International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke,

Slides:



Advertisements
Similar presentations
FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.
Advertisements

Boris Sharkov FAIR Joint Core Team
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther Rosner NuPECC LRP2010 Town Meeting Madrid, 2/6/10 1.
Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.
FAIR – Facility for Antiproton and Ion Research * FP6 Proposals * Status and Recent Activities Walter F. Henning / GSI Darmstadt NuPECC, Lisbon, November.
Status of FAIR Boris Sharkov FAIR Joint Core Team.
September 19, 2006I. Augustin, GSI at PHIBADE 2006 Status of the FAIR Project I. Augustin FAIR Coordination Group GSI.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt EU FP7 FAIR pp - 1st Reporting meeting March 6, 2009 J. Eschke, GSI EU.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project TRD workshop, Romania, September 24-28, 2005.
J. Marton, ÖPG-FAKT, Weyer, September 27, FAIR at GSI and the Future of Hadron Physics J. Marton Institute for Medium Energy Physics Austrian Academy.
Raport o stanie projektu FAIR – przedstawiony w oparciu o folie prof.W. Henninga, dyrektora GSI, oraz H. Wenningera kierującego pracami STI i H.-F Wagnera.
GSI and FAIR - EPICS status report - Peter Zumbruch Experiment control systems group GSI (KS/EE)
Lasers and Highly-Charged Heavy Ions at Günther RosnerHZDR Workshop, Rossendorf, 6/9/111.
1 Antiprotons at FAIR FLAIR SIS 100 / 300 pbar production Capture and accumulation deceleration High Energy Storage Ring for Antitprotons (HESR): 0.8–15.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
FAIR GmbH and FAIR Project History, Status and Outlook
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121.
Research Areas at FAIR Structure and Dynamics of Nuclei - Radioactive Beams Nucleonic matter Nuclear astrophysics Fundamental symmetries Hadron Structure.
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
FAIR – Facility for Antiproton and Ion Research
Future Penning Trap Experiments at GSI / FAIR – The HITRAP and MATS Projects K. Blaum 1,2 and F. Herfurth 1 for the HITRAP and MATS Collaboration 1 GSI.
FAIR – Status Report Walter F. Henning.
D. Krämer - Tech. Discussions GB, Oct. 11 th, 2006 Workpackages and In-Kind Contributions to FAIR The FAIR Project Preparatory Phase - R&D for FAIR Workpackages.
European Strategy Forum on Research Infrastructures Dr.- Ing. Beatrix VIERKORN-RUDOLPH ESFRI Chair NuPECC Long Range Plan 2010, 9 th December 2010.
Claudia Höhne GSI Darmstadt
Workshop Summary: Physics and Technology Frontiers of Facilities for Hadron Physics Richard Milner Massachusetts Institute of Technology Frank Rathmann.
Working Group 5 Summary David Christian Fermilab.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study Annual Report meeting December 7, 2006 J. Eschke,
Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/ (courtesy of D. Krämer for the FAIR Design Team) Current.
FAIR/SFRS meeting at HIPHeikki Penttila Oct 6, 2008 Facility for Antiproton and Ion Research FAIR is An international accelerator facility of the ”next.
NUSTAR Nuclear Structure, Astrophysics, Reactions NUSTAR is the biggest collaboration in FAIR The collaboration unites 450 scientists from 98 institutions.
The Facility for Antiproton and Ion Research in Europe Günther RosnerMESON2012, Krakow, 4/6/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
2 February 2009Ö. Skeppstedt1 FLAIR Collaboration Meeting 2–3 February 2009 Manne Siegbahn Laboratory, Stockholm FAIR status from the AFI chairman point.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
FAIR International Facility for Antiproton and Ion Research Key features and organization Plans for realization Experiments and LOIs Technical challenges.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
Welcome to FAIR RF Review for TAC Meeting in June 2007.
The FAIR* Project *Facility for Antiproton and Ion Research Outline:  FAIR layout  Research programs Peter Senger, GSI USTC Hefei Nov. 21, 2006 and CCNU.
Status and Perspectives for the NuSTAR collaboration Reiner Krücken Physik Department E12 Technische Universität München.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
UK Research in Nuclear Physics P J Nolan University of Liverpool.
Oct. 16, 20081CBM Collaboration Meeting, Dubna, Zbigniew Majka FAIR project status  Establishment of the FAIR GmbH  Accelerator construction  Civil.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
The HITRAP Project at GSI For the HITRAP collaboration: Frank Herfurth GSI Darmstadt.
1 FAIR Project – status and research program Zbigniew Majka – FAIR Joint Core Team, Head of Research Facility for Antiproton and Ions Research Helmholtz.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
FRIB-China/CUSTIPEN Fundamental Interactions - Experiment Results of Parallel Working Group
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany 2nd PhD Science GSI 2014 – 11 August 2014 FAIR – Facility for Antiproton.
O. Kester, NuSTAR annual meeting, 27/02/2013
The Belgian Research Initiative on eXotic nuclei – BriX network BriX Days Oostende, March 25-26, 2013 Funded by the Interuniversity Attraction Poles Programme.
GSI Helmholtzzentrum für Schwerionenforschung GmbH GSI visitation W. Barth W. Barth, WAO 2014, Mainz/Germany.
International Conference on Science and Technology for FAIR in Europe 2014 APPA Cave Instrumentation for Plasma Physics Vincent Bagnoud, GSI and Helmholtz.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
Status of FAIR D. Krämer Dec. 1&2, 2010 – 4th MAC Meeting 1.
Itzhak Tserruya Weizmann Institute of Science
ESR Slow highly charged ions and antiprotons
Perspectives for Heavy-Ion Collisions at Future Facilities
for the EURISOL Steering Committee
In-Kind FAIR David Urner FAIR, Darmstadt , D. Urner.
FAIR – the Universe in the labororatory
Presentation transcript:

