Industry Comments to Commercial Space Transportation Reusable Launch Vehicle Operations & Maintenance Guidelines Presented to the COMSTAC RLV Working Group.

Slides:



Advertisements
Similar presentations
Boeing’s Perspective on FCF Risk Mitigation
Advertisements

Unit 252 Planning and monitoring work
Experimental Permits for Reusable Suborbital Rockets Guidelines Randy Repcheck May 25, 2005 Federal Aviation Administration.
RLV Working Group Presentation to the COMSTAC Michael S. Kelly 26 May 2005.
Chapter 10 Schedule Your Schedule. Copyright 2004 by Pearson Education, Inc. Identifying And Scheduling Tasks The schedule from the Software Development.
Federal Aviation Administration On-Orbit Debris Mitigation Methods for Upper Stages COMSTAC: Space Transportation Operations Working Group and Risk Management.
Federal Aviation Administration Commercial Space Transportation Human Space Flight Occupant Safety Telecon Telecon 7 – Medical Guidance for Crew & Spaceflight.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Controlling Hazardous Energy
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Page 0 COMSTAC RLV Task Force on Training RLV TASK FORCE ON TRAINING May 15, 2008 Maurice Kennedy.
Presented to: Instructors and Pilot Examiners By: The FAASTeam Date: October 1, 2008 Federal Aviation Administration FAASTeam CFI Workshop #1 Module #1,
CUI Statistical: Collaborative Efforts of Federal Statistical Agencies Eve Powell-Griner National Center for Health Statistics.
International Strategy FAA Office of Commercial Space Transportation
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
From Research Prototype to Production
Federal Aviation Administration 1 COE CST Research Road Mapping Workshop #2 August 16, 2011 Federal Aviation Administration Research Area 2: Space Transportation.
RLV Working Group Reusable Launch Vehicles Working Group Presentation to the COMSTAC 11 October 2007 Michael S. Kelly, Chairman.
NIST Special Publication Revision 1
Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level Concept of Operations for Commercial.
Chapter 3: Project Management Omar Meqdadi SE 2730 Lecture 3 Department of Computer Science and Software Engineering University of Wisconsin-Platteville.
Federal Aviation Administration Commercial Space Transportation Human Space Flight Occupant Safety Telecon Telecon 5 – Aborts and Abort Systems. December.
Federal Aviation Administration Federal Aviation Administration Presented to: COMSTAC By: Bretton Alexander, RLV Working Group Chair Date: May 21, 2009.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
Federal Aviation Administration Commercial Space Transportation Human Space Flight Occupant Safety Telecon Telecon 8 – Communications and Commanding Best.
Office of Commercial Space Transportation FAA/AST NASA Insurance Task Report Pam Underwood Technical Advisor Kennedy Space Center Operations Office May.
Federal Aviation Administration Commercial Space Transportation Human Space Flight Occupant Safety Telecon Telecon 6 – Fault Tolerance, Margin and Reliability.
Federal Aviation Administration May 10-11, 2012 AST / COMSTAC Issue Coordination COMSTAC Meetings Dr. George Nield Associate Administrator FAA Office of.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
Functional Check Flight Symposium Andre Tousignant C.I.M. Director Air Safety Investigation Office (ASIO) Bombardier Aerospace Vancouver Feb 8, 2011.
Assessment of Alternate Methodologies for Establishing Equivalent Satisfaction of the Ec Criterion for Launch Licensing Terry Hardy AST-300/Systems Engineering.
AIRTANKER BASE MANAGER (ATBM).
AST Research and Development Activities COMSTAC Launch Operations and Support Working Group Chuck Larsen October 24, 2006 Federal Aviation Administration.
1 COMSTAC RLV Working Group Meeting Report Presentation to the COMSTAC Michael S. Kelly Chairman 20 May 2004.
Presented to: COMSTAC RLV Working Group By: Ken Wong, Licensing and Safety Division Manager Date: May 15, 2008 Federal Aviation Administration Federal.
SVDM ConOps 18 May 2010 Federal Aviation Administration 0 0 Space Vehicle Debris Threat Management ConOps Presentation to COMSTAC Space Transportation.
Presented to: COMSTAC By: George Whitesides, RLV Working Group Chair Date: October 30, 2008 Federal Aviation Administration Federal Aviation Administration.
Space Transportation Operations Working Group (STOWG) Report to COMSTAC October 7, 2010 Debra Facktor Lepore Acting Chair.
Federal Aviation Administration Federal Aviation Administration Presented to: COMSTAC By: Jim Muncy on behalf of Jeff Greason, RLV Working Group Deputy.
Culture Clash: One More Attempt to Change the Lexicon Presentation to the RLV Working Group Michael S. Kelly.
03/11/021 Spaceport Vision Team Members. 03/11/022 Systems Definition Spaceport System Spaceport Stakeholder Needs High-Level Trade Study Performance.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Presented to: COMSTAC RLV Working Group By: Ken Wong, Licensing and Safety Division Deputy Manager Date: October 10, 2007 Federal Aviation Administration.
Streamlining NEPA for Reusable Launch Vehicles Federal Aviation Administration Associate Administrator for Commercial Space Transportation October 2004.
Commercial Space Transportation Research and Development Program COMSTAC RLV Working Group Chuck Larsen October 10, 2007 Federal Aviation Administration.
Federal Aviation Administration Federal Aviation Administration COMSTAC RLV Working Group May 20, 2009.
RLV Working Group Reusable Launch Vehicles Working Group Presentation to the COMSTAC 18 May 2007 Michael S. Kelly, Chairman.
Federal Aviation Administration 1 FAA AST Overview Presentation Federal Aviation Administration Overview of the Federal Aviation Administration.
SPACE Act of 2015 Dr. Sarah J. Nilsson, Esq. A 3 ir Conference January 2016.
RLV Reliability Analysis Guidelines Terry Hardy AST-300/Systems Engineering and Training Division October 26, 2004.
Reusable Launch Vehicle Working Group Commercial Space Transportation Advisory Committee Presented to COMSTAC Meeting George Whitesides, RLVWG Chairman.
Presented to: By: Date: Federal Aviation Administration Office of Commercial Space Transportation Human Spaceflight Guidelines Update COMSTAC, Systems.
Guide to the Identification of Safety-Critical Hardware Items for RLV Developers COMSTAC RLV Working Group Meeting Washington D.C. 25 May 2005.
State of Georgia Release Management Training
COMSTAC Systems Working Group Summary 10 October 2012.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
Federal Aviation Administration Federal Aviation Administration Presented to: COMSTAC By: Bretton Alexander, RLV Working Group Chair Date: May 11, 2011.
Federal Aviation Administration AST International Outreach Update and UN COPUOS Long Term Sustainability of Outer Space – Expert Group B (Debris) John.
Federal Aviation Administration Commercial Space Transportation Human Space Flight Occupant Safety Telecon Telecon #2 – FAA Oversight September 18th, 2012.
Space Operations and the National Airspace System 9 October 2012 Federal Aviation Administration 0 0 Overview of Space Operations and the National Airspace.
Federal Aviation Administration Federal Aviation Administration Presented to: COMSTAC By: Debra Facktor Lepore, Acting Chair, Space Transportation Operations.
FAA AST Office of Commercial Space Transportation Federal Aviation Administration Preliminary Approach to Commercial Human Spaceflight Presentation to.
Abdulla Al Yammahi Specialist, Radiation Safety Inspection
Air Carrier Continuing Analysis and Surveillance System (CASS)
1 Million+ UAS Registrations
Managing Project Risks and Opportunities
Software Reviews.
Presentation transcript:

