Mapping above ground planimetric features using LiDAR Dan Senner GIS AnalystRobert Chavez CAD Coordinator.

Slides:



Advertisements
Similar presentations
Obstruction Surveys and Airport Airspace Analysis
Advertisements

Scope Seismic Retrofit of Building Replacement of three, 40 MW Generating Units Replacement of all Mechanical and Electrical Systems Rehabilitation of.
Import facility In Revised Scheduled VI Format SAG INFOTECT PVT. LTD. Service begins here…
Onondaga County CSO Abatement Gray Project Update.
ODOT Design to Dozer Bentley OnSite V8 i Alvie Griffith.
Eric M. Wetzel Carollo Engineers, Inc. Bentley Be Inspired Awards November 13, 2012.
Life Dimensional 3D ™. Background t David Bailey, CEO (Founder of IOMEGA) t Robert Vashisth, CTO (CO-Founder of ISI) t Stan Coleby, V.P. of Engineering.
DC Inc. Dan Corbin, Inc. 28 River Ridge Lane Cedar Falls, IA Cell: (319) Fax: (319) Photogrammetric Consultant.
Early Effort Estimation of Business Data-processing Enhancements CS 689 November 30, 2000 By Kurt Detamore.
Geospatial Overview Goals Goals What is a Geospatial Database? What is a Geospatial Database? Onshore Order No. 1 Geospatial Requirements Onshore Order.
ESRM 250 & CFR 520: Introduction to GIS © Phil Hurvitz, KEEP THIS TEXT BOX this slide includes some ESRI fonts. when you save this presentation,
Laser Scanning Single Position Scans. Not every event requires moving the scanner to capture what you need. In some cases, a single scan will do the job.
Nunavut Water Board Public Meeting Water Licence Amendment Rankin Inlet 3AM-GRA-1015 January
Use of GIS Analysis in Historic Preservation Disaster Response.
Maps as Numbers Getting Started with GIS Chapter 3.
IURC Digital Mapping Update Electric Utilities Task Force April 6, 2004.
Maps as Numbers Lecture 3 Introduction to GISs Geography 176A Department of Geography, UCSB Summer 06, Session B.
GIS Tutorial 1 Lecture 6 Digitizing.
GIS Development: Step5 - DB Planning and Design Step6 - Database Construction Step7 - Pilot/Benchmark (Source: GIS AsiaPacific, June/July & August/September.
RECORDING WATER TABLE DYNAMICS T & D Project No. 1E11EM35 USDA FOREST SERVICE Technology & Development Center 444 East Bonita Avenue San Dimas, CA
SCC & Leica  Import total station survey, GPS, traverse, levelling and GIS data direct from all Leica instruments.  In built Grid Inquest for GPS reduction.
TRYPHINE DUDZAYI.  Surveying instrumentation has undergone a major transformation over the past years transit to the modern instruments.  The theodolite,
Utilities Drawing Project U N I V E R S I T Y OF K E N T U C K Y.
1 a tool for Telecom Networks Roll-Out and Inventory IMK Consulting Simple tools for complex needs.
Improving the Quality of Tax Statistics: Recent Innovations in Editing and Imputation Techniques at the Statistics of Income Division of the U.S. Internal.
Geographic Information Systems (GIS) Presented to the Douglas County Highway Department August 8, 2012.
Development of an ArcView GIS Coverage of Illinois Superfund Sites Mark Yacucci Center for Transportation and the Environment Illinois State Geological.
Developing Health Geographic Information Systems (HGIS) for Khorasan Province in Iran (Technical Report) S.H. Sanaei-Nejad, (MSc, PhD) Ferdowsi University.
CZ Point Cloud™CZ Point Cloud™ + 3D Laser Scanner = Success When Time Matters
Introduction to Interactive Media 02. The Interactive Media Development Process.
An Overview of 3S Technology (GIS/GPS/RS) with an Example of District Transport Master Plan (DTMP) By Binod Dhakal 12/20/2014Binod Dhakal1.
Affordable UAV Technology - GSAM Presentation May 2011
Morphum Environmental Ltd Environmental Engineers and Consultants
ND Department of Transportation GIS Tools and Applications ND GIS Users Conference October 2005 Brian Bieber Programmer/Analyst III Information Technology.
Proposal for Geodatabase on 5 Mile Dam Soccer Complex Daniel Cohen – Project Manager Samuel Boesch – Assistant Manager Mathew Riggan – GIS Consultant.
Hydro-enhancement of LiDAR Data to Support Floodplain Modeling 2011 ASFPM Annual Conference Louisville, Kentucky May 18, 2011 Mark W. Ellard, PE, CFM Associate,
Introduction to Interactive Media The Interactive Media Development Process.
GIS 1 GIS Lecture 6 Digitizing. GIS 2 Outline Digitizing Overview Digitizing Sources GIS Features Creating and Editing Shapefiles in ArcView Spatial Adjustments.
Getting on the Map: Underground Utility Location And Municipalities By: Michael L. Gill, PE, RLS.
[Milwaukee County Enterprise GIS Migration Project] presented by: Kevin White, GIS Supervisor – Milwaukee County Scott Stocking, Systems Analyst – GeoAnalytics.
SALEM PUBLIC SCHOOLS STUDENT TRANSPORTATION - UPDATE July 27,
1 Coordinator’s Report VGIN Advisory Board Dan Widner Coordinator, Virginia Geographic Information Network January 7,
Coal Pile Volume Calculation featuring the FARO Photon 120 3d laser scanner.
Document Management System for Construction Industry From Crystal Infosystems & Services.
Document Management System for Construction Industry From Infocrew Solutions Pvt Ltd.
TcpTUNNEL – Setting Out and Surveying for Tunnels TcpTUNNEL.
1 Selling Autodesk Map to an AutoCAD User Top reasons for AutoCAD ® users to crossgrade to Autodesk ® Map ® 3D 2006 Autodesk and Autodesk Map are registered.
Surveying for Architectural Engineers Introduction.
LIDAR Technology Everett Hinkley USDA Forest Service Geospatial Management Office Prepared for Congressman Allan Mollahan's Office.
Comparison of Inertial Profiler Measurements with Leveling and 3D Laser Scanning Abby Chin and Michael J. Olsen Oregon State University Road Profile Users.
3D Laser Scanning Eric Schmiedl. What does it do?
PlanningCollectionProcessingQuality ControlDeliverables Mobile LiDAR Best Practices.
Coordination of Right of Way on Design-Build Contracts By- Richard Bennett State Right of Way Director Virginia DOT.
Andrea Shuter, Dearborn County; Tom Krohn, The Sidwell Company.
TcpTunnel – Setting Out and Surveying for Tunnels TcpTunnel.
Daniel Cohen Matt Riggan Sam Boesch. Introduction  The five mile dam complex needs a geodatabase to keep up with modern technology when repairing features.
Torino, March 1998 ANCIT WORKSHOP Site investigation and output of utilities maps using GPR (Ground Penetrating Radar) Giovanni Ciochetto Renato.
Specifications in New Zealand Masterspec until 2013 Before online specifications we used some tools CBI to make specifications portable and portionable.
RELIABLE AND PRECISE 3D COPY’S OF BUILDINGS AND SITES Contacts: Egidijus Zilinskas Tel.: Precise digital 3D copy.
Crime Scene Sketches.
Introduction to Leica ForensicMap Pro
WV Office of Miners Health, Safety, and Training
The Benefit of Point Cloud Modeling Technology in the Generation and Computation of FEM Models BIM ENGINEERING U.S. LL P.
HP DesignJet Large Format Printers
REEF SUNSET UNIFIED SCHOOL DISTRICT
GIS-Based Subsurface Exploration System
Current Status and Next Steps
AN EMPHASIS ON SCAN TO BIM SERVICES OR POINT CLOUD MODELING FOR RETROFIT AND RENOVATION PROJECTS Point Cloud Modeling.
Final Design Authorization
Music Creation Create, Record, Produce.
Presentation transcript:

