SW Region Construction Conference February 19 th 2015 Jim Romanowski – Work Zone Engineer Traffic Section – SW Region Madison Office.

Slides:



Advertisements
Similar presentations
Work Zone Traffic Management
Advertisements

How would you like it if people drove their cars thru your office?
Gerald L. Ullman, Ph.D., P.E. Texas Transportation Institute Designing and Maintaining a Pedestrian-Friendly Work Zone.
Do you know your signs?.
2-10 ODOT Sign Policy and Guidelines for the State Highway System Ch. 6 – Construction and Maintenance Signs Oregon Department of Transportation Traffic-Roadway.
Revisions to Chapter 2B – Regulatory Signs, Barricades, and Gates.
2009 MUTCD (Final Rule) Revisions Incorporated into the 2009 MUTCD Revisions to Part 8 – Traffic Control for Railroad and LRT Grade Crossings.
Traffic Control Devices Module 4 1 This training is provided under Susan B. Harwood No. SH F-8. It does not necessarily reflect the views or.
Chapter 5 Signs, Signals, and Roadway Markings
February 26, 2015 | Fredericksburg, VA Work Zone Safety
SW Region Construction Conference February 19 th 2014 Joe Schneider – Work Zone Engineer Traffic Section – SW Region La Crosse Office.
Updating Boulder’s work zone traffic control guidelines Marni Ratzel Bicycle & Pedestrian Transportation Planner GO Boulder/city of Boulder.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Road Signs and Markings Recognition Quiz Each sign will appear for 0.3 seconds…
“ Pavement markings can enhance safety since centerlines have been shown to cut crash frequency by 29% compared to roads without them ” Wisconsin Transportation.
Welcome to Inspecting Maintenance of Traffic Items on Projects
Draft Lighting Policy Ted Swansegar Cell:
2009 MUTCD (Final Rule) Revisions Incorporated into the 2009 MUTCD Revisions to Chapter 2B – Regulatory Signs, Barricades, and Gates.
Freeway Signing Plan Design April 29, 2008
1 Starting a Project – Looking for footpaths or pushed down ROW fences Plan for your pedestrians or they will be walking through your project on the edge.
I-295 / I-76 / NJ 42 Incident Management Task Force in New Jersey
June 2011 Statewide Traffic Engineers Meeting Interstate Guide Sign Upgrade Projects.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Office of Traffic, Safety and Technology Chapter 7 Signing Plan Sets Traffic Signs 101 November 20, 2014.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
Chapter 2 Signs, Signals, and Roadway Markings
WisDOT’s Statewide Traffic Operations Center. The mission of the STOC is to manage congestion and improve transportation safety, mobility, and efficiency.
CHAPTER 3 SIGNS, SIGNALS AND PAVEMENT MARKINGS
Office of Traffic, Safety and Technology Chapter 4 Types of Signs Traffic Signs 101 November 20, 2014.
DRIVER SAFETY.
Chapter 2 Signs, Signals, and Roadway Markings
Design Exceptions Presented by David Joe Polly PE, PLS, WRE Senior Standards Engineer Roadway Engineering Unit
Ohio Department of Transportation Marian Thompson Freeway Operations Engineer September 20, 2005 Current / Future Direction of ITS Programs.
Do you know your signs?.
Regulatory Signs Must obey Prohibited.
Temporary Traffic Control Standards Update. Why? Came into this position soon after TC details became TTC standards about 1.5 years ago (2/13/2013) As.
October 1, 2014 David Rush Work Zone Safety Program Manager, Traffic Engineering Division 2014 Work Zone Safety Team Reviews.
Illinois state line to Madison Dane and Rock County
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
March 27, 2007 – Hill Farms March 28, 2007 – NE Region Wisconsin LCS Lane Closure Planning System LCS Oversight Group Meeting Steven Parker - TOPS Lab.
Wisconsin Contractor-Engineer Conference January 22, 2009 Safety Apparel, FHWA Work Zone Safety Subpart K Rule & Permanent Concrete Barriers Bill Bremer,
Interchange Design Wes Mayberry Transportation Engineering Intern
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Pete Lynch/Dawn Johnston representing WisDOT Feb 26, 2014 –Northcentral Technical College.
THE I-75 DAYTON RECONSTRUCTION
Quality Assurance & Statewide Consistency  Design Standards & Practices making it to the field?  Standards being applied uniformly Region to Region?
Office of Traffic, Safety and Technology Module 4 Work Zone Applications Traffic Control Plan Development Course.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
Strategic Highway Research Program 2 Project L07 Identification and Evaluation of the Cost- Effectiveness of Highway Design Features to Reduce Nonrecurrent.
1 Using Intelligent Transportation Systems (ITS) Technologies and Strategies to Better Manage Congestion Jeffrey F. Paniati Associate Administrator of.
Understanding Work Zones
Mike Wendt & Cara Abts WisDOT Regional Traffic March 10, 2015.
REVIEW OF THE PROPOSED SIGNIFICENT REVISIONS TO THE 2011 VIRGINIA WORK AREA PROTECTION MANUAL Fall 2014 Virginia ATSSA Chapter Meeting October 1, 2014.
Improving Communication and Coordination in Highway Work Zones Kimberly Peters Incident Management Program Director, INDOT Event Date.
LCS Objectives Provide a standard interface for lane closure operations, closure tracking, and data retrieval for WisDOT regional offices statewide Provide.
Construction zones and traffic control Objective Review extent of problem Identify contractor responsibilites Identify control plan components.
Work Zone Safety Virginia Work Area Protection Manual International Municipal Signal Association March 8, 2016 Paul Kelley & Ginger Quinn WZ Safety Coordinators.
Work Zone Safety Guidelines For Maintenance, Construction and Traffic Personnel.
2011 Road School Work Zone Traffic Control Handbook.
Temporary Pedestrian Accommodations in Utility Work Zones Rebecca Klein, PE Regional Work Zone Engineer ,
Maintenance and Temporary Traffic Control
 Signs that set limits or give commands are regulatory signs. Regulatory sings control traffic.
Indiana MUTCD: for Operations & Maintenance Issues/Solutions – Part II.
Review of Revised SP 150 – Traffic Control Dated February 01, 2017
Traffic Control Plan Development Course
Design Standards.
WisTMP 2.0 Update Andy Heidtke, PE Statewide Work Zone Design Engineer
Presentation transcript:

SW Region Construction Conference February 19 th 2015 Jim Romanowski – Work Zone Engineer Traffic Section – SW Region Madison Office

Lane Closure System (LCS) An overview

Web-based system used to track closures and restrictions on Wisconsin State Highways Facilitate data sharing with WisDOT applications that require lane closure data, such as 511 Traveler Information and Oversize/Overweight (OSOW) permitting Improve the completeness, reliability, and timeliness of lane closure data on State Highways LCS Objectives

What closures should be tracked? – All let projects – Any planned maintenance or permit / utility work closure or restriction When should closures be entered? – 14 days - Project start, new lane closures, full roadway closure, change in width restriction, construction stage changes, ramp closures,detours – 14 days - New ramp closure (available width < or = 16’) – 3 days - Lane and service ramp closure (available width > 16’) System Use

Data Accuracy & Completing Closures It is critical that all closure information entered in the LCS be accurate – The closure information entered in the LCS is used to: Provide traveler information through WI’s 511 phone system and website Issue OSOW permits, which has a direct impact on the movement of commerce through WI

Web Address

Closure Walk Through Type of facility ( mainline, ramp, bridge or system interchange ) Duration type ( daily/nightly, weekly, continuous or long term ) Closure is either a closure or restriction What’s closed ( single lane, left shoulder, left lane, 2 left lanes etc.. ) Closure location If the closure location is not listed, find the closest point and give a direction and distance from OSOW Restrictions ( place any restrictions that OSOW will use when creating routes / issuing permits ) If a full closure is selected, a detour route will need to be entered Other useful information about the closure should be placed in the external facilities box If more than 1 facility will be needed, the add facility button will allow for multiple entries Enter lane width available or height available

Work Zone Traffic Control Guides

Work Zone Traffic Control Proper Signing

WZ Traffic Control - NEW Pedestrians and Bicycle access. Be aware that new access requirements for pedestrians and bicyclists are being phased in. Applies generally in urban projects. Projects currently in design are including new standard detail drawings.

Sign sheeting

Sign mounting/height

Lane closed sign & barricade

Unacceptable Message and Sheeting Material

Work Zone Traffic Control TC Equipment

Portable changeable message sign (PCMS) messaging

Arrowboard Condition

DRUM Condition

Work Zone Traffic Control Flagging

FLAGGING Positioning & equipment

Flagging positioning & equipment

Equipment/material storage

Work Zone Traffic Control Personal Safety

Safety Apparel Chapter 6

Permanent Signing

Unacceptable Mounting

Standard Specification Furnish a sign mounting system from the Departments approved products list. Signing contractor should order sign mounting brackets with plenty of lead time. Sign mounting hardware, including mounting brackets are incidental to signing bid item.

Approved Overhead Sign Support Mounting Bracket

Bid Items for Signs Most Common Types of Reflective Sheeting Signs Type 1 Reflective SH – Large Interstate / Freeway Signs mounted on steel I beams or overhead sign structure Signs Type 2 Reflective H – Regulatory and Directional Signs Signs Type 2 Reflective F – Warning and School Related Signs

Sign Manufacture Details in Plan See notes for sign type and sheeting type.

Special Sign Details – Shop Drawings are not Required Manufacturer shall use plan details. – Type 1 example

Special Sign Details – Shop Drawings are not Required Manufacturer shall use plan details. – Type 2 example

Signing and Marking Contact Information La Crosse Office – Iver Peterson – (608) – Eric Glindinning – (608) Madison Office – Erik Nilson – (608) – Jeff Holloway – (608)

Joe Schneider Traffic – La Crosse Office Jim Romanowski, Traffic – Madison Office Questions?