Joint Hurricane Testbed (JHT) 2006 IHC Update USWRP Dr. Jiann-Gwo Jiing JHT Director TPC/NHC 22 March 2006.

Slides:



Advertisements
Similar presentations
TOPIC 3 CHAIR REPORT TROPICAL CYCLONE MOTION Russell L. Elsberry OUTLINE Need to improve track prediction –Importance of track forecast Opportunities to.
Advertisements

SIX INTERNATIONAL WORKSHOP ON TROPICAL CYCLONES 2006 IWTC-VI SAN JOSE, COSTA RICA NOVEMBER 2006 TOPIC 0.1 QUANTITATIVE FORECASTS OF TROPICAL CYCLONES LANDFALL.
Improvements to Statistical Intensity Forecasts John A. Knaff, NOAA/NESDIS/STAR, Fort Collins, Colorado, Mark DeMaria, NOAA/NESDIS/STAR, Fort Collins,
J. Kossin, 65th IHC, Mar 2011 Jim Kossin NOAAs National Climatic Data Center, Asheville, NC CIMSS/University of Wisconsin, Madison, WI
Joint Typhoon Warning Center Forward, Ready, Responsive Decision Superiority UNCLASSIFIED An Overview of Joint Typhoon Warning Center Tropical Cyclone.
A Blended, Multi-Platform Tropical Cyclone Rapid Intensification Index
Andrea Schumacher, CIRA/CSU Mark DeMaria, NOAA/NESDIS/StAR Dan Brown and Ed Rappaport, NHC.
The Joint Hurricane Testbed The Joint Hurricane Testbed is funded by the US Weather Research Program in NOAA/OAR's Office of Weather and Air Quality Chris.
1 Joint Hurricane Test Bed (JHT) 2005 IHC Update USWRP Dr. Jiann-Gwo Jiing JHT Director Technical Support Branch Chief, TPC/NHC 9 March 2005.
Tropical Cyclone Forecasts Dr. Richard J. Murnane Risk Prediction Initiative Bermuda Biological Station for Research, Inc.
Demonstration Testbed for the Evaluation of Experimental Models for Tropical Cyclone Forecasting in Support of the NOAA Hurricane Forecast Improvement.
Hurricane Diagnostics and Verification Workshop Opening Remarks Mark DeMaria May 4-6, 2009 National Hurricane Center Miami, Florida.
Targeting strategies to improve hurricane track forecasts (JHT 03-05) PIs: Dr Sharanya J. Majumdar (University of Miami) Dr Sim D. Aberson (NOAA/AOML/HRD)
Participation: Mark DeMaria (NESDIS), John Knaff (CSIRA/CSU), Buck Sampson (NRL/JTWC), Michelle Mainelli (NHC), Isaac Ginis (URI), Lynn Shan (RSMAS). Work.
Advanced Applications of the Monte Carlo Wind Probability Model: A Year 1 Joint Hurricane Testbed Project Update Mark DeMaria 1, Stan Kidder 2, Robert.
Advanced Applications of the Monte Carlo Wind Probability Model: A Year 2 Joint Hurricane Testbed Project Update Mark DeMaria 1, Robert DeMaria 2, Andrea.
Development of a Probabilistic Tropical Cyclone Genesis Prediction Scheme Jason Dunion1, John Kaplan2, Andrea Schumacher3, Joshua Cossuth4, & Mark DeMaria5.
A. Schumacher, CIRA/Colorado State University NHC Points of Contact: M. DeMaria, D. Brown, M. Brennan, R. Berg, C. Ogden, C. Mattocks, and C. Landsea Joint.
Improvements in Deterministic and Probabilistic Tropical Cyclone Wind Predictions: A Joint Hurricane Testbed Project Update Mark DeMaria and Ray Zehr NOAA/NESDIS/ORA,
The Impact of Satellite Data on Real Time Statistical Tropical Cyclone Intensity Forecasts Joint Hurricane Testbed Project Mark DeMaria, NOAA/NESDIS/ORA,
New and Updated Operational Tropical Cyclone Wind Products John A. Knaff – NESDIS/StAR - RAMMB, Fort Collins, CO Alison Krautkramer – NCEP/TPC - NHC, Miami,
Improved Statistical Intensity Forecast Models: A Joint Hurricane Testbed Project Update Mark DeMaria, NOAA/NESDIS, Fort Collins, CO John A. Knaff, CIRA/CSU,
Development of a Real-Time Automated Tropical Cyclone Surface Wind Analysis: Development of a Real-Time Automated Tropical Cyclone Surface Wind Analysis:
Update on Storm Surge at NCEP Dr. Rick Knabb, Director, National Hurricane Center and representing numerous partners 21 January 2014.
Improvements in Deterministic and Probabilistic Tropical Cyclone Surface Wind Predictions Joint Hurricane Testbed Project Status Report Mark DeMaria NOAA/NESDIS/ORA,
