1 Daniel Dobos University Dortmund13.08.03 Pixel Testbeam July 2003 Daniel Dobos University Dortmund 13.08.03 – E4 ATLAS-/Si-Meeting Pixel Testbeam July.

Slides:



Advertisements
Similar presentations
TEC X5 Setup (1) 1 Front + 1 Back petal, fully equipped (28 modules F.P modules B.P. + AOH + DOHM) Petal assembly IPN-Lyon (F.P.), RWTH-Aachen I.
Advertisements

Refrigerators.
38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
UNIVERSITA’ DEGLI STUDI DI NAPOLI FEDERICO II Luigi Cimmino November 12 th, Tokyo INTERNATIONAL WORKSHOP ON MUON & GEO-RADIATION PHYSICS FOR EARTH.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Control & Monitoring of DC-DC Buck Converters Satish Dhawan Yale University Power Distribution Working Group Meeting- Tuesday 24 February 2009 ATLAS Upgrade.
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
ZTF Interconnecting Scheme Stephen Kaye
CERN Testbeam overview September 2012 Dean Forshaw.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
Ladder QA manual. Check items 1 Interlock - Temperature of NOVEC. ✓ Check the difference from the value where the QA in RIKEN was performed is less than.
1 November 18, 2014 DOE SC-OPA Review of 12 GeV ENC vs. preamp load FSSR2 by FNAL Single chip on a PCB Load from capacitors SVT module testing.
Susanne Kersten, Wuppertal University November 21/22, 2013.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
Disk testing - status. Disk Test Setup we use similar setup as the one used for sector tests, only simplified (no C6F14 cooling system, no source test,
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
AIDA 1 Mezzanine board Contacts for underside connectors Thermal contact pads.
1 PreFPIX2 Inner board and test beam triggering Gabriele Chiodini Fermilab - Jan 07, 02.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
Status of NA62 straw electronics Webs Covers Services Readout.
Some thoughts on Tracking System for Stage 1 HPS Simon Kwan Fermilab 09/19/2011.
UK-V MeetingPaul John Dervan Irradiation's 2003 Update Paul Dervan Craig Buttar, Simon Dixon, Chris Grigson, Richard Nicholson and the irradiation team.
G. Kramberger, Charge collection properties of heavily irradiated expitaxial silicon detectors, RESMDD04, Oct , 2004, Firenze Setup and samples Setup.
CUE – Make Any Pump an E-Pump
IEEE October 16-22, 2004 First Look at the Beam Test Results of the FPIX2 Readout Chip for the BTeV Silicon Pixel Detector First Look at the Beam Test.
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
Steven Worm – RutgersMar 25, CMS Testbeam at Fermilab: Status and Plans o Testbeam Setup Status –Big pieces are now in place: telescope, Si, ROC,
Testbeam Post Mortem Immediate reflections on successes and failures Richard Plackett – University of Glasgow VELO Upgrade.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
FE electronic box Construction of end piece OT module Electronic components Mechanics Cooling.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
KTAG Mechanics, Optics and Cooling Progress and Schedule NA62 CEDAR Meeting 26March20121.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
Module mounting possibilities (FDR and module task force proposals) & Module mounting status at Dortmund Daniel Dobos, University of Dortmund
Progress in the Development of Evaporative Cooling Systems for the ATLAS Inner Silicon Tracker G. Hallewell 1 and V. Vacek 2 1 Centre de Physique des Particules.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Power consumption (Watts) LBB27 ROS18 TSC50 TIM8 1 SC crate416 Alignment20 TOTAL per rack906~1 kW X2J22X2J02 With a water flow of 10 l/min, it should.
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Nikhef/Bonn LepCol meeting
Silicon Lab Bonn Physikalisches Institut Universität Bonn
Kenneth Wraight, Andrew Blue, Kate Doonan & Sam Crawley
DT Infrastructure: LV, HV, Gas
FP420 Detector Cooling Thermal Considerations
Work packages status in Torino and perspectives
Pixel Standalone Test Beam: Status and Plans
Test Beam Measurements october – november, 2016
EVLA MONITOR & CONTROL CDR
Vertex Detector Overview Prototypes R&D Plans Summary.
Presentation transcript:

1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 Daniel Dobos University Dortmund – E4 ATLAS-/Si-Meeting Pixel Testbeam July 2003

