The story of Thailand’s centralized power sector

Slides:



Advertisements
Similar presentations
Pakistans Power Sector Need for Reforms By Kalim A. Siddiqui President-Petroleum Marketing Byco Petroleum Paksitan Limited 4 th International Power Generation.
Advertisements

Energy. oil and natural gas  supply 62% all energy consumed worldwide  how to transition to new sources?  use until mc of further use exceeds mc of.
1 Presentation on Investment Opportunities in Indian Power Sector and Cooperation with IEA By R.V. SHAHI Secretary, Ministry of Power Government of India.
topics Burmese energy sector (compiled by MEE NET)
1 AEP Perspectives on Development and Commercialization of CCS Technology for Natural Gas Power Generation Matt Usher, P.E. Director – New Technology Development.
Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
Key SEA framing issues Power demand and power trade development in the LMB and GMS SEA Team.
Lignite Project By Ramic, Haris. GLOBAL OUTLOOK FOR ENERGY World energy consumption is projected to increase at about 1.8%/year between 2000 and 2030(driven.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
The Status Quo, Barriers, and Countermeasures to Small Hydropower Development in Rural China Hydropower and Rural Electrification Development Bureau, the.
WORLD ENERGY INVESTMENT OUTLOOK
BUSINESS OPPORUNITIES IN SAUDI POWER SECTOR US-Saudi BUSINESS OPPORTUNITIES FORUM CHICAGO April 28-29, 2010 Ali Albarrak President &C E O Saudi Electricity.
Alternative Energy Development Plan (2008 – 2022), Medium - and Long – term Investment Plan and the Role of the Private Sector Mr. Rangsan Sarochawikasit.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
Competition law and sectoral regulation on Thai energy sector: A review and the forward development plan Pornchai Wisuttisak Admitted as a lecturer in.
DEVELOPMENT OF A REGIONAL ENERGY MARKET IN THE MEKONG AREA by Piyasvasti Amranand National Energy Policy Office, Thailand ENERGY WEEK April 1999,
Empowering Rural Electrification in Myanmar: Opportunities and Policies Tungapuri Hotel Nay Pyi Daw, Myanmar Dr. Chris Greacen March 9, 2013.
Exploring Energy Opportunities In India NABC Conference June 29, 2006.
Thailand, May 2009 Mekong Energy and Ecology Network The First Mekong Energy and Ecology Training.
Thailand’s Energy Situation
Better Power for Health: Healthy Public Policy and Sustainable Energy in Thai Power Sector Dr. Decharut Sukkumnoed Faculty of Economics, Kasetsart University.
Thailand’s Power Development Plan (PDP)
ASEAN People Forum Thailand’s Perspectives on Energy Industry and Investment in ASEAN 19 October 2009 Chuenchom Sangarasri Greacen Palang Thai
Thailand situation analysis and initial idea for case study Chris Greacen Sopitsuda Tongsopit Chuenchom Greacen Palang Thai.
Chuenchom Sangarasri Greacen Palang Thai Workshop on
VI. KAZENERGY Eurasian Forum Wind energy development in the emerging markets including Kazakhstan Andreas Thomas, Senior Vice President Business Development.
Chris Greacen Chiang Mai, Thailand 24 January 2013 Grid-connected renewable energy in Thailand under the VSPP and SPP programs MEENet workshop, session.
Scaling Up Energy Efficiency in India: Opportunities in the Electricity Sector Dr. Jayant Sathaye, Dr. Amol Phadke and Ranjit Bharvirkar Energy Analysis.
Electricity Reforms in Bangladesh
1. Summit Implementation Review Group December 10, 2008 El Salvador Philippe Benoit Sector Manager, Energy Latin America and the Caribbean The World Bank.
Chris & Chom Greacen Oct 4, 2006 RAEL UC Berkeley Towards sustainable energy in Thailand Palang Thai Border Green Energy Team Public interest energy policy.
Electricity Generating Authority of Thailand (EGAT) 1 STRUCTURE, STATUS AND CROSS BORDER POWER INTERCONNECTION 0F THAILAND b y Mr. Prutichai Chonglertvanichkul.