The Nation’s Hurricane Program: An Interagency Success Story March 5 - 9, st Interdepartmental Hurricane Conference.
Joint Hurricane Testbed An Update of the Joint Hurricane Testbed is funded by the US Weather Research Program in NOAA/OAR's Office of Weather and Air Quality.
An Improved Wind Probability Program: A Year 2 Joint Hurricane Testbed Project Update Mark DeMaria and John Knaff, NOAA/NESDIS, Fort Collins, CO Stan Kidder,
An Improved Wind Probability Program: A Joint Hurricane Testbed Project Update Mark DeMaria and John Knaff, NOAA/NESDIS, Fort Collins, CO Stan Kidder,
Hurricane Forecast Improvement Project (HFIP) Overview NOAA Hurricane Conference Ed Rappaport for Fred Toepfer and Bob Gall December 1, 2009.
NHC Activities, Plans, and Needs HFIP Diagnostics Workshop August 10, 2012 NHC Team: David Zelinsky, James Franklin, Wallace Hogsett, Ed Rappaport, Richard.
A. FY12-13 GIMPAP Project Proposal Title Page version 25 October 2011 Title: Combining Probabilistic and Deterministic Statistical Tropical Cyclone Intensity.
Update on the Joint Hurricane Testbed Activities Update on the Joint Hurricane Testbed Activities Jiann-Gwo Jiing JHT Director NHC 7 March 2007 Shirley.
Improving SHIPS Rapid Intensification (RI) Index Using 37 GHz Microwave Ring Pattern around the Center of Tropical Cyclones 65 th Interdepartmental Hurricane.
Improvements to the SHIPS Rapid Intensification Index: A Year-2 JHT Project Update This NOAA JHT project is being funded by the USWRP in NOAA/OAR’s Office.
1 Joint Hurricane Testbed (JHT) 2010 Update Transition from Research to Operations Jiann-Gwo Jiing Chief, Technical Support Branch, NHC JHT Director Chris.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Image: MODIS Land Group, NASA GSFC March 2000 Improving Hurricane Intensity.
61 st IHC, New Orleans, LA Verification of the Monte Carlo Tropical Cyclone Wind Speed Probabilities: A Joint Hurricane Testbed Project Update John A.
John Kaplan (NOAA/HRD), J. Cione (NOAA/HRD), M. DeMaria (NOAA/NESDIS), J. Knaff (NOAA/NESDIS), J. Dunion (U. of Miami/HRD), J. Solbrig (NRL), J. Hawkins(NRL),
NHC/JHT Products in ATCF Buck Sampson (NRL, Monterey) and Ann Schrader (SAIC, Monterey) IHC 2007 Other Contributors: Chris Sisko, James Franklin, James.
Review of NOAA Intensity Forecasting Experiment (IFEX) 2008 Accomplishments and Plans for 2009 Eric Uhlhorn, Frank Marks, John Gamache, Sim Aberson, Jason.
A. FY12-13 GIMPAP Project Proposal Title Page Title: Improvements to the Advanced Dvorak Technique Status: New – but continuing work from GIMPAP FY07-09.
Development of Probabilistic Forecast Guidance at CIRA Andrea Schumacher (CIRA) Mark DeMaria and John Knaff (NOAA/NESDIS/ORA) Workshop on AWIPS Tools for.
OFCM-Sponsored Working Group for Tropical Cyclone Research 1 WG/TCR Comparison of the 2008 and 2010 Snapshots of Tropical Cyclone R&D Dr. Frank Marks (NOAA)
1 Joint Hurricane Test Bed (JHT) Opportunities for Transfer of Research and Technology into Tropical Cyclone Analysis and Forecast Operations USWRP AMS.
1 Joint Hurricane Testbed (JHT) 2011 Update Transition from Research to Operations Jiann-Gwo Jiing JHT Director NHC Chris Landsea NHC Chris Landsea NHC.
Upgrades to the Rapid intensification index (RII ) John Kaplan (NOAA/HRD), Christopher Rozoff (CIMSS), Charles Sampson (NRL), James Kossin (NOAA/NCDC),
1 Joint Hurricane Testbed (JHT) 2009 Update Transition from Research to Operations Jiann-Gwo Jiing Chief, Technical Support Branch, NHC JHT Director Chris.
Improvements to Statistical Forecast Models and the Satellite Proving Ground for 2013 Mark DeMaria, John Knaff, NOAA/NESDIS/STAR John Kaplan, Jason Dunion,
Tropical Cyclone Rapid Intensity Change Forecasting Using Lightning Data during the 2010 GOES-R Proving Ground at the National Hurricane Center Mark DeMaria.