Industry Comments to Commercial Space Transportation Reusable Launch Vehicle Operations & Maintenance Guidelines Presented to the COMSTAC RLV Working Group by Chuck Larsen Federal Aviation Administration Associate Administrator for Commercial Space Transportation October 26, 2004

RLV O&M 2 General Industry Comments, Concerns Industry is concerned that these Guidelines will become regulations soon Industry believes that it is premature for these Guidelines to be developed AST plans to study Industry’s comments in our RLV O&M Subgroups while we and Industry together gain experience with RLV Operations AST plans continued consultations with the COMSTAC RLV WG during the development of the Guidelines

RLV Operations & Maintenance Preliminary Guidelines RLV Maintenance

RLV O&M 4 Maintenance Preliminary Guidelines 1. Maintenance Program Plan 2. Maintenance Tracking System 3. Maintenance Requirements Flow Down to Sub-tiers 4. Configuration Management System 5. Inspection Schedule

RLV O&M 5 Industry Comments to Maintenance Change the “shall” and “must” imperatives to “should” A storage plan for spare parts cannot be developed before some operational experience is gained Cannot accurately specify PM, staffing levels, skill levels until operational experience is gained Safety through accountability is a myth Don’t recommend a tool control/calibration program unless special tools required Don’t require software ID, tracking and reporting for vehicles that don’t use software Inappropriate to require maintainability requirements be imposed on each subcontractor until industry matures CMS should be a recommendation not a requirement Inspection schedule meet operational needs while ensuring public safety and updated to reflect operational history

RLV Operations & Maintenance Preliminary Guidelines RLV Support Personnel

RLV O&M 7 VMC – Vehicle Mission Coordinator RAMT(s) – RLV/Aerospace Maintenance Technician(s) RAMI(s) - RLV/ Aerospace Maintenance Inspector(s) MSO - Mission Safety Organization Note: One person may perform more than one task/responsibility concurrently Hypothetical proposed tasks/responsibilities used to fulfill the functions of an RLV operations and maintenance program: RLV Support Personnel