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke, GSI Status Report on FAIR CBM Collaboration Meeting 9 th March, 2005 J. Eschke, GSI 1.Submission of TPs and TRs  Evaluation by PACs and TAC 2.3 Phase staged construction scenario 3.ISC Decisions 4. Next Steps

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke, GSI PAC on Nuclear Structure and Nuclear Astrophysics (NUSTAR-PAC): 667 users in 10 TPs [ 450 on LoIs] 1.) Low Energy Branch (LEB)Scheidenberger GSI High-resolution In-Flight Spectroscopy (HISPEC)/ Zs.Podolyak/ Surrey Decay Spectroscopy with Implanted Ion Beams (DESPEC)+ B. Rubio Valencia Precision Measurements of very short-lived Nuclei using an Advanced Trapping System for highly-charged Ions (MATS)K.Blaum Mainz LASER Spectroscopy for the Study of Nuclear Properties (LASPEC)P. Campbell Manchester Neutron Capture Measurements (NCAP)M.Heil FZK Antiprotonic Radioactive Nuclides (Exo+pbar)M. Wada Riken 2.) High Energy Branch (R3B) A Universal Setup for Kinematical Complete Measurements of Reactions with Relativistic Radioactive Beams (R3B)T. Aumann GSI 3.) Ring Branch (STORIB) Study of Isomeric Beams, Lifetimes and Masses (ILIMA)Y.Novikov SPNPI Exotic Nuclei Studied in Light-Ion Induced Reactions at the NESR Storage Ring (EXL)M. Chartier Liverpool Electron-Ion Scattering in a Storage Ring (e-A Collider) (ELISe)H. Simon GSI Antiproton-Ion Collider: A Tool for the Measurement of Neutron and Proton rms radii of Stable and Radioactive Nuclei (AIC)R. Krücken TUM Technical Proposals

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke, GSI PAC on Quantum Chromo DynamicsCD (QCD-PAC): 909 users in 4 TPs [834 in 5 LoIs] ASSIA Study of Spin-dependent Interactions with AntiprotonsR.Bertini Torino (90) CBM Compressed Baryonic Matter ExperimentP.SengerGSI (294) PANDA Strong Interaction Studies with AntiprotonsU.WiednerTSL Uppsala(348) PAX Antiproton-Proton Scattering Experiments with PolarizationF.RathmannFZJ (177) PAC on Atomic Physics, Plasma Physics and Applications (APPA-PAC) 578 users in 5 TPs [ 505 on LoIs] (Laser Cooling of Highly Charged Ions at SIS 100/300U. SchrammLMU) FLAIR - A Facility for Low-energy Antiproton and Ion ResearchE. Wiedman Tokyo (Anti-deuteron Breeding in a Double Ring ColliderW. Oehlert FZ-Jülich) SPARC Stored Particles in Atomic physics ResearchR. SchuchStockholm HEDGEHOB: High Energy Density matter Generated by Heavy-iOn BeamsD. Varentsov Darmstadt BIOMAT Applications of Relativistic Ions in Radiobiology M. Durante Napoli and Space Research/ Materials Research with Relativistic Heavy Ion Beams S. KlaumünzerHMI WDM Radiative Properties of Warm Dense MatterF. B. RosmejMarseille Technical Proposals

