State Project Office Shiksha Sankul, Mayur Vihar, Sahstradhara Road, Dehradun.

Slides:



Advertisements
Similar presentations
1 SAFETY ORGANISATION. 2 Safety Organisation 3 Safety Organisation - Regulator.
Advertisements

External Reviews of Quality Assurance Agencies Experiences from the ENQA membership reviews Séamus Puirséil, Higher Education and Training Awards Council,
Project Summary Project Objectives Indicative Activities Outputs Beneficiaries Risk and assumptions Project Management Structure.
State Bank of Pakistan Various Departments
Role of NABARD in Rural Banking
Delivering SCIENCE AND TECHNOLOGY Through the National Science and Technology Consortium.
Quality Management Training Quality circles Bench Mark Kaizen.
Outline of Feasibility Study on Safer Conventional Housing in Developing Countries in 2005/06 and Proposal of R&D activities Workshop on Safer Conventional.
State Project Office, SSA, Uttarakhand, Dehradun.
OVERVIEW OF CIVIL WORKS IN ODISHA STATE BY C. GANAPATHY, SENIOR CONSULTANT, TSG.
FRANCHISEFRANCHISE PROPOSALPROPOSAL. IDPSSIDPSS KEY TO SUCCESS DREAM- TO ESTABLISH SCHOOL OF IDPS REPUTE. THOUGHT- TO TIE UP BUSINESS OPPURTUNITY WITH.
SARVA SHIKSHA ABHIYAN, BIHAR In Bihar, we are adhering to the codal provisions of Earth Quake Resistant Building. Prof. P.K. Das, National Consultant,
Service and Training. Our engineers and Instructors are all highly qualified and possess many years of experience with top manufacturers. Surveys Studies.
Campus Staffing Changes Positions to be deleted from CNA/CIP  Title I, Title II, SCE  Academic Deans (211)  Administrative Assistants.
Developing Guiding Principles for ICT in Education Policy
Reconstruction of Earthquake Damaged Rural Houses (REDRH)
An Overview of the Accreditation Process and Important Policies Megan Scanlan, Director of Accreditation, Stacy Wright, Site Visit.
Sarva Shiksha Abhiyan, Rajasthan.
By Satish Girotra Implementation of school infrastructure.
30 th August 2006 ALTERNATIVE OPTIONS FOR SOLAR SERVICE DELIVERY Saliya J. Ranasinghe.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Purpose of the Standards
ISO 9000 Certification ISO 9001 and ISO
LS Engineering Associates Corporation LS Engineering Associates Corporation CORPORATE PORFILE Engineering Services ■ Bridge Inspection ■ Bridge Design.
THIRD PARTY QUALITY INSPECTION OF SCHOOL BUILDINGS Dr. A. K. Mittal, Project Leader Central Building Research Institute ROORKEE.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
REVIEW AND QUALITY CONTROL
B ALTIMORE C ITY P UBLIC S CHOOLS District Research Partnerships Jennifer K. Bell-Ellwanger Chief Accountability Officer Office of Achievement and Accountability.
The evaluation of research units at HCERES
1 st Phase Model Department Institute of Food Sciences & Technology.
Civil Works, SSA, Assam Every School Beautiful Every Child In School Every Child Learning A xom Sarba Siksha Abhijan Mission.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
Implementation of FM Action Plan and Monthly Expenditure Plan Group-I M.P,Jharkand,U.P.,Gujarat, Chattisgarh,Nagaland,Chandigarh, Daman&Diu Shri Ved Praksh.
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
Current Design and Implementation Challenges of Road Projects on the Coastland Ron Rahaman Chief Roads and Bridges Officer Ministry of Public Works Works.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
1.  Channelize the Credit Linked Subsidy to the Primary Lending Institutions  Scheduled Commercial Banks  Housing Finance Companies  Regional Rural.
Inter-Ministerial and Inter-Agency Coordination in Post-Earthquake Reconstruction Cooperation Among Government Departments and Line Agencies N. Vinod Chandra.
Video Conference am noon.
PARAMETERS, STRENGTH & ISSUES FOR LOW PERFORMING STATE BIHAR AS ON
1 Kingsley Karunaratne, Department of Accounting, University of Sri Jayewardenepura, Colombo - Sri Lanka Practice Management.
Mid Day Meal Scheme AWP&B Arunachal Pradesh.
Towards Green ICT strategies: Government paving the way - Ghana Environmental Protection Agency and VODAFONE (Ghana) Collaboration At: Fifth ITU Symposium.
UNECE – SIDA “ SOUTH EAST EUROPE REGULATORY PROJECT” FIRST MEETING OF REGULATORS FROM SOUTH EAST EUROPEAN COUNTRIES PRESENTATIONFROM THE REPUBLIC OF MACEDONIA.
Dr. S.R.S. RANA Dr. V.S. PAL Dr. D.S. BIST (S.L.O.) (STATE COORDINATOR) (EPIDEMIOLOGIST) Prepared By.
Improvement Planning Mischele McManus Infant/Toddler and Family Services Office of Early Childhood Education and Family Services July 20, 2007
VALUE FOR MONEY AUDIT PRESENTATION ON MANAGEMENT OF DAM CONSTRUCTION AND WATER SUPPLY PROJECTS BY ZIMBABWE NATIONAL WATER AUTHORITY (ZINWA) PRESENTED.
1 Mid Day Meal Scheme Ministry of HRD Government of India MDM-PAB Meeting – Uttarakhand On
National Radioactive Waste Management Agency Bill 25 MARCH 2008.
Presentation for National Workshop/ Review Meeting of State Project Engineers/ Civil Works Coordinators Puri, Orissa Date : 16 & 17 November, 2011.
IAEA International Atomic Energy Agency Arusha, Tanzania Uganda Dr. Akisophel Kisolo Project Counterpart 2 – 5 December 2013 RAF9038 Final Coordination.
Sarva Shiksha Abhiyan SSA, UT Mission Authority Andaman & Nicobar Islands loZ f’k{kk vfHk;ku CIVIL WORKS.
Agricultural Careers Agronomist By: Dr. Frank Flanders and Trisha Rae Stephens Georgia Agricultural Education Curriculum Office Georgia Department of Education.
Inter-American Development Bank BIMILACI 2007 QUALITY PROCUREMENT Third Party Review May 2007 Project Procurement Division.
Facilities and Planning Department March 30, 2009 Katy ISD Katy, Texas.
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
World Bank Procurement Procedures Module - Technical Specifications for RTDAS Anish ….. Hydro-Informatics Expert The World Bank.
Community Action for Health Uttarakhand Health & Family Welfare Society, Danda Lankhor, Shastradhara Road Dehradun Uttarakhand.
Framework for Risk Assessment Management and Evaluation - FRAME
Ministry of Water Resources, River Development and Ganga Rejuvenation
Ministry of HRD, Govt. of India
Third Party Quality Inspection of School Buildings
National Watershed Management Project – “Neeranchal”
Designed & developed by
Safety and Security- From Assessment to Implementation
Mid Day Meal Scheme Annual Work Plan & Budget UTTARAKHAND
Emulsion Task Force Meeting
Introduction DEFINATION :-
Roles and Responsibilities
PAB MEETING UTTARAKHAND
Presentation transcript:

State Project Office Shiksha Sankul, Mayur Vihar, Sahstradhara Road, Dehradun

ZoneIV Tehri Dehradun Haridwar Nainital Champawat U.Singh Nagar Pauri Almora Zone V Chamoli Rudraprayag Bageshwar Pithoragarh Uttarkashi Pauri Almora SEISMIC ZONE

. Seismic Zone India and Uttarakhand

YearType of SchoolTotal Primary Upper primary Additional Class Rooms (PS & UPS) Primary Upper Primary Additional Class Rooms (PS & UPS) 900 Number of major Civil Works

School designs were prepared by C.B.R.I Roorkee. as per availability of land and sites. C.B.R.I took measures for earth quake resistance designs. Training regarding construction work was /is being imparted to… 1-Three days training to D.P.Os at CBRI campus with illustrative demo. in labs & lab areas. 2-Five days training to A.Es & J.Es by experts from G.B.Pant University of Agriculture & Technology Pantnagar. 3-One day training to the concerned VEC members. 4-On side support to the masons. Training & Designs

Implementing Agency &Supervisory Staff.  All type of construction works are undertaken by VEC.  For technical support, one Junior Engineer is deputed at each block and one Assistant Engineer for district.At state level a team of engineers comprising one Executive Engineer with two Junior Engineers are to monitor civil works.  Besides this, a civil work co-ordinator is appointed at state level for better co-ordination among the stake- holders.

 G.O.I guidelines  To maintain quality of civil works.  To assure the standard quality of construction material and to obtain independent assessment of the technical quality of civil works.  To motivate and train VECs.  To highlight the problem area and to suggest step/solutions to achieve overall quality assurance.  Periodical supervision of physical progress for completion of works in schedule time frame. Third Party Evaluation of Civil Works

For this job MoU was singed with C.B.R.I because of… 1- National wide reputed institution. 2- Easy to access. 3- World class laboratory. 4- Expertise in the field of technical evaluation and quality assurance of building construction. 5- Vested with the responsibility of generating, cultivating and promoting building science and technology in the service of the country. 6- Finding timely, appropriate and economical solutions to the problem of materials, efficiency, structural and foundation problems and disaster mitigation. Engaging C.B.R.I. for TPE

Budgetary Provision Total No. of 2119 Civil Works to be evaluated. Total amount to be paid to CBRI Rs lacs. Amount is released to CBRI on installment basis:- 1-Rupees Twenty Five lakhs + Service Tax. along with acceptance of this MoU. 2-Rupees Twenty Five lakhs + Service Tax after six month and submission of first interim report of schools inspected during the last six months 3-Rupees Twenty Five lakhs + Service Tax. after twelve months and submission of second interim report. 4-Rupees Eighteen lakhs & Fifty Thousands + Service Tax. after eighteen months and submission of final report. The final report will contain all inspections and interim reports.