RLV O&M 8 Preliminary Guidelines 1.Reviewed the RLV Working Group comments to the draft Guidelines and as a result, 1.Combined the ATC-O and the VOD task/responsibilities into the VMC 2.Removed the LSO task/responsibilities from the RLV O&M Guidelines 3.Replaced the RS task/responsibilities with the MSO 2. Developed Training Guidelines 3. Developed Qualification Guidelines RLV Support Personnel

RLV O&M 9 Industry Comments to Support Personnel General Change the “shall” and “must” imperatives to “should” Change “required” to “recommended” Change “subject to” to “available for” Change “safety inspection” to “study”

RLV O&M 10 Industry Comments to Support Personnel Specific to VMC VMC as Mission Planner acceptable in principle FAA does not have established procedures for defining and filing mission profiles No ATC collaboration is necessary if in DoD restricted airspace LSO coordination is necessary but not clear it should be VMC responsibility Knowledge of ATC rules/regulations and of NAS should be a recommendation not a requirement VMC should not plan a mission the vehicle can’t fly or violates a regulation Do not need to collaborate with LSO on mission planning Do not need to coordinate with LSO and ATC to meet mission milestone dates and activities

RLV O&M 11 Industry Comments to Support Personnel Specific to RAMT It is too early to tell whether the proposed ratings matrix makes sense If it does, industry will develop the matrix and develop appropriate technician standards No consultation with XCOR on its experience operating the EZ-Rocket Specific to RAMI It is to early to define the positions, skills, responsibilities, qualifications for inspectors

RLV O&M 12 Industry Comments to Support Personnel Specific to MSO Completely unsatisfactory and absolutely unacceptable Don’t dilute the authority of the Safety Official with some nebulous MSO Safety Official does not need or want the support of an MSO Can be more than one hold decision as every moment of pre-flight is both a potential hold and a potential abort Only one person is necessary to activate the Flight Safety System All subject knowledge, task knowledge, and task performance described are of the Safety Official XCOR’s safety organization is XCOR Aerospace

RLV Operations & Maintenance Preliminary Guidelines RLV Operations

RLV O&M 14 Operations Preliminary Guidelines 1.Draft Guidelines covered flight safety system, communications and thermal protection safety-critical systems. 2.Additional operations guidelines developed for these and other safety-critical systems, including electrical power and structures, systems engineering and propulsion.

RLV O&M 15 Industry Comments to Operations General - Change the “shall” imperatives to “should” Specific to SYS-1 Rephrase to “The RLV operator should consider using functional redundancy for safety-critical systems, and where employed, the RLV operator is encouraged to make available to AST his processes and procedures for switching from primary to secondary systems” Specific to FSS-1 Rephrase to “RLV Operator should operate the vehicle such that its risk to public safety is minimized on the ground during any attempted landing, including abort and contingency landings”

RLV O&M 16 Industry Comments to Operations Specific to FSS-2 Rephrase to “The RLV operator’s ability to control the instantaneous impact point (IIP) should be extremely reliable unless the IIP cannot reach a substantially populated area” Specific to COMM-1 Rephrase to “The RLV operator is encouraged to transmit safety- critical data from the RLV to the ground in real-time during launch and reentry, when practical. The RLV operator is encouraged to record and store safety-critical data for post-flight analysis” Specific to COMM-2 Rephrase to “The RLV operator should ensure the continuous recording of safety-critical data during licensed operations. The data recording should not depend on the vehicle landing safely to retrieve the data”

RLV O&M 17 Industry Comments to Operations Specific to EPS-2 Rephrase to “The RLV operator should ensure that stored power reserves are sufficient to support normal vehicle operations during any credible flight scenario, including nominal flight, contingency abort, and emergency abort” Specific to STR-1 Rephrase to “With the exception of test flights, the RLV operator should make every effort to ensure that the vehicle is operated within its design parameters, including safety margins. In an emergency, the RLV operator may waive this guideline in the interest of public safety” Specific to PROP-1 Rephrase to “The RLV operator should operate the vehicle such that the vehicle’s safety-critical propulsion parameters, if any, are maintained within acceptable limits”

RLV O&M 18 Commercial RLV Operations and Maintenance Activities FAA/AST RLV O&M Sub-groups Drafted Preliminary Guidelines – 10/03 to 5/04 RLV O&M Team Briefed AST 2 on Draft Preliminary G/L - 06/04 RLV O&M Team Briefed AST-1 on Draft Preliminary G/L - 07/04 Transmitted RLV O&M Preliminary G/L to COMSTAC RLV WG Chair - 07/09/04 Received RTI RLV O&M Guideline Inputs and Technical Evaluation Report (draft): Maintenance – 08/04 Received COMSTAC RLV WG consensus comments to RLV O&M Preliminary Guidelines 09/23/04 Received RTI RLV O&M Guideline Inputs and Technical Evaluation Report (draft): Training – 10/04