03/30/06 DEJBNL&FNAL PD Collaboration kickoff meeting Beams-doc 2219 1 Current layout of beams from PD ~ 700m Active Length 8 GeV Linac 8 GeV neutrino.

Slides:



Advertisements
Similar presentations
Feb 09, 2012 L. Vorobiev, I. RakhnoPage 1 Multi-Turn Stripping Injection and Foil Heating with Application to Project X Presentation Based on: Phys. Rev.
Advertisements

PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Alexandr Drozhdin March 16, 2005 MI-10 Injection.
1 Dejan Trbojevic EIC Collaboration Meeting, Hampton University, Virginia May 19, 2008 Dejan Trbojevic e-RHIC with non-scaling FFAG’s.
Recirculating pass optics V.Ptitsyn, D.Trbojevic, N.Tsoupas.
FFAG Workshopfermilab April 2005 f Summary: FFAG WORKSHOP nonscaling electron model muon FFAGs C. Johnstone Fermilab.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Options for a 50Hz, 10 MW, Short Pulse Spallation Neutron Source G H Rees, ASTeC, CCLRC, RAL, UK.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
100 MeV- 1 GeV Proton Synchrotron for Indian Spallation Neutron Source Gurnam Singh Beam Dynamics Section CAT, Indore CAT-KEK-Sokendai School on Spallation.
Review on PSB 160 MeV H- Injection Nov 9-10, 2011 Closeout by P. Cruikshank, M. Giovannozzi, D. Johnson, B. Jones, B. Pine, M. Plum, D. Tommasini.
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Simultaneous Delivery of Parallel Proton Beams with the EURISOL Driver
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
H- beam collimation in the transfer line from 8 GeV linac to the Main Injector A. Drozhdin The beam transfer line from 8 GeV Linac to the Main Injector.
F Project X Overview Dave McGinnis October 12, 2007.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
F Project X: 8 GeV Recycler Injection S. Nagaitsev, D. Johnson, J. Lackey Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
ELIC Low Beta Optics with Chromatic Corrections Hisham Kamal Sayed 1,2 Alex Bogacz 1 1 Jefferson Lab 2 Old Dominion University.
Design of an Isochronous FFAG Ring for Acceleration of Muons G.H. Rees RAL, UK.
Beam Loss Simulation in the Main Injector at Slip-Stacking Injection A.I. Drozhdin, B.C. Brown, D.E. Johnson, I. Kourbanis, K. Seiya June 30, 2006 A.Drozhdin.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
Managed by UT-Battelle for the Department of Energy SNS Injection and Extraction Systems Issues and Solutions by M. Plum for the SNS team and our BNL collaborators.
Proton Driver Keith Gollwitzer May 31, Initial Design Overview For design purposes, the following is assumed –H - beam comes from PIP II and follow-on.
FFAG Studies at RAL G H Rees. FFAG Designs at RAL Hz, 4 MW, 3-10 GeV, Proton Driver (NFFAGI) Hz,1 MW, GeV, ISIS Upgrade (NFFAG) 3.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Project X: 8 GeV Transfer and Injection Injection Painting Kick-off meeting Dave Johnson APC/HINS June 27, 2008 Beams-doc 3129.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
1 Question to the 50GeV group 3GeV からの 54π と 81π 、 6.1π の関係 fast extraction 部の acceptance (81π?) Comments on neutrino beamline optics?
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
 A model of beam line built with G4Beamline (scripting tool for GEANT4)  Simulated performance downstream of the AC Dipole for core of beam using  x.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Status of the AP2 Optics Keith Gollwitzer Antiproton Source Department November 19, 2004.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Beam collimation in the transfer line from 8 GeV linac to the Main Injector A. Drozhdin The beam transfer line from 8 GeV Linac to the Main Injector is.
MI Beam Loss upon Acceleration 5E11/div 11BLMA=LM GeV/c 9.8GeV/c Start of Ramp Fast loss ~10 ms Slow loss.
Project X: 8 GeV Transfer and Injection Collimation and Injection Absorber R&D Kick-off meeting Dave Johnson APC/HINS June 20, 2008 Beams-doc 3125.
Main Injector H - Injection David Johnson Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
RCS design Valeri Lebedev AAC Meeting November 16-17, 2009.
Accumulator & Compressor Rings with Flexible Momentum Compaction arccells MAP 2014 Spring Meeting, Fermilab, May 27-31, 2014 Y. Alexahin (FNAL APC)
Investigation of Injection Schemes for SLS 2.0
Recycler Injection with Carbon Foils Dave Johnson, Alexandr Drozhdin, Leonid Vorobiev September 8, 2010 Project X Collaboration Meeting.
Beam Commissioning Adam Bartnik.
Off-axis injection lattice design studies of HEPS storage ring
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
J-PARC main ring lattice An overview
Large Booster and Collider Ring
NuSTORM - μ Storage Ring with Injection
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
The new 7BA design of BAPS
LHC (SSC) Byung Yunn CASA.
Collider Ring Optics & Related Issues
CLIC damping rings working plan towards the CDR
Negative Momentum Compaction lattice options for PS2
Negative Momentum Compaction lattice options for PS2
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Transfer Line for EIC.
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Alternative Ion Injector Design
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

