Physics coordinator report: Shifts 2014 Schedule 2015 Access, safety and courses b508 and 275 Magdalena Kowalska.

Slides:



Advertisements
Similar presentations
GEn_stat_12-05 Hall A Collaboration Meeting December 5-6, 2005 Status Report: G En G. Cates, K. McCormick, B. Reitz, and B. Wojtsekhowski; spokespersons.
Advertisements

LS1 & Buildings 115, 507 and 601. Building 601 Building 601 (kitchen & entrance): Power has been cut and disconnected (Patrick Gallay EL) All items removed.
HIE-ISOLDE HEBT: characteristics Beamline diameter: 40 mm (REX: 100 mm) Beamline height: 1.75 m Beamline vacuum: low 1e-7- high 1e-8 mbar Connection of.
Magdalena Kowalska, CERN PH-SME-IS ISOLDE scientific coordinator’s report ISCC meeting, July 6, 2011 Beam requests and schedule 2011 Experimental statistics.
ESTB Test Beam Procedures User Support Operations Schedules Carsten Hast March 17 th 2011.
Space for Nicole Maria J. G. Borge & Magdalena Kowalska.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
MOM Report Galina Vankova RAL, MICE Video Conference.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
TEST BEAM 2007 Dates, Facilities, Safety Cinzia Some key slides from Beniamino Di Girolamo CERN.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
WG7: 2014 RD51 Test Beam Brief introduction to the RD51 semi-permanent test beam area H4 (mostly for our Indians colleagues) News & Reminder ( mostly for.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
B508 and 275 Magdalena Kowalska. b275 2 AEGIS laser lab ASACUSA test setup g-BAR? Storage of big parts, test stands? Test setups SSP, detector labs Electronics.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
FACET User Support Carsten Hast Accelerator Research Division Test Facilities Department
ISOLDE Physics Coordinator Report Schedule Access to the hall Visits b275 and b508 Magdalena Kowalska.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Scheduling News. Magdalena Kowalska. Injector schedule since last meeting 2 Confirmation of 2 week proton prolongation – until December 17 th : 35 ->
2 Workshop 2014 Status of the Project Klaus Blaum, MPI for Nuclear Physics, Heidelberg for the Collaboration CERN, Geneva,
ISOLDE Physics Report Magdalena Kowalska. Injector schedule since last meeting 2 September: confirmation of 2 more weeks with protons – until December.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
ISOLDE PH report Schedule 2012 Physics results 2012 Experiments, users New template Safety Long shutdown PH and ENSAR news Magdalena Kowalska Yorick Blumenfeld.
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Magdalena Kowalska, CERN PH-SME-IS ISOLDE scientific coordinator’s report ISCC meeting, November 4, 2010 Running period 2010 Status of INTC shifts Accelerator.
Physics coordinator report: Overview of 2015 Karl Johnston.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, February 11, 2008 ISOLDE scientific coordinator’s report INTC meeting, February.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
ELENA installation progress F. Butin / ELENA collaboration.
Schedule Access to the hall b508. Magdalena Kowalska.
Test beam check list Michael JECKEL EN-EA-EC.
PH Department News Discussion with management
Safety in the Neutrino Platform Hall
Physics coordinator report
Physics coordinator report
ISOLDE PH report Schedule 2012 Physics results 2012 Experiments, users
Test beam check list Michael JECKEL EN-EA-EC EDMS:
LHCb & EYETS
YETS Dec 2017 – March 2018 LS Experiments requirements / Services (un)availability F.Butin / EN-EA EACM meetings outcome, thanks to all participants.
Alexander Herlert, CERN (PH-SME-IS)
Difficult beams accepted in 2014 (updated since last meeting)
The current plan and a call for some help
A. Herlert, CERN PH-SME-IS
Magdalena Kowalska, CERN PH-SME-IS
Scheduling News . Magdalena Kowalska.
Magdalena Kowalska, CERN PH-SME-IS
A. Herlert, CERN PH-SME-IS
Magdalena Kowalska, CERN PH-SME-IS
Coordinator’s report . Magdalena Kowalska.
Thomas Nilsson, CERN EP/IS
Experimental Areas – LS2 planning
New procedures 2013: registration access
INTC matters . Magdalena Kowalska.
A. Herlert, CERN PH-SME-IS
Alexander Herlert, CERN (PH-SME-IS)
Presentation transcript:

Physics coordinator report: Shifts 2014 Schedule 2015 Access, safety and courses b508 and 275 Magdalena Kowalska

Experiments Physics since last meeting (Nov14)  Beta decay of 37K at LA1  2x COLLAPS on n-rich Zn  LaC target tests and some physics for n-rich Ba  27Mg for SSP  Fr for CRIS – ISOLDE working this time  Nano-UC: target tests and physics at IDS  Offline Ho collections Plans for 2015: safety clearance required before running!  IDS – new detector frame, neutron detectors  VITO – revive ASPIC, start on laser polarization towards b-NMR  COLLAPS,CRIS – moving into new laser labs  SSP – moving into new labs, Mossbauer, ASPIC, chemistry lab  ISOLTRAP – decay spectroscopy behind MR-TOF  TAS – plan running in 2015  MINIBALL – frame mounting in March 2 Many nice photos of the hall: link

Shifts 2014 Physics programme was running until December 15, 2014 Shift balance after Feb15 INTC – about 1550 shifts: Low-energy: ca. 735 REX: ca. 130 HIE-ISOLDE: ca Delivered Protons5.5e1911.5e198.05e19 All shifts (IS+LOI+MD) Shifts for IS exp Shifts for LOIs REX shifts (IS +LOI) Average IS shifts/day

Delivered shifts

Schedule 2015 First protons: on Apr 7 Physics: a few days later Proton stop: mid-Nov or mid- Dec: To be decided (including status of HIE-ISOLDE) Stop of low-energy physics: Mid-Oct, when HIE-ISOLDE physics starts (unless delayed) HIE-ISOLDE physics: Mid-Oct (unless delayed) till proton stop 5 ISOLDE schedule – low-energy beam requests sent this week, in 3 parts

Safety and courses For all setups: fixed and travelling: safety clearance required before RUNNING  Travelling setups – template will be send some weeks before running, small safety visits/checks once setting up started  Contact your local contacts in case of questions Courses in 2015 for all:  Online: general and ISOLDE RP, electrical awareness  2-h ISOLDE RP (for everybody, not only new users and new dosimeter requests)  1.5-h ISOLDE electrical safety: NEW for all, together with RP course Specific courses:  2-h cryogenic course  Soon: 2-h mechanical-workshop safety  Soon: several-day mechanical-machine operation  First-aid  Crane operation  Etc … You are not allowed to perform operations for which you are not trained and authorized In case of doubt – contact the coordinator 6

Access to ISOLDE 7  Access to HIE-ISOLDE worksite: only local physicists when moving equipment  Access for users from Jura side for all, from March: with dosimeter

b275 8 Until March we have to liberate half of the building:  Ground-floor: shared space for test setups and setups/big equipment required close to ISOLDE  First floor: electronics lab, detector lab, and solid-state (non-RP lab)  Mezzanine: cupboards and shelves for experiments Try to apply transparent rules: remaining space to be shared by all groups  Ground floor room – big equipment which has to be accessible asap during beamtimes or is fragile  SSP lab: space for test setups  1 st floor – shelves and several cupboards for smaller equipment Equipment which doesn’t meet this criteria:  Pease send it long-term storage or home- institutes  Our associate is documenting the equipment to be shipped away AEGIS laser lab ASACUSA test setup g-BAR? Storage of big parts, test stands? Test setups SSP, detector labs Electronics lab 3 AD offices Shelves and cupboards for small parts

b275 9

B Physics users are moving in Being ordered:  Signal cables from ISOLDE hall  Kitchen  Equipment for visitor and meeting room  CERN locks In preparations:  Closed cooling water system  Vacuum gas exhaust  Opening for SSP gases and fume cupboard