CLEX TBM T0 Cooling system 23.04.2014 Progress Report 1 V. Soldatov, A. Vamvakas, BE-RF 23.04.2014.

Slides:



Advertisements
Similar presentations
CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.
Advertisements

Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Two Beam Module Thermo-mechanical tests Elena Daskalaki Alex Vamvakas Athanasios Zelios.
LCWS12, 25/10/ CLIC two-beam module development Status and future plans G. Riddone Outlook Short introduction CLIC Module Validation program Future.
Module 2: Hardware and Terminology
Influence of the Gravity, Vacuum and RF on CLIC Module T0 Behavior R. Raatikainen.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
1 ACTIONS: Ashley French TASK STATUSCOMMENTS 1. Contact Berthet-SergeFuture 12/11/10 2. Contact Serge Mothot & Said Atieh (CERN Workshop) Future 12/11/10.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
Status of: CLIC Two-Beam Module Magnets R&D and Procurement 1 Michele Modena, CERN TE-MSC IWLC10, WG8, 21October 2010.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
1 Updates on thermal tests Updates on thermal tests F. Rossi September 5, 2012.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
MERIT Hg System Final Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science &
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
«BE-RF-PM» CLIC prototype two-beam modules Thermal test planning G. Riddone, F. Rossi Introduction Thermal tests 1.Environment 2.Heating and.
CLIC two-beam modules TEST modules final schemes Dmitry Gudkov BE/RF CLIC Module Working Group.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
cern.ch International Workshop on Linear Colliders 2010 CLIC TWO-BEAM MODULE DESIGN & INTEGRATION 21-Oct-2010 WG 8 «TECHNICAL SYSTEMS»
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 July 17,
TBM Vacuum considerations Alex Vamvakas 15/07/2015.
«BE-RF-PM» CLIC prototype two-beam modules Thermal test planning Fabrizio Rossi.
CLIC module Experimental program for module array Module review, June 22 nd 2015Elena Daskalaki, BE-RF-MK.
TBTS Test Program & Schedule G. Riddone
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
Risto Nousiainen, CLIC workshop ” Technical Issues, Integration & Cost ” working group Progress on Study of Module Cooling Risto Nousiainen.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
CLEX TBM T0 Cooling system Design strategy 1 V. Soldatov, A. Vamvakas, BE-RF
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
BE – RF CLEX TBM Cooling System Software Perspective (DAQ and analysis) A. Zelios, BE - RF1 A. Zelios A. Vamvakas.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
ACT20X Ex isolator/ amplifier. Page 2 ACT20X (Ex isolators family) Overview - Connects to process equipment in Class/Div, or Zone 0 - Zone 2 areas - ACT20X.
IIFC Meeting February 24-25, 2015, RRCAT P. R. Hannurkar, Akhilesh Jain, M. R. Lad RF Systems Division 650 MHz RF Power 1.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
Status of the CLIC module R&D G. Riddone on behalf of the CLIC module WG (special contributions from A. Samoshkin, D. Gudkov, A. Solodko, N. Gazis)
Two-beam module layout
S A Griffiths CM42 June 2015 Electrical & Control.
Lesson 1 PLC BASICS. PLC Definition  Programmable Logic Controllers are industrial computers that control machine and other applications.  PLC have.
Feedback on transfer line sizing and flow calculations for UT
Solid State Amplifier Development at PSI
PLC Terminology and Application
Sub-system integration for the VBOX
Calorimeter Mu2e Development electronics Front-end Review
ProtoDUNE SP – Slow control Status
Thermal-Structural Finite Element Analysis of CLIC module T0#2
Thermal-Structural Finite Element Analysis of CLIC module T0#2
LAPP BPM Read-out Electronics
Performance of an Automated Water Based Cooling System for CBM MuCh
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
Have a chance to operate your own beam at CERN
Integration – preliminary ideas on routing and tests
List of changes and improvements for the next generation CLIC module
Installation plan for LAB modules
LCWS 2017 – 26th October C. Rossi
Thermal test (lab modules)
Presentation transcript:

CLEX TBM T0 Cooling system Progress Report 1 V. Soldatov, A. Vamvakas, BE-RF

Schematic layout for the CLEX two-beam module cooling CDR cooling layout (Fig ) 2 CLEX TBM phase 3.2 The two phases have different cooling requirements. Phase 3.1: One PETS, one SAS, idle PETS loads Phase 3.2: Two PETS, two SAS The extra cooling circuits for phase 3.2 can be implemented directly or at a later stage

by Michele Modena Power Dissipation 171 W ΔTwater 5 °C Nom. Water flow 1.8 l/min # of instances 2 Main components Super accelerating structure PETS (Ciemat) Drive Beam Quadrupole 3 CLIC CDRCLEX Power Dissipation 820 W5-30 W ΔTwater10 ˚C # of instances42 CLIC CDRCLEX Power Dissipation 110 W1.3-8 W ΔTwater10 ˚C # of instances22 RF Loads Power Dissipation150 W ΔTwaterDepends on circuit # of instances10

Cooling Scheme 4 At the 02/04/14 CLIC Module Working Group meeting it was decided to use the existing CTF3 cooling network. A mounting rack with all the necessary components will be installed in close proximity to the TBM and the water will be supplied by the CTF3 network.

