1 Emerging Issues: Materials and Mechanical Michele G. Evans, Session Chair 2009 RIC.

Slides:



Advertisements
Similar presentations
NRC Consensus Standards Program
Advertisements

1 NRC Status and Plans for License Renewal – A Role for Consensus Standards Allen Hiser, Jr. Robert Gramm Stacie Sakai Division of License Renewal Office.
Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
ASME SMR ROADMAP (STP-NU-072)
FEMA Updates April 10, Welcome and Introductions Andy Mitchell Division Director Technological Hazards Division National Preparedness Directorate.
10 CFR Part 26, Subpart I Managing Fatigue 10 CFR Part 26, Subpart I Managing Fatigue Kamishan O. Martin, Human Factors Engineer Office of Nuclear Reactor.
NRC* Perspective on HDPE Road Maps Eric Focht, Materials Engineer U. S. Nuclear Regulatory Commission Office of Nuclear Regulatory Research Division of.
Albert Coons April 21, 2009 Emergency Preparedness and New Reactor Licensing Process: An Update on Where We Are Now Federal Emergency Management Agency.
1 NRC Regulatory Initiatives National Radiological Emergency Preparedness Conference 2009 April 21, 2009 Bill Dean Deputy Director, Office of Nuclear Security.
Engineering Technology Division
NREP 2009 Emergency Preparedness and the New Reactor Licensing Process: An Update on Where We Are Now Dan Barss Division of Preparedness & Response Office.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
NRC Cyber Security Regulatory Program Development Background ANSI Nuclear Energy Standards Coordination Collaborative (NESCC) Meeting November 3, 2014November.
US NRC Protective Action Recommendation Study National Radiological Emergency Preparedness Conference April 10, 2008 Las Vegas, NV Randy Sullivan, CHP.
NRC PERSPECTIVE ON RELIEF AND SAFETY VALVES Charles G. Hammer Component Performance & Testing Branch Division of Component Integrity Office of Nuclear.
1 10 CFR Part 26 Subpart I Managing Fatigue Kamishan Martin Human Factors Engineering June 23, 2010 HPRCT conference.
1 JOINT NRC/OAS PERMANENT IMPLANT BRACHYTHERAPY WORKING GROUP Michael Fuller, US NRC Cheryl Rogers, OAS.
ASME / NRC Management Meetings Kevin Ennis Director, Nuclear C&S Ryan Crane C&S Project Engineering Manager ASME 2 Park.
RIM ) - REWRITE OF SECTION XI, DIVISION II, USING RISK INFORMED METHODOLOGY - FRANK J. SCHAAF,JR, P.E. ASME CHAIRMAN, SWGRIM CONSULTANT, STERLING REFRIGERATION.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
1 ISTOG Position on Pre-conditioning ISTOG Input on Interpretation and Clarification Of NUREG-1482 Sections 3.5 / 3.6.
Current Air-Operated Valve Regulatory Activities Steven Unikewicz US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation January 2006.
NRC Endorsement of Standards
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
11 Technical Session 3 – Rulemaking Process: NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a Raymond (Ray)
Summary of NRC HDPE Piping Confirmatory Research Activities NESCC HDPE Piping Road Map Workshop April 18, 2013 Washington, D.C. Eric Focht, Materials Engineer.
1 Attributes of a Successful Nuclear Construction Project – A Regulator’s Perspective Victor M. McCree Deputy Regional Administrator for Operations U.S.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Funding.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
RIC 2009 Rulemaking Process: “NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a “A New Approach” Jacob Zimmerman.
1 RIC 2009 Construction Inspection Program Glenn M. Tracy, Director Division of Construction Inspection and Operational Programs March 11, 2009.
RIC 2008 Power Reactor Security Requirements Rule Bonnie Schnetzler Team Leader, Security Rulemaking Team Division of Security Policy Office of Nuclear.
NRC Materials Program Cyber Security Organization of Agreement States Annual Meeting August 2015 Adelaide Giantelli Office of Nuclear Material Safety and.
1 Options to Revise Radiation Protection Regulations SECY Kimyata Morgan Butler, Ph.D. Health Physicist/Project Manager Office of Federal and State.
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
1 Current Issues in Siting Safety Reviews Michelle Hart, Sr. Reactor Engineer Division of Site and Environmental Reviews NRC Regulatory Information Conference.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
1 RIC 2009 Licensing Action Acceptance Review Stephen Sands and Donna Wright Division of Operating Reactor Licensing March 11, 2009.
RIC 2009 Emerging Issues Materials and Mechanical
1 RIC 2009 NFPA 805 Regulatory Infrastructure Development Steven A. Laur, PE Sr. Tech Adv. Risk-Informed Initiatives NRC Office of Nuclear Reactor Regulation.
Power Plant Construction and QA/QC Chapter 2– Guide to ASME Code VIII, Division 1, Pressure Vessels Engineering Technology Division.
Nuclear Standards for Polymeric Piping Aaron Forster, NIST Engineering Laboratory NIST, MS Bureau Drive Gaithersburg, MD (301)
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Kyrgyz Republic.
Jim Hill Nuclear Management Company Nuclear Plant Operation under NRC Reactor Oversight Program.
ASME OM CODE CASES Presented by Jeff Neyhard for Ron Lippy Intro 101???
FundingFunding. Funding Objectives To understand the importance to be given to the preparation of appropriate budget in order to implement and operate.
1 RIC 2009 NRO New Reactor Design Reviews and Engineering Jennifer Dixon-Herrity USNRC/NRO/DE March 11, 2009.
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
1 RIC 2009 Fire Protection: Organizational Readiness for NFPA 805 (Technical Session 5) Alexander Klein, P.E. Chief, Fire Protection Branch Office of Nuclear.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
1 RIC 2009 NUCLEAR SECURITY Garmon West, Chief Security Training and Support Branch Division of Security Operations Office of Nuclear Security and Incident.
Proposed Update of Appendix I to Part 50 RIC 2009 Radiation Protection Proposed Update of Appendix I to Part 50 Jean-Claude Dehmel NRO/DCIP/CHPB March.
RIC 2009 Human Factors DAC/ITAAC Reviews Michael Junge USNRC/NRO/DCIP March 11, 2009.
OVERVIEW OF US LICENSE RENEWAL PROCESS P.T. KUO September 23, 2009.
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
NRC’s Component Design Bases Inspections
Updating the NRC’s Alternative Disposal Request Guidance Document
LLW Forum Meeting October 16, 2017 Alexandria, Virginia
NRC’s LLW Regulatory Program: Update of Emerging Issues
NRC Cyber Security Regulatory Overview
NRC’s Ongoing Rulemaking Activities: Recent Developments and Path Forward April 17, 2018 Spring 2018 Low-Level Waste Forum San Francisco, CA Maria Arribas-Colon,
Adding Nuclear Power to the Grid
Thomas Koshy, On Behalf of Brian Thomas, Director
Anna Bradford, Deputy Director Division of New Reactor Licensing
TRTR Briefing September 2013
RESOLUTION OF GENERIC SAFETY ISSUE 191
Presentation transcript:

1 Emerging Issues: Materials and Mechanical Michele G. Evans, Session Chair 2009 RIC

2 RIC 2009 Dissimilar Metal Butt Welds Ted Sullivan, SLS Division of Component Integrity Office of Nuclear Reactor Regulation March 11, 2008

3 Background Dissimilar metal (DM) welds made with Alloy 82/182 have experienced cracking since mid-1980s Cracking in Alloy 82/182 butt welds (BW) has been experienced at many plants since 2000 Prior to 2006, butt weld inspection schedules based on ASME Code, Section XI

4 Regulatory Approach In late 2005 industry implemented initiative MRP-139 with more aggressive inspection schedules RIS notes MRP-139 adequate for the near term Staff requested ASME to develop a code case on inspection of Alloy 82/182 butt welds

5 Regulatory Approach ASME approved Code Case N-770 in January 2009 –Contains inspection requirements for unmitigated and mitigated Alloy 82/182 welds NRC staff developing a proposed rule updating 10 CFR 50.55a to incorporate 2005 Addenda through 2008 Addenda Staff expects this rule to propose incorporation of Code Case N-770, with conditions –Proposed rule projected to be issued end 2009

6 Proposed Code Case N-770 Conditions Code Case N-770 inspection requirements for mitigated welds intended to be used in conjunction with ASME Code Cases on mitigation requirements Mitigation Code Cases are in various stages of completion/approval Pending approval of mitigation code case, NRC staff review of most plant specific mitigations needed to use relaxed inspection requirements in Code Case N-770 Expect to propose other conditions

7 Other Related Activities Ongoing inspections of MRP-139 programs by regions TI revision Discussion of deviations from MRP-139 with licensees