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke, GSI Technical Reports FAIR 'Final' Layout 1.SIS18 upgrade 2.SIS100 3.SIS300 4.Super-FSR 5.CR 6.RESR 7.NESR 8.Proton LINAC 9.HESR 10.Beam lines 11.Cryogenics 12.Controls 13.Civil Engineering 14.Radiation Safety

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke, GSI

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke, GSI PAC and TAC Sessions March 14 th - 17 th Monday March 14, 2005 Tuesday March 15, 2005 Wednesday March 16, 2005 Thursday March 17, 2005 Morning 09:00-12:30 Plenary (1h) mandate (S.G. or H.G.) 3 parallel PAC (TAC members attending) 3 PAC and 1 TAC session in parallel STI with PAC/TAC chairmen 3 parallel PAC (TAC members attending) Afternoon 14:00 -18:00 3 PAC and 1 TAC session in parallel - closed sessions for preparation of recommendations STI closed session - closed session for preparation of recommendations

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke, GSI 3-Phase Project Staging General strategy: Groundwork, supply systems and major buildings as early as financially possible (potential for smoothing financial profile?) Scientific facilities staged according to three science programmes Contributions from outside mainly in kind for scientific facilities

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke, GSI 3-Phase Project Staging Three stages according to fields of physics: 1.Radioactive beam physics Nuclear structure and nuclear astrophysics Atomic physics studies with highly charged/radioactive ions 2.Proton-antiproton physics QCD studies with protons and antiprotons Precision studies with antiproton beams addressing fundamental symmetries and interactions 3.Full facility research Full parallel operation of up to four experiments Full energy and luminosity for nuclear collisions program at CBM Precision QCD Studies at PANDA up to 8 GeV Plasma research (full gain factor in power density: ~400) Atomic reaction studies with fast beams

Stage 1: Civil Construction Ringtunnel for double ring synchrotron incl. technical buildings Buildings housing the Super-FRS, the CR and NESR plus nuclear structure and atomic physics experiments Office building Accelerator 2 x /puls U 28+ at 200 AMeV 4 x /puls U 73+ at 1000 AMeV 4 Hz up to 12 Tm; 1 Hz up to 18 Tm Bunch compression to 70 ns Research Nuclear structure and nuclear astrophysics (gain factor in intensities for radioactive secondary beams: ~100) Plasma physics at 'old' facility (gain factor in power density: ~200) Atomic physics studies with highly charged/radioactive ion beams Staged construction scenario

Stage 2: Civil Construction (completed) p linac building HESR building Buildings housing nuclear collision, plasma physics and atomic physics experiments Accelerator 1 x /puls U 28+ at 2,7 AGeV 1 x /puls U 73+ at 8,3 AGeV (Ne 10+ bis 14 AGeV) Bunch compression to 50 ns 2,5 x /puls protons up to 29 GeV up to antiprotons accumulated, stored and cooled in the HESR up to 15 GeV low (down to zero) energy antiprotons at NESR and HITRAP Research Nuclear structure and nuclear astrophysics (full gain factor in intensities for radioactive secondary beams: ~ ) QCD studies with protons and antiprotons Precision studies with antiprotonn beams addressing fundamental symmetries and interactions HESR

Stage 3: Accelerator 2 x 10 9 /puls U 92+ up to 34 AGeV Stretcher option with long extraction times from seconds up to minutes High energy e-cooling for HESR Research Full energy and luminosity for nuclear collisions program at CBM Precision QCD Studies at PANDA up to 15 GeV Plasma research (full gain factor in power density: ~2500) Atomic reaction studies with fast beams Full parallel operation of up to four experiments

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke, GSI CountrySignatorySignature received - dated FinlandProf. Dr. D. RiskaX – FranceDr. E. GiacobinoX GermanyDr. H. SchunckX – GreeceProf. Dr. C. FotakisX – ItalyDr. L. CriscuoliX PolandProf. Dr. R. KulessaX Russian FederationS. MazurenkoX – SpainDr. S. Ordónez DelgadoX – SwedenDr. P. OmlingX – United KingdomProf. Dr. John WoodX – Status Signatures Memorandum of Understanding for the FAIR project (January 18, 2005)