03/30/06 DEJBNL&FNAL PD Collaboration kickoff meeting Beams-doc Current layout of beams from PD ~ 700m Active Length 8 GeV Linac 8 GeV neutrino Main MW Anti- Proton SY-120 Fixed- Target Neutrino “Super- Beams” NUMI Off- Axis Electrons for ILC Damping Ring Demo Homestake Henderson

03/30/06 DEJBNL&FNAL PD Collaboration kickoff meeting Beams-doc Current Status of PD H- Transport and Injection The basis of the current transport line and injection scheme started with the design concepts and transport/ collimation/ injection issues discussed in the 2004 H- Beam Transport Workshop at FNAL ! –Control of stripping losses in transport line (coll., bb, lorentz) –Uncontrolled losses during injection –Foil issues (material, thickness, support, efficiency, etc) Started addressing some of the Recommendations of the PD Directors Review last April –Re-examine the injection region layout, incorporating information on existing magnet dimensions, both interior and exterior, and verify a feasible design. –Evaluate collimation inefficiency and estimate the fractional “foil misses” that result. –Design the injection region and injection dump transport line to accommodate beam particles that miss the foil –Do a preliminary design and cost estimate for a beam tube liner –Conduct a one-day mini-review of the transfer line and MI injection. –Revisit the injection dump power handling capability… –Further optimize Linac pulse length (cost and performance)

03/30/06 DEJBNL&FNAL PD Collaboration kickoff meeting Beams-doc Current Status of PD H- Transport Transport line –Focus on creating a sound optical design that minimizes civil construction conflicts – very close to end foot-print –Basic layout remains a 60 degree FODO lattice with two bend sections and matching section to the Linac and Ring. –Arcs are now achromatic: Field in arc dipoles 550G -> (fractional loss/m ~7.5E-9 -> at 1.54E14/1.5s -> 7.5E5 /m/s –Each Arc contains 30 dipoles Re-use old MR B2 dipoles (2”x4”aperture) 57 run DC on a single bus (air cooled) first first three ramp to select beam MI/dump –Entire line contains 51 quads (new 1.3 m, 3” (?) pole tip) 18 on QF and 19 on QD buss at +/ kG/m 3 + last linac quad individual max gradient 13 kG/m (current linac quad at ~31 kG/m 11 individual quads to match from arc and 6 (8) to match into MI ( RR) –At  max =75m 3  ~4.2 mm max Dispersion 6m -> 6 mm offset for dp/p of.001

03/30/06 DEJBNL&FNAL PD Collaboration kickoff meeting Beams-doc Transport line (continued) –The basic betatron and momentum collimation scheme has been retained (~similar to SNS) 3 foil/ in-line absorber combinations in each plane for betatron collimation Configuration: Foil in front of quad strips halo– absorber next half cell intercepts halo –  (foil) 75m  (absorber) 30m –~5 mm separation at absorber (need additional tracking verification) Provision for two momentum collimation stations –  (foil) 75m  (absorber) 50m –~3-4mm separation at absorber (need additional tracking verification) Current thought to use only 1 momentum collimation station Need simulation which includes stripping and tracking both species of particles Current Status of PD H- Transport

03/30/06 DEJBNL&FNAL PD Collaboration kickoff meeting Beams-doc  ’tron momentum MI match 8 Gev H- Transport to Main Injector De-buncher

03/30/06 DEJBNL&FNAL PD Collaboration kickoff meeting Beams-doc Beam Collimation Results generated by A.Drozhdin for previous beam line version Dec Dump 8 Dump 7 Dump 6 Dump 5 Dump 4 Dump 3 Dump2 Dump 1 Left side figures: 3-sigma core of the beam (green) and beam without collimation (red). Right side figures: beam population after collimation at every 60 degree (red) and intercepted halo at the beam dumps (green).

03/30/06 DEJBNL&FNAL PD Collaboration kickoff meeting Beams-doc MI H- Injection –Main Injector lattice for H- injection was re-designed Converted FODO lattice (15 m space between quads) to symmetric straight with a 32 m space between doublets to be used for injection –Requires six new power supplies for local matching and adding trim coil circuits to IQC and IQD quads globally Removed quad from injection straight (increase aperture, decouple inj. from tune quad bus) Utilize wide aperture DC dipole for merging H- with protons (part of the chicane) Utilize strong 1.2T short dipole after foil to strip excited states of H0 up to n=-2 and strip any H- miss Place foil in rising field gradient of third magnet Last chicane magnet place the injected protons on closed orbit and (with secondary foil) send H0->H+ to injection dump Use horizontal painting (in MI) and vertical injection angle to produce “uncorrelated” beam distribution (A. Drozhdin) Injection straight solid design – intend further optimization

