Www.energy.gov/EM 1 Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth and Paducah William E. Murphie Manager Portsmouth/Paducah.

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

Lesson 3 Responding to Emergency Events. For additional information or questions please contact Toledo-Lucas County Health Department APC:
The Committee and Research – Where are we and where might we be going?
S. L. King & Associates, Inc. Engineers Planners Managers Aviation Safety, Security & The Environment Asset Management and Planning of Utilities Infrastructure.
Office of Nuclear Energy 1May 20, 2013 Property Management Workshop Office of Nuclear Energy Program Perspective Delivering Nuclear Solutions for America's.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Hingham Public Schools Preliminary Budget Information FY 2016 Service and Facilities January 12, 2015.
Program Name or Ancillary Texteere.energy.gov June 16, 2011 Soudeh Motamedi IBM Contractor, DOE Sustainability Performance Office Year-End Sustainability.
DEPUTY DESIGNATED FEDERAL OFFICIAL PRESENTATION JOEL BRADBURNE, PORTS SITE LEAD U.S. DEPARTMENT OF ENERGY Portsmouth Site Specific Advisory Board September.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
BRC Storage & Distribution Safety and Quality Management System Training Guide
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
1 Waste Management David Nickless Environmental Management Los Alamos Field Office March 3, 2015.
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
GREEN BUILDING.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
NASA Real Property Program August 20, 2014 Scott Robinson Director, Facilities Engineering Division Acting Director, Integrated Asset Management Division.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
TRP Chapter Chapter 4.2 Waste minimisation.
SACHE Faculty Workshop - September Inherently Safer Design Example Dennis C. Hendershot Rohm and Haas Company Engineering Division Croydon, PA
Avoiding a Dam Midlife Crisis 2011 NWHA Annual Conference Scott Larrondo—Idaho Power Company Manager, Power Plant Engineering & Construction.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
Control Selection Techniques Employed for D&D Projects with Emphasis on Nuclear Criticality Safety Controls Brenda L. Hawks Engineering Director Oak Ridge.
Prevention-Mitigation Fiscal Year 2010 Initial Grantee Meeting December 8 – 9, 2010, Santa Monica, California Arthur Cummins Director Safe and Healthy.
The JINR engineering infrastructure is a multi component structure of the interacting elements. The following subsystems have the greatest effect on integrative.
Green Building Demonstration Project Adam Saling City of San Diego.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
1 Los Alamos Legacy Cleanup Completion Project (LCCP) Post Fiscal Year 2016 Contract(s) Industry Day Request For Information & Capability.
A N N I S T O N A R M Y D E P O T Environmental Management System Implementation at Anniston Army Depot April 8, 2004.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
FY 2005/06 Accomplishment Eastern Maine Medical Center (EMMC) Receives “Critical Power Reliability” from CHP System CHP System Construction Project is.
Unit 5 Lesson 3-5 Combined Transportation, Manufacturing, Construction.
Social Benefits Improve public health of work force and community. Create more walkable, accessible, and livable neighborhoods by incorporating Smart Growth.
1 Resuming Operations at WIPP Frank Marcinowski Acting Associate Principal Deputy Assistant Secretary for The Office of Environmental.
Update on Procurement Opportunities and Acquisition Process
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Alaska Municipal League 59th Annual Local Government Conference The Programs of the Alaska Energy Authority Energy and Empowerment for Your Communities.
DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Portsmouth Site Status Report September 15, 2015 ASP 2015 Workshop.
EM Budget--- Past/Present/Future Mark W. Frei U.S. Department of Energy October 14, 2005.
Repatriation of Vinča RA Reactor Spent Fuel The 15th International Symposium on the Packaging and Transportation of Radioactive Materials PATRAM
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E LashCIE Presentation 1/98 1 Recent Accomplishments and Future Directions Dan Giessing U.S. Department.
Slide 1 Fort Detrick Sustainability Planning Workshop #1 – Out Brief 1 Jul 08.
1 What’s New in Environmental Management? Karen Shears, Director Procurement and Contracts Division Oak Ridge Office of Environmental.
Board Meeting June 27, 2013 California Environmental Protection Agency Air Resources Board Update on Recommendations to the California Public Utilities.
DOE ASSET MANAGEMENT PLAN
AIR POLLUTION PREVENTION AND CONTROL
Brookhaven Science Associates U.S. Department of Energy Leveraging the Management Review Process of ISO and OHSAS for Facility-level and Institutional-level.
FIMS/Real Estate Workshop Palm Springs, CA June 2-6, 2008 DOE Oak Ridge Office Rebecca Whitehead.
1 West Valley Demonstration Project FY 2014 Budget Briefing Bryan C. Bower May 22, 2013.
Calder Hall Sellafield Decommissioning Martin Adam Heriot-Watt Edinburgh 2008.
1 EM Update Presented to the National Governors Association Federal Facilities Task Force Dr. Inés Triay Principal Deputy Assistant Secretary for Environmental.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF ORDER Larry Stirling
East Tennessee Technology Park Emergency Management Program (Vision 2020) Darryl Bonner UCOR Emergency Management October 15, 2015.
Gerald G. Boyd Assistant Manager for Environmental Management
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
American Recovery & Reinvestment Act Office of Environmental Management Presentation to Regulators March 6, 2009 Cynthia V. Anderson, EM Recovery Act Program.
Base Maintenance Contract (BMC) Industry Day Participants
Worker Safety and Health Enforcement Program Update
Energy Savings Projects
UMCP Learning Objectives
Implementing Effective Energy O&M Strategies on a Limited Budget
Oak Ridge Office of Environmental Management Update
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
Presentation transcript:

1 Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth and Paducah William E. Murphie Manager Portsmouth/Paducah Project Office (PPPO) DOE National Cleanup Workshop, Washington, D.C. September 30, 2015

2 PPPO Sites Paducah, KY >100 acres under roof, built in 1950s Deactivation contract began in 2014 Evolving from an operating plant enriching uranium to a cleanup/S&M and D&D Mission Environmental remediation and DUF6 conversion Portsmouth (Piketon), OH >100 acres under roof, built in 1950s Active D&D contract began in 2010 Providing services to other site tenants and the nearby community (Fire, security, roads, waste, etc.) Environmental remediation and DUF6 conversion

3 Base & Safe Operation Activities Optimized “Goal: DEMOLITION READY” GDP Nuclear Facilities Inherently Safe Achieve ‘Criticality Incredible’ GDP Nuclear Facilities from CAT II to Radiological Fissile Deposit Removal Complete Fissile Loose Equipment Disposed Stabilization & Deactivation Freon/Lube Oil Removal Freon/Lube Oil Removal Power Distribution Reconfiguration Power Distribution Reconfiguration Boiler replacements Boiler replacements Facilities Winterized Facilities Winterized Automated Access Controls Automated Access Controls Utilities Optimized Utilities Optimized Utility Isolation Utility Isolation Lessons learned from OR, PORTS and DOE-wide Lessons learned from OR, PORTS and DOE-wide Time Uranium Deposit Removal Uranium Deposit Removal Tc99 Removal Tc99 Removal Disposition of Removed Fissile Equipment Disposition of Removed Fissile Equipment Hazard Material Removal Hazard Material Removal Unnecessary Safety & Other Systems Deactivated Excess Fire Loading Removed Vacate facilities, isolate utilities and further reduce utility usage Cost Reduction of Radiological Material Near-Term Strategy

4 Deferred Maintenance Assessment Both the Portsmouth and Paducah gaseous diffusion plants were returned to DOE with significant maintenance/repair backlogs. As part of an EM-wide initiative (per Assessment of EM Site Infrastructure memo from Mark Whitney dated December 19, 2014), PPPO has developed: Deferred maintenance activities to ensure safety and protection of the workforce and the environment Complex-wide lessons learned with respect to missions and onsite government assets Critical structures, systems and components in a state of operational readiness to ensure safety.