Electricity in Thailand: current arrangements, impacts, alternatives 2 August, 2006 ERI Chris Greacen
Feed-in tariffs and south-south policy/technology transfer: The evolution and implementation of Very Small Power Producer (VSPP/SPP) Regulations in Thailand.
‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
May 20, 2009 MeeNet, Thailand Micro-hydro, biomass, biogas: technology, cost, potential, applications Palang Thai.
Northwest Power and Conservation Council Slide 1 Accelerating Energy Efficiency To Reduce the PNW Power System's Carbon Footprint Tom Eckman Manager, Conservation.
Privatization of profits, socialization of costs & risk: Privatization in Thailand’s Power Sector Chris Greacen Palang Thai July.
Power Sector Planning and Development: Lessons from Thailand’s and international experience Chuenchom Sangarasri Greacen 9 March 2013 WORKSHOP ON “ELECTRIC.
Clean electricity options for a free Burma Chris Greacen Palang Thai Seminar on “Energy: Tragedy in Burma” 20 November 2007 Chulalongkorn University.
Natural Gas – Some Regulatory Issues Oil & Gas Industry Practice.
Electricity in Thailand: current arrangements, impacts, alternatives 27 June, 2007 ERI Chom Greacen Chris Greacen
GMS Power Grid Who gains, who loses? Chuenchom Sangarasri Greacen 17 July 2005 Piyawan Resort.
Technical Advisory Group Tuesday 6 October 2009 Tony Pearson Network Planning Manager.
CIPCO Central Iowa Power Cooperative Iowa Industrial Energy Group April 9, 2013.
Selling renewable energy profitably to the grid: The evolution and results of Very Small Power Producer (VSPP) Regulations in Thailand and Tanzania Regional.
Thailand’s experiences in the power sector Chuenchom Sangarasri Greacen Chris Greacen, Ph.D. Palang Thai International Seminar on Dams and Sustainable.
El Gallo Hydroelectricity Project PDD Analysis
TRANSITION TO AN ELECTRICITY MARKET TECHNICAL SEMINAR PRESENTATION SMITA BISWAL #EE [1/10] Technical Seminar Presentation on TRANSITION TO AN.
World Environment Center International Environmental Forum European Roundtable Paris, France October 28-29, 2002.
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
Washington D.C. September 10, 2004 Electricity Generating Authority of Thailand Thailand Power Development Plan (PDP2004, )
Governance issues in the Thai Electricity Sector WRI/TEI Workshop on Electricity Governance in Asia Chuenchom & Chris Greacen Palang Thai:
Moving Forward with Clean Energy Priyantha Wijayatunga Principal Energy Specialist, Asian Development Bank
Slide 1 Overview of Conservation in the Pacific Northwest Energy Efficiency Options in the Northwest Post-2011Meeting March 4, 2008.
The regulators’ role in integrating non-market related environmental goals in energy markets Finn Dehlbaek, Deputy Director, Danish Energy Regulatory Authority.
11 Measures to support high- efficiency district heating and cogeneration Anders Hasselager Senior Policy Advisor Kiev, 19 May 2016.
Women In Energy Conference Kingston, Jamaica March 10, 2016.
Japanese Electricity Market M. Hossein Javidi Iran Electricity Market Regulatory Organization & Administrative Department for Electricity Market Regulatory.
Electricity Basket Price & 2013 Power Policy Hammad Hashmi Advisor Technical (USAID) MWP.
Chris & Chom Greacen 16 April 2009 Towards clean, just and democratic energy development in Thailand and South-east Asia Palang Thai.
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
Global Energy Problems and Counter Policies and Measures of Korea
Renewable energy potential in Thailand
NS4960 Spring Term 2017 Japan: Energy Outlook
Rajib Das Dy GM, Planning November 5, 2017 Transition of India’s
Connecting pigfarm biogas to the grid in Thailand – VSPP regulations
Inexpensive, secure electricity? coal vs. clean energy
NS4960 Spring Term 2018 Japan: Energy Outlook
Presentation transcript:

The story of Thailand’s centralized power sector Palang Thai Chuenchom Sangarasri Greacen 5 October 2009 MeeNet, Thailand

1. The origin

Bangkok’s first paved road (New Road) Electricity was introduced by King Rama V. Electric tram in Bangkok (powered by a wood-fired steam engine) in 1884.

Late 1800s – early 1960s Initially electricity served mainly the elites With series of wars and coups, not much happened in terms of spreading electricity By early 1960s, only 2% of Thais had electricity No consensus on form of ownership: private or state or coop model Diverse forms of ownership: over 200 separate small cooperative, municipal or privately owned utilities

At a cross road: centralized or decentralized model? Like the US Bonneville Power Authority, Thai National Energy Authority (NEA) was created to regulate hundreds of small utilities and built early power plants. Also served as the MRC secretariat and pushed large dam projects on the Mekong. With WB advocating central planning, fragmented state-owned enterprises Metropolitan Electricity Authority, Yanhee Electricity Authority, Northeast Electricity Authority, and the Lignite Authority

Decentralized Micro-hydro technology Micro-hydropower harnesses energy from falling water. Typcially some water is diverted from a stream using a weir. Water is then transported by a channel or pipes to a powerhouse downstream where the pressurized water spins a turbine, generating electricity. Source: Inversin, A. R. (1986). Micro-Hydropower Sourcebook. 6

Centralized generation High voltage transmission Transformer Centralized generation Medium voltage distribution

Deciding factor: Cold War politics USAID poured in billions of dollars to Thailand, seen as a regional power to be courted in containing communism USAID advisors considered micro-hydroelectricity but dismissed the option for large central generation with transmission and distribution In contrast to China’s extensive adoption of community-owned village-scale micro-hydro The USAID pre-feasibility study adopted verbatim as Thailand’s rural electrification master plan Electricity used to win the hearts & minds in “red/pink areas”

The birth of centralized utilities Creation of Electricity Generating Authority of Thailand (EGAT) By merging 3 SOEs With Metropolitan Electricity Authority (MEA) & Provincial Electricity Authority (PEA) in charge of distribution

Moral of the story… Centralized grid: in many cases, makes economic and technical sense, however… Control of a central grid need not be monopolized by one group Structure of centralized control determined by Cold War politics, not technical superiority Electricity played a political role

2. The Evolution

1970s – 1980s Centralized structure and control facilitated rapid expansion of grid, rural electrification Monopoly status with state power to provide essential public service Generous support from WB in particular Cost-plus structure State-owned utilities also grew in size and political power

1990s – Neo-liberal agenda With rise in global private capital, WB & IMF pushed privatization agenda Sale of EGAT’s assets: EGCO, Ratchaburi Giving “concessions” to private power producers (IPPs, SPPs) to generate & sell power Plan to create “Power Pool” and privatize the 3 utilities

2000s – National champion EGAT resisted neoliberal reforms Power Pool plan aborted EGAT aspired to be partially privatized “National Champion” but effort thwarted by civil action Still an SOE, EGAT has monopoly and public rights but with profit-seeking aspirations Use of profit-seeking subsidiaries to expand and pursue commercial interests Large capital and captive consumer base allows EGAT/its subsidiaries to invest abroad in competition w/ other transnationals

Power Grid & Pipelines are analogous to a giant’s arms reaching to grab resources to feed its endless appetite.

Changing role of electricity Electricity changes from a public service to a profit-making commodity With cross-border grid extension or regional grid, “Energy commons” (e.g. rivers w/ hydroelectric potential, natural gas) in countries surrounding Thailand are become a transnational commodity

3. The Character

Unchecked centralized power “A minority must sacrifice for the greater good” “out of sight, out of mind” Results: Structural violence Inequality waste

Siam Paragon MBK Central World Pak Mun 65 Dams Malls Province 123 81 75 Siam Paragon Central World Electricity production and consumption (GWh) Impacts of Pak Mun Dam alone 1700 families relocated Loss of livelihood for >6200 families Loss of 116 fish species (44%) Fishery yield down 80% Source: MEA, EGAT, Searin, Graphic: Green World Foundation Pak Mun 65 Mae Hong Song Dams Malls Province 23

Unlimited living? http://www.soho-properties.com/condobangkok-leraffine31/

The Champagne Glass Human Development Report 1992 UNDP, Human Development Report, 1998

Nam Theun 2 1000 MW Mainly to serve Thailand 6,200 people in Laos resettled Dam will dry Nam Theun River and swell Xe Bung Fai River Endangered species, elephant habitat to be flooded 26

4. The driver

Cycle of (over-)expansion under the centralized monopoly system Deterministic planning based on demand forecast leads to over-investment in capital-intensive power projects Power demand (over-)projections 1 2 Utilities’ Profits 3 Tariff structure that allows pass-through of unnecessary investments

Incentive structure for utilities: the more expansion, the more profits Financial criteria for utilities link profits to investments Thailand uses outdated return-based regulation WB’s promoted financial criteria such as self financing ratio (SFR) also have similar effects ROIC (Return on Invested Capital means: the more you invest, the more profits ROIC = Net profit after tax Invested capital EGAT 8.4% MEA PEA 4.8% Result : Demand forecast have systemic bias toward over-projections Too many expensive power projects get built

