Wyoming Enhanced Oil Recovery Institute Joint Producers Meeting CO 2 in Wyoming June 26, 2007 Casper, WY Brian Jeffries Executive Director Wyoming Pipeline.

Slides:



Advertisements
Similar presentations
July 07 Ted Brandt Chief Executive Officer Marathon Capital, LLC Consolidation in North American Wind Sector.
Advertisements

1 Update on Water Issues in Wyoming IPAMS Summer 2007 Meeting Vail, Colorado Brian Jeffries Executive Director Wyoming Pipeline Authority.
Symposium on Private Financing for African Power Infrastructure US Treasury Department Washington, DC October 13, 2008.
August Confidential 2 Agenda  Bison Project Overview  Powder River Basin Overview  Bison Construction Hurdles  Summary.
OHIO ENERGY POLICY PROGRESS & REVIEW UCEAO 6 th Annual Conference Securing Ohio’s Energy and Economic Future THE BEST OF TIMES, THE WORST OF TIMES: ADVANCED.
AN OVERVIEW OF PROJECT FINANCE IN PRIVATE-PUBLIC PARTNERSHIPS FINANCE 101 T ERRI S MALINSKY Managing Director B.C.
Pipeline options for Canadian crude oil to the US Gulf Coast Presentation to the Wyoming Pipeline Authority October 24, 2006 Casper, WY.
Aboutpipelines.com Managing Safety and the Environment PATRICK SMYTH, VP SAFETY & ENGINEERING 28 OCTOBER 2014.
Natural Gas 101 & Current Industry Issues Bruce McDowell American Gas Association May 2008 Copyright © 2008 American Gas Association. All rights reserved.
Alaska Industrial Development and Export Authority Investing in Alaskans Alaska Broadband Taskforce Presentation| August 2012.
WEDA Winter Conference January 11, Community Programs Funding FY 2010 WEPCF Direct Loan $7,148,000$1,820,000 Grant 2,429,000 97,000 Guaranteed.
Warmup Why does the dollar on the left have value, while the one on the right does not?
Natural Gas & Oil Infrastructure in the Rockies An Update JOINT MINERALS, BUSINESS AND ECONOMIC DEVELOPMENT COMMITTEE Casper, Wyoming May 25, 2006.
Why Natural Gas & Is It Available? Daniel Adamo Business Development Director.
Bryan Hassler, Executive Director Western Energy Institute Domestic Supply Perspectives October 23, 2003 Las Vegas, NV.
1Q13 Investment Results for the Management Committee,
North American Natural Gas Infrastructure Needs Donald F. Santa, Jr. President Interstate Natural Gas Association of America The Independent Petroleum.
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
KERN RIVER GAS TRANSMISSION COMPANY Wyoming Pipeline Authority Casper, Wyoming August 21, 2007 John Dushinske Vice President of Marketing & Regulatory.
 This chapter addresses the following: ◦ How does government control the amount of money in the economy? ◦ Which government agency is responsible for.
Business Portfolio Adding Value to Investors Luiz Fernando Rolla CFO October, 2008.
George Godding Director DMC Office of Market Oversight and Investigations Federal Energy Regulatory Commission USEA/USAID Energy Partnership Program Brasilia,
1 Chapter 13 - Stock Purchase stock = buy part of company Returns from dividends and capital appreciation –Dividends – distribution of profits –Neither.
1 How to Mitigate Risks When Doing Business in the United States May 20, 2009.
North American Power Group Western Mine-Mouth Coal-Fired Power Two Elk.
1 Cheyenne Tuscola Lebanon Clarington Meeker Wamsutter Opal “Rockies Express Pipeline”
R Southwest Gas Corporation February 16, 2001 Southwest Gas Corporation Update on Factors Affecting Gas Prices n Storage u Storage levels continue below.
Bridging Nigeria’s Infrastructure Gap By M. K. Ahmad Director General National Pension Commission – Nigeria 1 18 November, 2008.
> > > > Financing and Investing Through Securities Markets Chapter 18.
W w w. g l o b a l – m – r. c o m ©2010 Global Manager Research Sample Report Portfolio Analysis Report 1 On this sample Fixed Income only. Report may.
Wyoming Natural Gas Pipeline Authority “Moving Wyoming Gas to California” December 9, 2003 John R. Smith Director Regulatory and Governmental Affairs Mark.
May 22, 2012 How We Managed an Oil Boom Williston Basin Petroleum Conference Presented by Cindy DeLancey.
1 JOINT MINERALS, BUSINESS AND ECONOMIC DEVELOPMENT COMMITTEE December 5, 2005.
Rockies Alliance Pipeline Wyoming Pipeline Authority Meeting Casper, Wyoming October 21, 2008 Gaylen Haag.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective Leadership Wyoming Class of 2005 Gillette, WY October 21,
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective Wyoming Geological Association Conference Prepared: July 26,
Financing Urban Public Infrastructure
Wyoming Pipeline AuthorityWyoming Pipeline Authority Casper, Wyoming | May 15, 2012.
Statewide Water Needs and future estimated costs September 20, 2011.
Jason Henderson Vice President and Branch Executive Federal Reserve Bank of Kansas City – Omaha Branch June 16, 2009 The views.
The Role of Government in the United States Economy How does the United States government promote and regulate competition?
Russia as a key player on the world energy market Elena Telegina Director of the Institute of Geopolitics and Energy Security of Russia Member of the Board,
INFRASTRUCTURE FINANCING. What is Infrastructure? “Infrastructure is define as the physical framework of facilities through which goods and services are.
1 Legislative Session February 17, Proposed Legislative Changes Increase WPA bonding capacity from $1 billion to $3 billion Expand State Treasurer’s.
Wyoming Pipeline Authority October 28, 2003 Mark Quinlan Director Marketing. Mark Quinlan Director Marketing.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective.
Bryan Hassler, Executive Director Society of Petroleum Engineers January 21, 2004 Rock Springs, WY.
Financial Management Chapter 17. Define finance and explain the role of financial managers. Describe the components of a financial plan and the financial.
Credit Risk. Possibility of loss from the failure of loan or debt instrument repayments. Change in the repayment capacity of borrowers or debt instruments.
Natural Resources Infrastructure Needs Colorado Oil and Gas Association Denver, CO August 9, 2006.
Evolution of Funding Pattern NPPs in India V. C. Agarwal Director (Human Resource) Nuclear Power Corporation of India Limited.
Financial Management Chapter 17.
Natural Gas and Energy Reform Legislation Steve Crout Managing Director, Government Affairs American Gas Association.
Dr. Mohamed Riyazh Khan DoMS
Chapter 13-4 The Federal Reserve System. The Federal Reserve  A central bank is an institution that oversees and regulates the banking system and controls.
Rocky Mountain Production and Pipeline Capacity 2004 BLM National Fluid Minerals Conference June 24, 2004.
CAPP – GHG emissions Pipelines need to be constructed because they use significantly less energy to operate and have a lower carbon footprint than tanker.
NPC Study on Prudent Development of North American Oil and Gas Resources Resources and Supply Task Group - Framing Questions Oil & Gas Resources: What.
Entrega Gas Pipeline Project Wyoming Natural Gas Pipeline Authority - August 24, 2004.
Who owns the natural gas export capacity out of the Rockies? Brian Jeffries Executive Director Wyoming Pipeline Authority August 21, 2007.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
Preparation and Analysis of Project Report. What is a Project Report?  A Project Report is a detailed description of the Project  The Project Report.
Wyoming Community Development Authority Financing Affordable Housing in Wyoming Housing Trust Fund (HTF) Public Hearing June 9, 2016 State of Wyoming Citizen.
Houston, TX THINK BIG. WIN THE WORLD FM 1960 West Suite 500 Houston, TX
Mortgage Finance for Increased Access to Housing
Dana M Abdulbaqi, Saudi Aramco Carol Dahl, Colorado School of Mines
The Federal Reserve System
Pipelines on the Horizon
SBA’s Office of International Trade
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Presentation transcript:

Wyoming Enhanced Oil Recovery Institute Joint Producers Meeting CO 2 in Wyoming June 26, 2007 Casper, WY Brian Jeffries Executive Director Wyoming Pipeline Authority

2 What is the Wyoming Pipeline Authority? Board of Directors appointed by Governor Mission (i) to promote the infrastructure necessary to produce oil and gas assets of the state and (ii) to promote access to high value markets If it can move in a pipeline, its within our charter Bonding capability to $3 Billion Not a regulatory, enforcement, rate making or policy setting body

3 How do pipelines get built? Interstate gas pipeline model Pipeline companies don’t build on speculation Long term commitments from credit worthy shippers for 90%+ of capacity Sometimes market pull, sometimes supply push Multi-year lead time to design construct Up front engineering and environmental expense growing

4 Potential Terms in a CO2 Transportation Contract 10 – 30 year initial contract life Fixed Monthly Fee is based on units of contract capacity Fixed Monthly Fee is paid whether capacity used or not Usage Fees are quite low Credit worthiness of shipper is big issue

Generic Future Generation McMurry DKRW Madden 16” 12” 16” 20” 16” A (very) rough outline of a CO2 grid to serve Wyoming – roughly 480 miles of new line Existing Exxon/Anadarko System Exxon

6 Rate assumptions 480 Miles of 20” – 16” – 12” $52,000 - $57,000 per inch mile All compression borne by suppliers Debt/equity ratio 70/30 7%Equity Three years to place in service Bridge loan 10% 10 – 30 year contract horizons 540,000 Mcf per day of capacity

7 Rate matrix – 540,000 Mcf/d system Contract Term (Yrs) Levelized Rate per Mcf of capacity Annual fixed fees on a 50,000 Mcf/d contract Life of contract fixed fees on a 50,000 Mcf/d contract 10$0.44$8.0 MM$80 MM 15$0.37$6.8 MM$101 MM 20$0.34$6.2 MM$124 MM 30$0.31$5.7 MM$172 MM

8 Rate matrix – 360,000 Mcf/d system Contract Term (Yrs) Levelized Rate per Mcf of capacity Annual fixed fees on a 50,000 Mcf/d contract Life of contract fixed fees on a 50,000 Mcf/d contract 10$0.55$10.0 MM$100 MM 15$0.46$8.4 MM$126 MM 20$0.42$7.7 MM$153 MM 30$0.40$7.3 MM$219 MM

9 Alternative sources of funds State of Wyoming – Constitutional Issues Federal Government? EOR Producer coalitions? Utility Buyers of Generation Output? CO2 Producers?

10 What about crude export capacity? Capacity out of Wyoming constrained at present Driven by increased Canadian, Wyoming production Some expansions on the way Crude line expansions accomplished along same dynamic as natural gas Where needed crude gathering lines could be laid with CO2 lines

Brian Jeffries Executive Director Wyoming Pipeline Authority (303)