Develop a plan  Include previous contractor data  Conduct site inspections of GDP  Incorporate into computerized maintenance management system (CMMS and FIMS)  Determine needs and ROMs 2. Assess actions  Risk to personnel/environment  Safety System Class  System Health reporting  Potential Return on Investment  Lessons learned 3. Implement actions  Projects ongoing (examples follow) Hotel load reduction: $400,000+/yr. Deferred Maintenance Approach 4. Ensure contractor performance  Evaluate establishing a PBI to minimize Deferred Maintenance  Conduct field oversight inspection(s) to ensure timely maintenance of site systems and facilities

6 Benefits of Taking Actions Now Improves worker safety Reduces potential for catastrophic equipment failure (e.g., electrical equipment) and inability to continue critical activities Prepares facilities for demolition Drives down hotel costs

7 Maintain facilities and equipment to facilitate D&D Allows for bridge cranes and other critical facility systems to be utilized during deactivation and demolition. 1.2 million sq. ft. of roof recently repaired at Paducah. 750,000 sq. ft. of roof repaired at Portsmouth in the last 2 years. Benefits of roof repairs include:  Reduced risk of electrical failures  Reduced risk of spread of contamination  Reduced heating costs  Reduced risk of facility degradation Lessons Learned from Oak Ridge ETTP Facility Stabilization/Surveillance & Maintenance

8 Utilities Optimization Approach GDP Site Utilities oversized for Mission 1. Contractor evaluates existing site infrastructure. 2. Evaluate optimization study and recommendations. 3. Fast-track high-benefit utility activities: Steam generation and distribution Power distribution Plant and sanitary water Sewage collection and treatment Nitrogen distribution Dry/Compressed air generation and distribution Chilled water Recirculating heat system Natural gas distribution 4. Implement additional activities. Contract modifications for near-term actions (current contractor) Integrate optimization activities into subsequent Contract PWS Use PBIs to ensure time/cost-effective completion for field work

9 New Paducah package steam boilers General benefits: Facilities rightsized for the mission Reduction in lifecycle costs Improved utility efficiency Increased utilities flexibility Steam Plants Replacement New Portsmouth gas steam plant Old

10 Advantages -Enhanced safety - All feeders above ground for easier maintenance and isolation/deactivation -New busses utilize low to no maintenance vacuum breakers -Saves MWh switchyard losses (energy efficiency) PORTS Power Distribution System re-configuration

11 GDP C-535 Switchyard From Utility BWCS Paducah Electrical Power Prior to Reconfiguration C-531 Switchyard C-533 Switchyard C-537 Switchyard From Utility 14.8 kV x 10 Lines 14.8 kV x 1 Lines 161 kV x 1 Lines GDP C-535 Switchyard BWCS C-531 Switchyard C-533 Switchyard C-537 Switchyard 14.8 kV x 10 Lines 14.8 kV x 1 Lines 161 kV x 1 Lines Paducah Electrical Power Phase 1 Reconfiguration (Complete) GDP BWCS New Switchyard From Utility 14.8 kV x 10 Lines 14.8 kV x 1 Lines 161 kV x 1 Lines Paducah Electrical Power Phase 2 Reconfiguration (Ongoing – Complete in 2018) From Utility Paducah Power Distribution System re-configuration Advantages - All power re-routed from 4 to 1 switchyard - Removes site from Bulk Electric System

12 Comprehensive fire water repair and right-sizing Stand-alone air plant and cooling tower consolidation Water treatment modifications using sodium hypochlorite, thereby eliminating chlorine gas cylinders Cost sharing and improved operations of site utilities through shared community resources Steam plant enclosure for reliability and energy efficiency Sprinkler freeze damage alternatives analysis Hotel load reduction: $400,000+/yr. On-going Projects

13 Excess Facilities Perform D&D (Most cost-effective option) Portsmouth facilities removed to date: 36 Paducah facilities removed to date: 32 Eliminates radiological & chemical hazards and risks of releases Eliminates security vulnerabilities Avoids cost increases associated with facility and system degradation due to deferred D&D Eliminates monitoring and required S&M Costs

14 In summary… An effective program to address deferred maintenance and excess facilities can promote both safety and cost savings.

15 Questions/Comments