Using CTF3 Cooling System 5 Top view Front view COLD WATER 30˚C TERMOSTAT Return (x10) Supply (x10) Distribution manifold is connected with the equipment by flexible standard Kevlar pipes (approved on 02/04/14 ) CLEX TBM T0 Module Supporting System Drive beam Girder Main beam Girder CLEX TBM MB Girder CLEX TBM DB Girder CTF3 Water Supply

Cooling rack 6 Independent distribution manifold Contains all control components Compact In close proximity to the TBM Flexible pipes to central CTF3 cooling system 800mm 600mm Return 230mm Spares To CTF3 From CTF3 Supply *Preliminary rack design Safety valve Control valve Flow meter Most components already tested in other facilities (CTF3, Xbox) Control valves yet to be defined (contacting suppliers under way)

Circuit 3 Circuit 1/2 Assembly Flowchart (link) The cooling network will consist of copper pipes (OD 8, 10 and 16mm) and standard connectors (Swagelok) Cooling Network of the Module 7  Example shows the cooling network for the CLEX T0 module with 2 SAS and 2 PETS

Circuits specifications 8 Circuit 1: Super-accelerating structure + (2x) AS_Load Circuit 2: PETS unit + WG + PETS_Load + RFN_Load + (2x)Idle_PETS_Load Circuit 3: (2x) DBQ Phase 3.1 Circuit 2: PETS unit + WG + PETS_Load + (2x)RFN_Load + (2x)Idle_PETS_Load Circuit 4: Super-accelerating structure #2 + (2x) AS_Load Phase 3.2 Circuitcomponents Nominal water flow (m3/h) flow meter control valve Pressure (bar)interface diameter 1SAS + Loads0.07yes 316 mm 2PETS + Loads0.04yes 316 mm 3DBQ0.20yes 31/2 in 4SAS + Loads0.07yes 316 mm Total flow: 0.38 m3/h *Sizing according to CLEX nominal values

DAQ & Control Control rack in shelter Standalone system Option for remote control from CTF3 control room PID control of component temperature Similar to LAB modules Temperature sensors: components (x16 surface contact sensors) Water (x11 pipe sensors) Ambient temperature (x1) Flow meters (x4) Pressure sensor (x1) Control Valves (x4) TBM DAQ & Control Cooling rack CTF3 Control Room sensors Control Valves Water Flow 9 Data acquisition system in LAB

Preliminary Inventory #DescriptionCatalog nameManufacturerPart numberQty 1control valvetype 2873, 2/2-way normally closed (NC) proportional valve, G1/4 (flow 0.1 m3/h)Burkert control valveType 2875, 2/2-way normally closed (NC) proportional valve, G3/8 (flow 0.25 m3/h)Burkert safety valvetype 438, Art-Nr , NPT 1/2" threadLesser flow meterSMC PF3W , G3/8 threadSMCPF3W pressure regulatortype TFU006, ver. III, Pressure regulator for water, n , G 1/2" threadBurkert Cooling rack components: Miscellaneous: Hand valves, elbows, fittings Pipes Cables Electronics rack PC DAQ components: 10 #DescriptionCatalog nameManufacturerPart numberQty 1ChassisNI CompactDAQ 8-Slot USB ChassisNational InstrumentsNI cDAQ ChassisNI CompactDAQ 4-Slot USB ChassisNational InstrumentsNI cDAQ I/O Module8-Ch, ±10 V, 500 kS/s, 12-Bit Analog Input Module, C SeriesNational InstrumentsNI I/O Module4-Channel, 100 kS/s, 16-Bit, 0 to 20 mA Analog Output ModuleNational InstrumentsNI I/O Module4-Channel, 100 Ω RTD, 24-Bit Analog Input ModuleNational InstrumentsNI valve controllerControl Electronics for Solenoid Control Valves, type 8605, DIN-railBurkert power supplyTSP-Series power supply, 24V, 360WTracopowerTSP 360–1241 6pressure sensorOEM pressure transmitter, CTE9010AQ4SensortechnicsCTE9010AQ41 7temperature sensorssurface temperature sensor SA2F-RTD A-40OmegaSA2F-RTD A temperature sensorsPipe probe temperature sensor, 1/4“NPT threadOmegaRTD-NPT-72-E11

Planning and Activities 11 Completion of the specification List of equipment Control requirements Procurement of market components Detailed design Cooling Rack Module Cooling Network Routing Control components Installation works in CTF2 and CTF3 Approval Electronics and Software Control terminal Monitoring and control software Next steps: procurement of market components detailed design & integration