Nuclear Power Plant Hearing Combined Construction Permit and Operating License.

Slides:



Advertisements
Similar presentations
Conclusions and Recommendations
Advertisements

TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Environmental Science Chapter 11 Notes #2. Review Nonrenewable resources Renewable Resources Fossil Fuels The energy of fossil fuels is most commonly.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
Nucleo-electricidad en Chile International Seminar Final Comments By Dr. Nils J. Diaz The ND2 Group, LLC Santiago, Chile January 28, 2010.
PERMITTING CHALLENGES FOR THE NEW GENERATION OF NUCLEAR POWER PLANTS Ping Wan Bechtel Power Corporation Ninth Nuclear Utility Meteorological Data Users.
Nuclear power plant siting International Nuclear Power Conference October 23, 2009, Tallinn.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
School for drafting regulations Nuclear Safety Siting and site evaluation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
School for drafting regulations Nuclear Safety Combined licensing approach Vienna, 2-7 December 2012 Tea Bilic Zabric.
Patrick N. Foster Central Connecticut State University Urban Transportation Renewal Renewal: an Activity.
Wellhead Protection Strategies: Keys to Success Prepared by: Mr. Brian Oram, PG, Licensed Driller, PASEO B.F Environmental Consultants and Wilkes University.
New Nuclear Power Plants Need and Status ASQ-EED 31 st Energy & Environmental Division Conference September 12, 2004 Adrian Heymer, NEI
Kiggavik Project Final Hearing Presentation
Knowledge on HIA IN CAMBODIA Constructing a Caring and Sharing Community Roles of HIA 4-6 October 2012 Bangkok.
BCE Environmental Engineering Introduction to Environmental Engineering Mdm Nur Syazwani binti Noor Rodi.
The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon) December 2, 2009 David B. Matthews, Director Division of New Reactor.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
Content Standard A As a result of activities in grades 9-12, all students should develop: Abilities necessary to do scientific inquiry Understandings about.
PROCESSES AND ISSUES TO CONSIDER ON WHETHER OR NOT TO AMEND AGREEMENT STATE STATUS Uranium Working Group August 2, 2012.
Calvert Cliffs Unit 3 Status Summary for PPRAC Meeting 26 August 2008.
Possible future directions for Article 6: a perspective from the UK Has public participation in the environment run aground? Naomi Luhde-Thompson Planning.
IAEA International Atomic Energy Agency LICENSING OF RADIOACTIVE WASTE MANAGEMENT FACILITIES, part 2 Luc Baekelandt Safety of.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
1 Standards Database Initial Development Tom Boyce, NRC/RES/RGDB Nuclear Energy Standards Coordination Collaborative (NESCC) March 1, 2011
Management of Change ► The health, safety, security, environmental, technical and other impacts of temporary and permanent changes are formally assessed,
Plant Parameter Envelope for Early Site Permits
Maria J Moracho Ramirez Regulatory Activities Section
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Nuclear Power Proposal Colin O’Keeffe. What is Nuclear Energy? A relatively new power source introduced in the early 1970’s A relatively new power source.
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
1 Current Issues in Siting Safety Reviews Michelle Hart, Sr. Reactor Engineer Division of Site and Environmental Reviews NRC Regulatory Information Conference.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
CONCLUSION AND SUMMARY. How has (NLCA) been met? a) whether the project would enhance and protect the existing and future well-being of the residents.
1 Status of AC Input from Last Meeting. 2 Overview  Input received on Strategic Planning Elements (Mission, Vision, Guiding Principles) & the 7 Key Content.
Clear thinking on Nuclear: Waste disposal 1.One site for high-level radioactive waste is easier to monitor, regulate, and secure 2.A repository will provide.
Campaign for Nuclear Energy Team: Nuclear Cowboyz (NuBoyz) Michael Hartley Ben Ponto Hieu Lai Luke French.
