Energynetworks.org 1 PRESENTED BY Andrew Neves, Chair CMG CMG and Workstream Update.

Slides:



Advertisements
Similar presentations
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Advertisements

Update on IDNO/DNO working group DCMF 12 November 2009.
DCMF Treatment of pre 2005 generation – DNO position Nigel Turvey 29 April | Energy Networks Association.
RIIO – ED1 timetable Robert Friel Regulatory Strategy and
CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 1 April 9, 2008 Potential developments in long-term.
EDCM update Mo Sukumaran (on behalf of CMG)
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
Update from DCUSA DCUSA Secretariat 16 August | Energy Networks Association - DCMF.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
A regulatory framework for gas quality treatment facilities: recap and update.
5 February 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. Charging Methodology Update April 2008 Oliver Day Distribution.
EDCM submission workshop Andrew Neves CMG Chair 12 May | Energy Networks Association - CMG.
7 th October 2010 energynetworks.org 1 PRESENTED BY Andrew Pace, WSC CHAIR Workstream C Long Term Products Common Methodology Group Work.
1 st April 2010 energynetworks.org 1 Common Methodology Group Work PRESENTED BY Tony McEntee, ENW Workstream 4 Update Common Connection Charging Methodology.
EDCM Development Workshop Welcome 1 | Energy Networks Association 13 January 2011.
19 March 2010 energynetworks.org 1 PRESENTED BY Nigel Turvey Workshop on Distributed Generation Connected pre April March 2010.
Update from DCMF MIG Update from the Distribution Charging Methodologies Forum (DCMF) Methodologies Issue Group (MIG) 14 June | Energy Networks.
Considerations for EHV charges for April 2010 María Isabel Liendo SP Energy Networks DCMF, 04 June 2009.
15 January 2010 energynetworks.org 1 PRESENTED BY SIMON BROOKE Revised DCMF Terms of Reference Distribution Charging Methodology Forum.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF CMG Amending the DCMF Terms of Reference Distribution Charging Methodology.
03 April 2009 energynetworks.org 1 Common Methodology Group Work Presentation from Workstream 4 Review of the Connection Charging Boundary in the CDCM.
17 May 2011 Generation Dominated Areas Oliver Day UK Power Networks (on behalf of DNOs) 1 | Energy Networks Association.
Energy Suppliers Forum CDCM/EDCM - CMG Update Mo Sukumaran – CMG 10 November | Energy Networks Association.
10 September 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY Common Distribution Charging Methodology Impact Analysis.
ElectraLink Update on DCUSA Activities. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation10 (DCP 133, 159, 160, 161, 165,
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF WSA Presentation from Workstream A looking at the Network Modelling aspects.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Update from DCUSA Michael Walls DCUSA Secretariat 04 August | Energy Networks Association - DCMF.
Provision of third party access to licence exempt electricity and gas networks Tony McEntee 5 April | Energy Networks Association - DCMF.
CDCM Training Session Introduction to producing DUoS Tariffs using CDCM Models Julia Haughey (EDF Energy) Binoy Dharsi (IPM Energy Retail Ltd) 20 December.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
DCUSA Update ElectraLink. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation8 (DCP 133, 158, 159, 160, 161, 163, 165, 168)
The Australian Energy Regulator TasNetworks Public Forum Revenue Proposal 1 July 2014 to 30 June July 2014.
DCUSA Update ElectraLink. The following Change Report are due to be presented to the DCUSA Panel at its meeting on Wednesday 16 January 2013: DCP 143.
11 December 2008 energynetworks.org 1 Common Methodology Group Work PRESENTED BY GEORGE MORAN, CENTRAL NETWORKS, ON BEHALF OF WORKSTREAM 2 Presentation.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
The EDCM proposals A summary of Ofgem’s consultation Ynon Gablinger 2 June 2011.
EDCM update Mo Sukumaran On behalf of DNOs ( WSB Chair) 1 December | Energy Networks Association - DCMF.
EDCM Workshop Workstream C Update Andy Pace - Chair 10 November | Energy Networks Association.
CDCM Annual Review Workshop Mo Sukumaran SSEPD (on behalf of DNOs) 17 May May | Energy Networks Association - CMG.
Update from DCUSA Michael Walls DCUSA Secretariat 06 October | Energy Networks Association - DCMF.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
GVC Group Update Andy Pace 6 October | Energy Networks Association - DCMF.
January 24, 2016 energynetworks.org 1 The SoC Project A PRESENTATION BY THE REGULATION GROUP OF THE ENERGY NETWORKS ASSOCIATION PRESENTED BY ANDREW NEVES.
Agency Charging Statement Overview of Consultation 11 th February 2008.
EDCM update Andrew Neves CMG Chair 2 June | Energy Networks Association - DCMF.
PLWG Report to ROS September 4, PGRR039 PGRR requires Interconnecting Entities (IEs) to provide information for ERCOT’s resource adequacy reports,
Consumer Research for DPCR5 Stakeholder meeting 15 June 2007 Laura Nell, Quality of Service, Ofgem.
Structure of Charges: Update and next steps DCMF 10 September 2008.
Industry Dialogue on xoserve Services 14 th September 2007.
4 June 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
European Developments Transmission Workgroup 3 rd May 2012.
12 November energynetworks.org 1 PRESENTED BY MO SUKUMARAN, ON BEHALF OF WSB Presentation from Workstream B Pricing Modelling (EDCM/CDCM) Common.
CMG and Workstream Update
Grid Code Development Forum – 6 September 2017
Code Governance Review UNC Modification Proposals
Transmission Planning Code
Transmission Workgroup 4th October 2012
UNC Trader User – Licence obligations
NTS Entry Charging Review Update
Exit Capacity Substitution and Revision
Generation Dominated Areas(GDA)
Generic Revenue Driver Methodology
Ofgem presentation to Gas Transmission Workstream
Open Letter - Summary of Responses
Incremental Entry Capacity Release Methodology Statement
Gas Customer Forum 28 July 2008
Presentation transcript:

energynetworks.org 1 PRESENTED BY Andrew Neves, Chair CMG CMG and Workstream Update

3 June 2010 energynetworks.org 2 EDCM Overview Two workstreams (WSA & WSB) set up to deliver EDCM charging methodologies as outlined in Ofgem’s July 2009 decision document (ref: 90/09) Open to all stakeholders Current representation from all DNOs, suppliers, IDNOs (where relevant) and Ofgem Submission deadline -1 September 2010

3 June 2010 energynetworks.org 3 WSA Update Progress so far: ‘Working Draft’ LRIC / FCP Methodology Statements and Implementation and Guidance Notes were produced in March: documenting the common understanding, of the individual EDCM methodologies outlined in Ofgem July 2009 decision document (ref: 90/09) sent to Ofgem for review published on the ENA’s Structure of Charges website

3 June 2010 energynetworks.org 3 WSA Update (cont.) Ofgem subsequently indicated that further development is required to address its concerns on some aspects of the LRIC and FCP methodologies In response, WSA has developed a number of improvements to the EDCM methodologies for inclusion in the forthcoming consultation

WSA Update (cont.) LRIC Improvements Revised modelling of generation in the minimum demand scenario ‘Sense checking’ of powerflows derived from application of security factors FCP Improvements Revised generation analysis – increases the number of locations that a Test Size Generator is applied (increasing the extent of network ‘tested’) ‘Sense checking’ of TSG sizes energynetworks.org 53 June 2010

WSB Update Progress so far Recent consultation on EDCM/CDCM boundary received 10 responses (including all DNOs), which have now been summarised Response to CDCM condition on generation-dominated areas being developed Draft EDCM models based on current proposals provided to Ofgem for feedback and further development energynetworks.org 63 June 2010

WSB Update (cont.) Current proposals for tariff elements: 1. Demand (import tariffs) Charge 1 from FCP/LRIC (p/kVA/day) Transmission exit (p/kVA/day) Sole user asset charge (p/day) Scaling (p/kVA/day) (might be negative) energynetworks.org 73 June 2010

WSB Update (cont.) 2. Generation (export tariffs) Charge 1 from FCP/LRIC (p/kWh) credit for non- intermittent generation Charge 2 from FCP/LRIC (p/kVA/day) Transmission exit (p/kVA/day) charge or credit energynetworks.org 83 June 2010

WSB Update (cont.) 3. Network interconnections LDNOs: portfolio with CDCM-like and EDCM-like parts Offshore: portfolio ? DNO-to-DNO: treat as demand? energynetworks.org 93 June 2010

Next steps Agree key outstanding issues and seek positive opinion from Ofgem for consultation paper Revised WSA documentation to be produced to accompany the consultation Continued development of LRIC/FCP as issues identified through implementation/ consultation phase DNOs populate EDCM pricing model to produce illustrative tariffs for consultation paper Issue EDCM consultation on 18 June 2010 Complete work on CDCM generation-dominated areas energynetworks.org 103 June 2010

Revised EDCM timeline energynetworks.org 113 June 2010