Power demand projection Sep 2007 (PDP 2007 revision 1) MW Economic Development Plan (years) Average GDP growth rate/year Average demand growth rate/year 10th plan (2550-2554) 5.0 5.86 11th plan (2555-2559) 5.6 5.95 12th plan (2560-2564) 5.54 48,958 MW 2,477 2,399 2,287 37,382 MW 2,235 2,178 2,131 2,035 27,996 MW 1,832 Demand increase per year 1,759 1,629 1,361 1,410 1,268 1,444 1,449 2550 – 2554 average increase 1,386 MW 2555 – 2559 average increase 1,877 MW 2560 – 2564 average increase 2,315 MW แผนพัฒนาฯ ฉบับที่ 10 แผนพัฒนาฯ ฉบับที่ 11 แผนพัฒนาฯ ฉบับที่ 12 ที่มา กฟผ.

Power Demand: Projections vs Power Demand: Projections vs. Actual 1992 – 2008 If no systemic bias, the chance of over-projecting demand 12 times in a row should be 1/4096!! MW

Why assume exponential growth? Linear vs. exponential extrapolation 31 power plants

Planning of capacity additions (Total capacity requirement = peak demand + 15% reserve margin)

Many questions for PDP 2007 Why only 1700 MW of distributed generation allowed? Why 4000 MW of nuclear in all options? Why DSM/energy efficiency not considered as an option? New capacity added to the PDP 2007 L = low case B = base case H = high case 1=“lowest cost” 2=“as much coal as acceptable” 3=“LNG + imports”

Cost estimate (Baht/kWh) Supply options Cost estimate (Baht/kWh) Generation Transmission1 Distribution2 CO2 3 Other envi impacts 4 Social impacts Total DSM 0.50 – 1.505 - 0.50 -1.50 SPP cogeneration (PES > 10%) 2.60 6 0.44 0.08 0.71 3.83 VSPP (Renewable) Bulk supply tariff (~ 3) + Adder (0.3 – 8) 0 – 0.63 0 – low 3.3 – 11.0 gas CC 2.25 7 0.37 0.09 0.79 low – medium 3.93 Coal 2.11 7 0.15 2.76 High 5.82 Nuclear 2.08 7 0.15 + 1.008 High – very high 4.04 หมายเหตุ 1. ใช้สมมติฐานว่าต้นทุนร้อยละ 12.4 ของค่าไฟฟ้ามาจากธุรกิจสายส่ง 2. ใช้สมมติฐานว่าต้นทุนร้อยละ 14.5 ของค่าไฟฟ้ามาจากธุรกิจจำหน่าย 3. ค่า CO2 ที่ 10 ยูโร/ตัน 4. ค่า Externality ตามการศึกษา Extern E ของสหภาพยุโรป และนำมาปรับลดตามค่า GDP ต่อหัวของไทย 5. การศึกษาของ World Bank 2005 6. ตามระเบียบ SPP 7. ที่มา : กฟผ. 8. Cost of liability protection, Journal “Regulation” 2002 – 2003

Lack of accountability in demand over-projection and over-investment made of possible by guaranteed rate of return for utilities ROIC = Net profit after tax Invested capital EGAT 8.4% MEA PEA ROIC (Return on Invested Capital means: the more you invest, the more profits 4.8% Guaranteed rate of return means central planners are rewarded, not held accountable, for their repeated errors in demand forecast

Cycle of over-expansion under the centralized system with return-based regulation Deterministic planning based on demand forecast leads to over-investment in capital-intensive power projects Power demand (over-)projections 1 2 Utilities’ Profits 3 Tariff structure that allows pass-through of unnecessary investments

5. The alternatives

Centralized generation High voltage transmission Transformer Centralized generation Medium voltage distribution

Centralized & decentralized generation High voltage transmission Transformer Centralized generation Cogeneration Medium voltage distribution Gasifier

Thai civil society created an alternative PDP that meets govt’ objectives, is more economic and cleaner. But it was not considered by the government ที่มา มูลนิธินโยบายสุขภาวะ 2552

Supply curve of Pacific NW Resource potential for generic coal, gas & wind resources shown for typical unit size. Additional potential is available at comparable costs. Source: Northwest Power and Conservation Council 42