements and preliminary results Apr.15 BPM and MBQ Integration Measurement method identification for the integration Detailed measurements exploring other methods Dec.15 Apr.15 Measurements on the BPM-Quad Test Bench May.16 Study of the BPM resolution Identification of the method Nov.15 Study accomplished Jul.16 Requirements and Specifications Jun.15 Drawings and commercial parts Sep.15 Task Description

BPM resonant cavity 16 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Project / Results Dipole Mode at 15GHz When the dipole mode is excited (beam off-centered), for both the polarizations the respective set of waveguides transfers the signal to the coaxial output ports. When the beam is off-center the signal picked up from the later waveguides is proportional to the distance from the center Quasi – linear zone ~±300nm Simulations

PROS: Higher sensitivity around the electrical center. CONS: The coaxial line, formed by wire and beam pipe, needs to be terminated, which makes the integration with the quadrupole magnet more difficult. 17 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Project / Results Methods comparison Signal Excitation Measurement methods Perturbation Analysis PROS: The integration with the magnet will be easier, and electrical and magnetic center could be measured using a setup without RF impedance. matching CONS: The sensitivity is lower around the electrical center, the measure may be less accurate

The method chosen for the integration is the Perturbation Analysis, since it is the best fit for the integrate bench 18 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Project /  Measurements have been performed with an Agilent Network analyzer.  Future measurements with a system built with NI products to perform automatic measurements and control the hexapod Test Bench assembled Results Natalia Galindo Munoz Alain Paul Gilles Demougeot Nicolas Sebastien Chritin

The Hexapod has been validated in order to prove the micrometric resolution and to test the measurement error and the repeatability with the help of the Coordinate Measuring Machine (CMM) at CERN 19 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Project / Hexapod Validation Results Specifications: Minimum Incremental Motion (X; Y; Z)[μm]= 0.5,0.5,0.25 Uni-directional Repeatability (X;Y; Z)[μm]= 0.5,0.5,0.25 Bi-directional Repeatability (X; Y; Z)[μm]= 4,4,2 Centered Load Capacity [Kg]= 20 Results: Uni-directional Repeatability (Z)[μm]= 0.25 Bi-directional Repeatability (Z)[μm]= 1.5 Centered Load Capacity [Kg]= 5 Step size: 5μm on the z-axis With N. Galindo Munoz and D. Glaude

20 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Project / Step size 500µm Simulation E-field pattern 2D Measurements Results E-field proportional distribution 1D Electrical Center

21 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Project / Step size 20µm Simulation E-field pattern 2D E-field proportional distribution 1D Measurements Results

22 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Training /  CERN  CST Studio at CERN  LabVIEW Structures at CERN  CAS, Introduction to Accelerator Physics, organized by CERN  PACMAN Network  CST Studio on specific topics at CERN  Metrology training at CERN  RF Measurements at University of Rome, La Sapienza  University of Pisa  RF CAD at University of Pisa  CAD for industrial parts at University of Pisa

23 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Training /  Current measurements have been performed with an Agilent Network Analyzer and storing point by point the measurements  At National Instruments (NI) in Debrecen (HU), in collaboration with Natalia Galindo Munoz (ESR 4.2) and Botond Barabas we are working to automate the measurements process  Hexapod Control  Data Analysis and Generation  This system can be used also for the integrated design Secondment 3-month NI Secondment  Measurements and controls using NI products  FPGA Programming (in Budapest from the 10 th to the 13 th of June)

Communication training for guides at CERN Making presentation Team Building 24 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Training / Transferable skills

PACMAN workshop, IMEKO 2014, NI week, IBIC15, Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Outreach & Disseminatio n/ Conferences & workshop Outreach International Journals  IOP Journal Measurement Science and Technology “Design of the 15GHz BPM Test Bench for the CLIC Test Facility to perform precise stretched-wire RF measurements“, S. Zorzetti, L. Fanucci, N. Galindo Munoz, M. Wendt Under 2 nd review  CERN Open Days  Researcher’s night  Interview for the “Debrecen NI” (local journal)

26 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Network Opportunities/  PACMAN workshop  Industries and academics  Secondment at NI  NI week in Austin  Conferences  Imeko14, IBIC15  Cern Accelerator Schools (CAS)

“The unique multi-disciplinary PACMAN network, which includes the University of Pisa, CERN and National Instruments, gives a special opportunity to study across disciplines on a variety of topics, carrying on a challenging technical project, and merging the academic and the industrial practice. At the end of this experience I will have for sure improved my technical and my social and human skills, and without doubts this experience will represent an excellent springboard for my future career.” 27 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Impact/

Midterm Review 28-29/05/2015 Thank you for your attention 28

BPM resonant cavity 29 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Project / Results Monopole Mode at 11GHz When the monopole mode is excited, there is no signal picked-up from the waveguides. Dipole Mode at 15GHz When the dipole mode is excited (beam off-centered), for both the polarizations the respective set of waveguides transfers the signal to the coaxial output ports.

A 15 GHz CW signal is fed on a conductive stretched wire, causing an excitation of the TM110 dipole mode of the cavity BPM, in a similar way as the beam. By small transverse movements of the BPM with respect to the wire it is possible to scan the cavity and the signal minimum, i.e. the electrical center. 30 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Project / Results Two Methods – Signal Excitation Quasi – linear zone ~±300nm Measurement method

The cavity BPM is excited via one of the lateral waveguide-to-coaxial ports, and the output signal is analyzed on the opposite waveguide. A conductive stretched-wire is used as a perturbation target inside the cavity. 31 Silvia ZORZETTI, ESR4.1 PACMAN Mid-term review 28-29/05/2015 Project / |S21| is maximum with the wire in the center of the cavity, since in that position there is no E-field. When the wire moves outside the cavity center it drains part of the power. Two Methods – Perturbation Analysis Results Measurement method