Are the magnetic, mechanical and electrical requirements for the tagger magnet adequately defined? – Findings/Comments Spectrometer resolution requirements.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
Assignment Six Risk Control and Premium Auditing.
Chapter 6 Developing Muscular Fitness
Recent Changes to HDR Policy and Procedures Felicity Roddick Associate Dean Research and Innovation.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
Process of Making Multimedia
Software Development Problems Range of Intervention Theory Prevention, Treatment and Maintenance Planning, Development and Use Cost of Intervention.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
Tagging spectrometer and photon beamline Review January 23-24, Response to Questions Bremsstrahlung Tagging Spectrometer and Photon Beam Review.
State Transportation Agency Design-Build Projects Pre-Construction Process Presented By Iqbal Ahmed P.E Friday May 7, 2004.
 INTRODUCTION  COMPANY PROFILE  RECRUITMENT - MEANING AND DEFINATION - RECRUITMENT PROCESS  SELECTION - MEANING AND DEFINITION - SELECTION PROCESS.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
Acquisitions, a Publisher’s Perspective Craig Duncan Development Manager External Development Studio Building the partnership between.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Press the F5 key to continue Project Manager is a web based Project Management Tool. All your work is done and information stored on the internet cloud.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Engineering Petroleum Services Efficiency – Professionalism – Success.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Michael deLamare Requirements Management Program Functions R-9.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
Chapter 3 Dr. Bahaa Al-Sheikh & Eng. Mohammed Al-Sumady Intoduction to Engineering Introduction to Engineering Design 1.
Page 1 BaBar IFR Mechanical, Schedule Cost Review Outbriefing (1) Excellent job on preparing and presenting review Overall, the Committee feels that the.
2.2 Acquisition Methodology. “Acquisition methodology” – the processes employed and the means used to solicit, request, or invite offers that will normally.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Policies and procedures for developing acquisition plans; determining whether to use commercial or Government resources; whether it is more economical.
Procurement Authority Representative Roles and Responsibilities Amanda Price, Program Development Coordinator, Planning and Programming, Transportation.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Chapter 3 Marketing Decision Making and Case Analysis.
Aug. 22, 2007 CF7S Americas EDR Kick-Off A&E Selection the Fermi Process Tom Lackowski.
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Abrasion Testing of Critical Components of Hydrokinetic Devices Monty Worthington.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
TESTING THE NEW SYSTEM Various Approaches to Testing.
WELCOM TO EGIQC. EGIQC Engineering Group For Inspection & Quality Control.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
RMS Update to TAC November 1, RMS Activity Summary RMGRR057, Competitive Metering Working Group Name Change (VOTE) Update on RMS Working Group and.
Linda Bagby - SBN Program Electrical Coordinator ICARUS Electronics Meeting 27 January 2016 SBN Program Operational Readiness Clearance.
Linda Bagby - SBN Program Electrical Coordinator T600 Installation 8 February 2016 SBN Program Operational Readiness Clearance.
WEEK 6 Introduction to Project Management. Wk 6 Agenda Verify Hybrid Wk 5 Review Wk 5 ◦ Compressing the Schedule ◦ Risk Identification Techniques ◦ Project.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
Overview of FESHCom Subcommittees Don Cossairt, Radiation Protection Manager, ESH&Q Section October 1, 2013.
Cryomodule Safety Approvals Jay Theilacker LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
Community Infrastructure Levy Project Planning and Infrastructure Evidence July 2014.
 It is critical to realize that this is a beginning relationship. The partner must ensure that they deliver the final product at a competitive cost and.
Director’s Progress Review Closeout Meeting
SUBRECEPIENTS POST-AWARD PROCEDURES
2K Cold Box PDR Introduction
Systems Analysis and Design in a Changing World, 4th Edition
Flooding Walkdown Guidance
2K CB FDR Overview:  Agenda, Charge, Review Process
LCLS Linac Technical Design Review Charge
Director’s Progress Review Closeout Meeting
Electrical Energy & Capacitance Pgs
X-Ray Endstations Update
Extraction Michael Bevins May 17, 2007
Electric Potential Energy
Accelerator NCFE Liaison Officer
East Hall under construction
Presentation transcript:

Are the magnetic, mechanical and electrical requirements for the tagger magnet adequately defined? – Findings/Comments Spectrometer resolution requirements are well stated Global field uniformity specification is ambiguous and potentially in error Magnetic field specifications are incomplete Magnetic, Mechanical and Electrical requirements are stated, but not justified…rational behind them is unclear – Recommendations Conduct a full resolution error analysis Use these results to improve the magnetic field specifications Use improved magnetic field specifications to update mechanical requirements Consider spectrometer calibration technique to verify performance

Is the reference design adequately defined at this point in time to address all requirements? – Findings/Comments The design has addressed the requirements as stated The design seems to have adequately anticipated a variety of problems – Recommendations Update as needed after completing the recommendations from Charge #1

Is the reference design adequately developed to justify completing the design in-house or should the final design be sub-contracted to an external source? – Findings/Comments The reference design is well advanced and adequately developed to justify completing the design in-house – Recommendations Complete the design in-house

Is the procurement schedule and plan reasonable? Is it reasonable to assume that the complete package can be sub-contracted to one company? Should the procurements be broken up? – Findings/Comments Plans for Design-and-build as well as Build-to-print were presented Procurement schedules and plans are reasonable Concurrent design and fabrication appear to be a way to gain float in the schedule and helps with resource leveling There are companies that have the capabilities to do the complete scope (design and build) Engineering resources for contract award and management appear low – Recommendations The costs presented need to be updated to reflect the current market condition and design completeness Recommend multiple build-to-print procurements

Have ES&H considerations been adequately incorporated into the in-hall installation plans and the design at their present stage? – Findings/Comments ES&H considerations have been adequately addressed to the design level at their present stage Pressure safety for the vacuum chamber design has been thoroughly addressed by using ASME BPV Installation plans at the current design level have been done with prudence regarding ES&H guidance Recent addition of an experienced hall coordinator will greatly enhance the work planning and scheduling – Recommendations Continue with the development of the procedures, lift plans, pertinent OSPs and TOSPs, etc.