Mapping above ground planimetric features using LiDAR Dan Senner GIS AnalystRobert Chavez CAD Coordinator

Project Background Storm/Sanitary/Water piping conversion project completed Identified inaccuracies in District site plans/ campus map District GIS application PlantMan created 2

Jones Island Located in Milwaukee, WI Built in the early 1900’s Current site plan believed to be established by heads up digitization 3

4 GOAL: To create a survey grade site plan at Jones Island Uses: Update PlantMan Creation of Master CAD site drawings All future District contracts will utilize Master site plan Eliminate inconsistencies between GIS & CAD

Current Site Plan Inaccuracies 5

6 Missing Site in GIS CAD Site Plan

Current Site Plan Inaccuracies 7 Misplaced Sites in GIS CAD Site Plan

Current Site Plan Inaccuracies 8 Duplicate facility 282 on top does not exist

Site Plan Capture Options First Option: Traditional Survey done internally Work estimated at roughly 800 hours for Jones Island Second Option: Develop RFP for work to be done by a consultant using LiDAR 9

Deliverables 10

Consultant 11 RA Smith selected Work commenced Final deliverable received Significant time and cost savings to District

12 Results “Improved Accuracy”

13 Results “Improved Accuracy”

14

15 Results “Level Of Detail” Original Site Plan Updated Site Plan

16 Results “Level Of Detail” Original Site Plan Updated Site Plan

Scanner Details 17 Leica P20:  210 scan positions at JI  Three minutes per scan (not including set-up)  Line-of-sight scanning  Between 16 & 20 million points per scan  Survey Grade accuracy to an eighth of an inch Deliverables:  Final IMP (native) size 135GB  PTS file size 112GB, 12 files  TruView data set 11.4GB

TruView 18

Point Cloud Tools 19

GIS & CAD Improve GIS feature accuracy Surface creation to look at settlement issues Consistency between GIS & CAD 20

Looking Ahead South Shore Site Scan Import data to SDE Update PlantMan Test incorporating TruView into PlantMan Create Master CAD site drawing 21

QUESTIONS? 22