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke, GSI The International Steering Committee for FAIR PAC QCD E.Chiavassa PAC NUSTAR R.Casten PAC APPA D.Schwalm TAC Yanglai Cho Observers: FAIR Project Cost Review Group (CORE) Full Cost Structure Group AFI Working Group Administrative and Funding Issues H.F.Wagner Legal Working Group Dr. Jahn STI Working Group Scientific + Technical Issues Sidney Gales ISC Internat. Steering Committee H.Schunck

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke, GSI ISC Decisions The Steering Committee considers the concept proposed for the organisational structure of FAIR as basically appropriate, both for construction and operation. It thus supports: 1. the legal form of a German limited liability company (GmbH), 2. the proposed extension of the present GSI GmbH with international shareholders from the FAIR partner countries and 3. the development of the FAIR convention as well as appropriate articles of association and by-laws, as a basis for the future contractual negotiations and agreements between the partner countries. The signature of the Convention is envisaged for the summer of For the selection of candidates for the positions of FAIR Project Director and Head of the FAIR Division an international search committee will be set up by the Supervisory Board of GSI.

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke, GSI Research Division HADES FAIR GmbH with international shareholders Accelerator Operation Infrastructure Division Buildings Facility Maintenance Central Services ALICE FOPI PHELIX+PP Spectroscopy SHE / Chemistry Material Research Atomic Physics Bio Physics Injectors Rings Beam Diagnostics Vacuum HF Operating HD-Therapy IT Technical Services Detector-Lab. Target-Lab. Documentation / Library Human Resources Administration Finance Purchasing FAIR Division (FAIR Technical Director) Civil Construction CBM -TI PANDA-TI Integration Theory FRS/ESR HE Reactions International Steering Commitee Administration and Financial Issues WG Scientific and Technical Issues WG Company General Assembly Supervisory Board Directorate DG Sci. Tech. Admin. FAIR International FAIR Project Management Board Administrative Council Scientific Council Scietific / Technical Advisory Committees Controlling,Legal Issues Safety EU Contracts, 3rd Party Funding Users, Public Relations Experiment Electronics Electrical Engineering Super-FRS-TI RIB Low Energy Branch TI RIB High Energy Cave TI RIB Ring Branch TI FLAIR & SPARC & Applications Facilities TI Plasma Physics TI Theory /systems Controls SC Magnets Cryosystems TI= Technical Infrastructure CBM PANDA NUSTAR Exp. groups FLAIR & SPARC Accelerator FAIR Experiments -TI FAIR Project Management Team

Convention (Governmental Contract – provisions for general framework, procedures, arrangements; annexes?) Articles of Association (based on rules of German limited liability company (GmbH) law; recorded and registered with notary public; any changes require full notary public process) By-Laws (contract(s) on specific rules and regulations between shareholders; does not require notary public involvement) plus additional bi-lateral, multi-lateral contracts, MoU's etc between shareholders and other parties

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke, GSI PAC's Technical Committee Signing of MoU Phase I – Governed by MoU Phase II Governed by Contracts The ISC-FAIR International Working Groups MoU Proposals / TR's LoI's

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke, GSI Contract(s) Development Contract(s) Negotiations Closing PAC's Technical Committee Signing of MoU Phase I – Governed by MoU Phase II Governed by Contracts The ISC-FAIR International Working Groups MoU Proposals / TR's LoI's

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke, GSI Contract(s) Development Contract(s) Negotiations Closing PAC's Technical Committee TDR's Signing of MoU Phase I – Governed by MoU Phase II Governed by Contracts The ISC-FAIR International Working Groups Evaluation by Advisory Committees by Mid March 05 Cost Review by CORE group Final Project Definition MoU Proposals / TR's LoI's

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke, GSI Next Steps Ongoing since November 2004: Member States and others start signing up for work packages January 15 th, 2005, Submission of TRs (Technical Reports -Accel.) and TPs (Technical Proposals) March th of Evaluation of TPs and TRs in TAC and PACs sessions  Determination of costs of each subproject, Checking by the CORE Group of experts Summer 2005: New Planning based on new information form TRs and TPs in mid 2005, the International Steering Committee defines the Project based on the scientific merits (STI) and the resources (AFI) available, prepares Contract 2005 Determination of Legal Structure of FAIR-GmbH, draft of FAIR contract Summer of 2006: Contract on FAIR signed by Member States, followed by Start of construction of FAIR 2006 to 2010 Technical Design Reports (TDR) for the sub systems : Commissioning of FAIR