03/30/06 DEJBNL&FNAL PD Collaboration kickoff meeting Beams-doc H-H- H+H+ H 0, H - start end closed orbit (DC bumps) foil inj absorber 1.2T 558G Painting trims Current MI10 MI10 for PD H - injection 32 m H- MI-10 Configuration for 8 Gev H- Injection Generated toy MI lattice (without sextupoles or errors) to match existing MI lattice Beta functions tunable in range of m (both planes) used existingMI quads Transfer PD optics to real MI lattice Foil in front on 1.2T field

03/30/06 DEJBNL&FNAL PD Collaboration kickoff meeting Beams-doc Painting scheme 160 mm 110 mm MI CL 0 mm DC Bump 110 mm Start Paint 160 mm End Paint mm 16.7 mm 30.3 mm 13.6 mm 3.03 mm 12.8 mm 36.4 mm Position of beam at start of painting (green), end of painting (red), and circulating beam (magenta). The optimum waveform: JHF Accelerator design study report. KEK Implemented by A. Drozhdin  x = 40m  x = 0  y = 20m  y = 0

03/30/06 DEJBNL&FNAL PD Collaboration kickoff meeting Beams-doc First Results for 270 turn Injection Program STRUCT results (A. Drozhdin, et. al) First result (preliminary) for 270 inj. tracking with new insert Turn Left x-x’ / Right y-y’ X 10mm/div Y 5 mm/div 270,000 particles Track 27,000 particles Lost 56 particles (7E-6 watts) -> 26kW in 3km Foil hits/particle ~25 Need to double check parameters Clearly Needs Optimization

03/30/06 DEJBNL&FNAL PD Collaboration kickoff meeting Beams-doc Lifetime of Stark states of H0 Data for lifetime of Stark states of 8 Gev H0 as a function of magnetic field corresponding to its rest frame electric field see by the atom. Calculations were done by W.Chou, Alexandr Drozhdin and presented at the 2004 Workshop Path length for 1E-11 sec is approx 3 mm in lab frame For 2” fringe field -> 23.6T/m gradient ->  ~7  r Field seen by H0* H- missed foil

03/30/06 DEJBNL&FNAL PD Collaboration kickoff meeting Beams-doc Lorentz Stripping Using expression from L.Scherk for rest frame lifetime of H- in applied magnetic field. Calculate lab frame lifetime (  ) and stripping length (  c  ) at fields in Chicane Fields encountered after foil the stripping length is on the order of mm or less and the lifetime (lab frame) on the order of E-11. Calculations Extrapolated from data 200 and 800 Mev.44 s

03/30/06 DEJBNL&FNAL PD Collaboration kickoff meeting Beams-doc Outstanding Issues Linac dump transport line (straight forward …) –Must not preclude accumulator for muon production Beam absorbers used for injection, betatron coll., momentum coll., linac dump, and MI need to be designed. -> design started AD Phys Longitudinal Dynamics –Energy/phase jitter, excitation errors – specs & simulation –Injection modeling with 325 Mhz micro bunch struct, impedances, instabilities, longitudinal painting (initial model done P. Yoon) –Energy spreader, de-buncher (requirements / location / design) Optimization of Injection layout  Understand foil heating issues  Foil design, support, material, thickness  For multiple foils, optimize foil separation and thickness –Minimization of foil hits by circulating protons –Utilize ORBIT/STRUCT/other to investigate optimizing of beam size on target and painting schemes Magnetic Design of transport and injection components (TD/AD) –Transport dipoles (existing), trim (MI design), Transport quads –preliminary design (Harding) –Separation dipoles for dump line (new design – preliminary (Harding) ) –Chicane dipoles (new design) –Injection kicker magnets

03/30/06 DEJBNL&FNAL PD Collaboration kickoff meeting Beams-doc End to End simulation –ASTRA/TRACK->ORBIT/STRUCT OTHER(?) –Multi-species tracking –Design parameters and with all errors Instrumentation Design –BPM, BLM, BCM (FNAL AD instrumentation) –Profile monitors (8 Gev) (laser wire/ multiwire, other?) Magnetic Field stripping at 8 GeV –measured up to 800 MeV extrapolated to 8 Gev Foil stripping efficiency –measured at 200 and 800 Mev scaled to 400 Mev and 8 Gev –600 mg/cm2 H0 projected yield at 0.5% Foil Heating Foil Lifetime Outstanding Issues II

03/30/06 DEJBNL&FNAL PD Collaboration kickoff meeting Beams-doc Potential Areas of BNL Participation in PD R&D Talking Points of initial FNAL/BNL meeting: –Provide an independent review of current conceptual transport and injection design –Collaborate in the Optimization of the Injection Layout including, but not limited to  Understand foil heating issues  Foil design, support, material, thickness  For multiple foils, optimize foil separation and thickness Investigate and develop a plan for the utilization of AGS for H- stripping issues Design and fabricate laser profile monitor for use with H- at energies below about 100 MeV. Other …