Formative assessment of the Engineering Design process Review questions in handout Write brief, informal answers to each question.
IAEA International Atomic Energy Agency. IAEA Dr. Abraham Gregorio de Rosa,Sp.Rad Radiologist in HNGV Dili, Timor Leste 2 Perspectives on regulatory models.
SITE. A Rural/Agriculture A Rural/Agriculture Applicant Request The applicant is seeking to establish a primate sanctuary (Koreymonde Primate Sanctuary).
WE HAVE THE SEQUENCES AND ID’s so now WHAT’S NEXT.
Saskatchewan Senior Science Curriculum Renewal. Prerequisites for High School Science Credits Science 10 Health Science 20 Biology 30 Environmental Science.
Managing the Environmental Impacts of Power Canada Europe Roundtable for Business Toronto, 31 May 2005.
1 NRC Update R. Brad Harvey, Leta Brown US Nuclear Regulatory Commission th NUMUG Meeting, Wilmington, NC.
I TEM F11 B – A PPEAL N UMBER A-3-MCO Carmel Area Monterey County C ALIFORNIA C OASTAL C OMMISSION C ENTRAL C OAST D ISTRICT S LIDE 1.
Adding Nuclear Power to the Grid ASQ Energy and Environmental Conference August 28, 2006.
The Spaceport Enterprise Defining and Developing the Concept Kevin Brown Command and Control Technologies Corp. Advanced Spaceport Technology Working Group.
Nuclear Power Plant Site Exploration By: Spencer Livermore Blake Costa Nate Dillow Charlie Nystrom Ryan Brunner.
Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009.
Renewable Energy Adriana Martinez. Biomass Briquettes Biomass Briquettes are converted into a usable form of energy by being used as alternatives to firewood,
IAEA International Atomic Energy Agency Sustainable Uranium Resources Development Business Model Canvas for MONGOLIA / MINISTRY OF MINING Presented by.
New Plant Regulatory Issues Kati Austgen Washington International Representatives Meeting July 12, 2012.
FY 2012 Budget Press Briefing February 14, NRC FY 2012 Budget NRC Mission: License and regulate the Nation’s civilian use of byproduct, source,
Federal Energy and Environmental Regulation Agencies and Laws
Legislative and Regulatory Framework
Nuclear Chemistry Unit 14.
Earth/ Environmental Science
Adding Nuclear Power to the Grid
WorkGroup N 02 Countries Iran, Vietnam, Kenya, Jordan, Nigeria, South Africa, Poland and Morocco.
Welcome to our STEM night!
4th ISOE European Workshop on Occupational Exposure Management at NPPs Lyon, France, March 2004 Kirsi Alm-Lytz Radiation and Nuclear Safety Authority.
Chemical Purchasing.
Overview of Vogtle Nuclear Power Plant
William D. Reckley, Branch Chief
Anna Bradford, Deputy Director Division of New Reactor Licensing
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.4 Protecting citizens from environmental hazards European.
12 Safe Maintenance Rules
Social Studies Starter
Camarillo Springs Project Draft EIR Scoping Meeting
LEARNING OBJECTIVES The key objectives of this lecture are to familiarize the workshop participants with the: Different stages of the licensing process.
Presentation transcript:

Nuclear Power Plant Hearing Combined Construction Permit and Operating License

National Standards Science in Personal and Social Perspectives Content Standard F – Personal and community health – Population growth – Natural resources – Environmental quality – Natural and human-induced hazards – Science and technology in local, national, and global challenges

Combined Construction Permit and Operating License Is the site suitable for the type of reactor proposed? Can the pre-approved reactor be successfully “married” to the site? What are the environmental impacts of construction and operation of the reactors at the site? Will the plant be constructed in accordance with the approved designs as fitted to the specific site?

Sub Issues Site Suitability – seismology, hydrology, meteorology, geology, emergency planning. Characteristics of the site that raise safety issues with respect to operation of the plant. Costs of building on the site, recurring costs after construction, costs to local community.