1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 Testbeam setup testbeam setup moved some meters upstream to the NA45 area since may testbeam new pixel telescope (Genova telescope) inserted for high intensity runs in may testbeam and is now used together with the Bonn Telescope for particle tracking diode in the Genova Telescope generates additional trigger signal to the scintillator and Bonn Telescope trigger and increases particle scattering testing of modules requires cooling them in the testbeam box – testing single chips uncooled at room temperature new nitrogen flooded anti frost box prevents condensation on the turning mechanics of the testbeam box

1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 new copper plates for modules made each module plate is cooled directly with chiller liquid running through a copper tube tried use Lauda RC20 and Julabo FP50 with 2 modules each but Lauda chiller is to weak – FP50 used for all 4 modules better cooling of the nitrogen with conducting it through a first heat exchanger placed directly in the tank of RC20 and through a second heat exchanger in a paper box isolated with polyurethane foam and cooled with the F32 chiller new routing of the nitrogen flow: nitrogen is blown directly to each module and is helping to cool the modules carbon-carbon plates are glued on the FE's side of each module for better heat conduction with additional use of Dow Corning 340 silicone heat sink compound moving of the box and turning of the box can be remote controlled from CR DCS is monitoring the temperatures of the copper plate in two points, the carbon-carbon plate & the module NTC for each module and the air temp. and humidity of the box additionally modules can be tested at about -6°C, needs improvement to reach ATLAS conditions about -10°C Cooling of the modules

1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 Data flow and power supply each module is connected with a type0 cable with the PP0 replacement card same regulator board used as in Systemtest in Wuppertal in June to power the modules – same problem: VDDA & VDD are oscillating if the cables to the power supplies are to short or the regulator of the power supplies work to fast => high noise first used modularity two (one power supply for two regulator channels) but because of the above mentioned problems changed later to modularity one new PP0 replacement card is used to read out the four modules with a TPCC for each module and can handle up to seven modules DAQ has to handle now 5 TPLLs (one for each module and one for the Genova Telescope) and the BlueBoard Interface for the Bonn Telescope => problem of scalability, DAQ very unstable since last testbeam: doesn't recognises trigger events, hangs during and during stopping runs, hangs when modules are to noisy, sometimes doesn't read out the Genova Telescope => we're losing much time restarting the DAQ, sometimes after every run => needs improvement DCS is working stable – still some little bugs in the DCS software – no problems with controlling the ISEG since new iseg.dll is used documentation is still a problem – more easy problems could be solved by shifters without an expert – but is getting better (DCS and DAQ documentation started) – maybe a website with all important information like schematics of used components and user guides should be set up

1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 new testbeam setup in NA45 area

1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 modules mounted in the testbeam box

1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 PP0 replacement card

1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 first week: irradiated modules Ge18 (Tesla) and Bn12 (CiS) at -6/-7°C 0 deg: all chips at 600 V, for chip D scan in voltage: 700, 600, 550, 500, 450, 400, 350, 300, 250, deg: for chips 1, 6, B, C, scan in voltage: 700, 600, 550, 500, 450, 400, 350, 300, 250, deg: for chips 1, 6, B, C, scan in voltage: 700, 600, 550, 500, 400, 450, 350, 300, 250, deg: for chip 1 scan in voltage: 700, 600, 550, 500, 400, 350, 300, 250, 200 for chips 6, B, scan in voltage: 600, 550, 500, 450, 400, 350, 300, 250, 200 for chip C, scan in voltage: 600, 500, 400, 300 Irradiated modules: second week: irradiated modules Bn12, Ge18 and Ge14 at -6/-7°C Chip C and chip D: 0 deg: 600 Volt 5 deg: 600 V 10 deg: 600 V 15 deg: 600 V 20 deg: 600 V 30 deg: Voltage scan (300, 400, 500, 600, 700) Corner between 4 chips (C32D): Angular scan and Voltage scan Chip 9: 30 deg, Voltage scan Single chips: FEI2_SCC5, FEI2_SCC2, FEI2_IZM_2D at room temperature angular scan with beam centered on each chip (0 deg, 10 deg, 20 deg, 30 deg) high event run 700k at 0 deg for time walk measurements taken

1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 to be analysed...