MOM Report Victoria Blackmore VC-141 16/06/11 1/7.

Slides:



Advertisements
Similar presentations
MOM Report October 9- Now Linda R. Coney UCR. October 15 th Running Target Target Beamline Magnets Beamline Magnets Detectors? Detectors? Could not turn.
Advertisements

K. Long, 18 April, 2015 Beam-line status — red sky at night?
Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
MOM report 23/9 – 28/9 G.CECCHET. MOM report Hall PPS commissioning Target tests last night MOM laptop.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
MOM’s report from G.CECCHET (abridged). MOM’s report First half of November we had normal operations with some data taking for Marco, Yordan, Maurizio.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
MOM Report. Shield Wall – Gone Before During After 2.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting June 7, 2010.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
Commissioning needs: K.Long. Routine: LN2 bottle: –Needs to be sited in MICE Hall or outside vault so that routine checks of contents can be made.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting May 24, 2010.
MICE - UK Project Progress Roy Preece 30 th April 2013.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.
1 Operations Summary L. Coney – UCR MICE CM34 – Oct 2012.
1 Review of Recent Run L. Coney – UCR MICE CM34 – Oct 2012.
1 Operations Overview L. Coney UC Riverside MICE CM32 – Glasgow – June 2012.
1 MICE Running L. Coney – UCR MPB – 31 Oct Coney - MPB - 31 Oct 2012Outline Current Running Current Running Shift personnel training Shift personnel.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
MICE Controlled Access training C.Macwaters September 2015.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Click to add Text L. CONEY1 MICE Shifter Training June 2015.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
MICE VC 10-Oct-2013 Alain Blondel 1 MICE NEWS VC 162 LOTS OF THINGS HAPPENED! have arrived at RAL: -- EMR (see report today) -- AFC2 see pictures -- SS2.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
MOM Report Paul Hodgson Paul Soler Victoria Blackmore VC-139: 14/04/111/8.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
1 MICE PM Report Summary since CM21 Decay solenoid Infrastructure progress Step One Installation Worries MICE Video Conference, 19 th June, 2008.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
MICE MICO Alain Blondel 23 December MICE Commissioning needs 22 December 08.
1 MICE PM Report General Update –Phase I nearing completion –MICE Power –Actions for Decay solenoid & target –Follow-ups from last VC –Conclusions MICE.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
TPC ALARM HANDLER In addition to the big slow controls alarm handler I usually ran a TPC only alarm handler as a separate process. The TPC alarm handler.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
Coney - CM36 - June Online Overview L. Coney – UCR MICE CM36 – June 2013.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
André Augustinus P2 events & perturbations 07 May 2010 ALICE Technical Coordination Meeting.
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
STATUS OF KLOE F. Bossi KLOE GM, ROMA Nov. 13/14.
MICE Operations Scenario Run 1
Project Manager’s Report + DC/MoM Report
Presentation transcript:

MOM Report Victoria Blackmore VC /06/11 1/7

Hall Update Substation upgrade completed. Power to equipment back on. Water restored to hall Turned on on 07/06/11. Conventional magnets tested – all OK bar D1 maybe (see later). Decay Solenoid cooled down. EMR and TOF arrived on Monday. Lots of busy people in the hall installing detectors!! Control room side sign-in sheet now next to hall entrance. Plus handy hat storage! Weekly work list posted on MLCR door (Andy/Vishal). ISIS now in shutdown period (until June 26 th ). 2/7

Systems Test Systems test carried out on 13/06/11 Question: What is working after the long shutdown and power upgrade? Answer: Ask again later… Long list of problems.. Some are fixed/being fixed now. Tweaks needed to the alarm handler (DS flow rates). Couldn’t turn on CAEN 127 HV remotely. Had to do this in person, would be much better if it could be done from the MLCR. DS power supply blew a capacitor, a bit of smoke and blackened fingers followed during investigation – fixed! Run walkthrough checklist specifies the wrong keys for getting the beamstop keys Not major.. Just confusing. 3/7

Systems Test Problems cont… PPS : LH 2 mezzanine door latch upside-down. RF cage (west) door misaligned – fixed! Grey door next to RF cage needs a padlock (11kV inside!) – fixed. Main door bob requires excessive force to reset – in progress. Inner main (personnel) door can be rattled, dropping hall search condition. Key to inner main door must be aligned correctly, or else you can lock yourself inside the hall during a controlled access! Need a permanent intercom by the personnel door. Good news: Controlled access procedure worked well! 4/7

Systems Test Problems cont… Target: Oscilloscope wouldn’t turn on (lit black screen only). Swapped for another oscilloscope, which did work. Couldn’t get machine trigger, so no dipping since… DAQ trigger kept tripping its power supply (4A crate on a 2A fuse!). Conventional magnets: All OK except (maybe) D1 When ramping to high current (e.g. ~300A for reference run settings) temperature gradient across magnet is much higher than others. Usually expect 1-2C, D1 was around 15-20C. Lowering the current returned this to ‘normal’. Vishal has ordered some temperature sensors that may help diagnose the problem… 5/7

Near Miss! Wearing hard hats and safety boots in the MICE hall is vital. A fluorescent tube fell from the hall ceiling last night onto the DSA area. No-one hurt, no damage done. Lots of shattered glass. Lucky! 6/7

Summary Busy time in the hall right now Fixing ‘bugs’ Installing EMR, TOF1, CKOVa Need to finalise run shifts and gather shifters! 7/7