Tropical Cyclone Operations & Research Mary M. Glackin Deputy Under Secretary for Oceans & Atmosphere | NOAA 62 nd Interdepartmental Hurricane Conference.
Application of T382 CFS Forecasts for Dynamic Hurricane Season Prediction J. Schemm, L. Long, S. Saha and S. Moorthi NOAA/NWS/NCEP October 21, 2008 The.
Dynamic Hurricane Season Prediction Experiment with the NCEP CFS Jae-Kyung E. Schemm January 21, 2009 COLA CTB Seminar Acknowledgements: Lindsey Long Suru.
John Kaplan (NOAA/HRD), J. Cione (NOAA/HRD), M. DeMaria (NOAA/NESDIS), J. Knaff (NOAA/NESDIS), J. Dunion (U. of Miami/HRD), J. Solbrig (NRL), J. Hawkins(NRL),
Development of a Rapid Intensification Index for the Eastern Pacific Basin John Kaplan NOAA/AOML Hurricane Research Division Miami, FL and Mark DeMaria.
NOAA G-IV AIRCRAFT TRACK AROUND HURRICANE IVAN. ETKF PLANNED FLIGHT ACTUAL G-IV FLIGHT.
Improved Statistical Intensity Forecast Models: A Joint Hurricane Testbed Year 2 Project Update Mark DeMaria, NOAA/NESDIS, Fort Collins, CO John A. Knaff,
1 Joint Hurricane Testbed (JHT) 2010 Update Transition from Research to Operations Jiann-Gwo Jiing Chief, Technical Support Branch, NHC JHT Director 64th.
Dr. Ed Rappaport Deputy Director, TPC/NHC Chair Working Group for Hurricane and Winter Storms Operations and Research.
Enhancement of SHIPS Using Passive Microwave Imager Data—2005 Testing Dr. Daniel J. Cecil Dr. Thomas A. Jones University of Alabama in Huntsville
TC Projects Joint Hurricane Testbed, Surface winds GOES-R, TC structure – TC Size TPW & TC size (Jack Dostalek) IR climatology – RMW/wind profile Proving.
Developing an Inner-Core SST Cooling Parameter for use in SHIPS Principal Investigator: Joseph J. Cione NOAA’s Hurricane Research Division Co-Investigators:
Development and Implementation of NHC/JHT Products in ATCF Charles R. Sampson NRL (PI) Contributors: Ann Schrader, Mark DeMaria, John Knaff, Chris Sisko,
Overview of CIRA and NESDIS Global TC Services Presented by John Knaff NOAA/NESDIS Regional and Mesoscale Meteorology Branch Fort Collins, CO USA For The.
New Tropical Cyclone Intensity Forecast Tools for the Western North Pacific Mark DeMaria and John Knaff NOAA/NESDIS/RAMMB Andrea Schumacher, CIRA/CSU.
AQUA AMSR-E MODIS POES AVHRR TRMM TMI ENVISAT AATSR GOES Imager Multi-sensor Improved SST (MISST) for GODAE Part I: Chelle Gentemann, Gary Wick Part II:
Mark DeMaria and John A. Knaff - NOAA/NESDIS/RAMMB, Fort Collins, CO
A Guide to Tropical Cyclone Guidance
Progress in Seasonal Forecasting at NCEP
Verification of Tropical Cyclone Forecasts
Presentation transcript:

Joint Hurricane Testbed (JHT) 2006 IHC Update USWRP Dr. Jiann-Gwo Jiing JHT Director TPC/NHC 22 March 2006

Outline 1.Status of Second Round Projects (FY03-04) 2.Status of Third Round Projects (FY05-06) 3.Major JHT Activities in Status of Second Round Projects (FY03-04) 2.Status of Third Round Projects (FY05-06) 3.Major JHT Activities in 2006

Background information –15 projects were initially funded late in FY03: 3 one-year and 12 two-year projects –Three one-year projects concluded (Aug 2004) Decisions on operational implementation by TPC Director in December 2004 Two projects accepted for operational implementation and were implemented before 2005 Hurricane Season started 2005-present activities –12 two-year projects completed in August 2005 –Final stage of evaluation –Decisions on operational implementation for 8 projects in late March 2006 by TPC Director –Decisions on operational implementation for 4 model related projects in April 2006 by EMC Director Background information –15 projects were initially funded late in FY03: 3 one-year and 12 two-year projects –Three one-year projects concluded (Aug 2004) Decisions on operational implementation by TPC Director in December 2004 Two projects accepted for operational implementation and were implemented before 2005 Hurricane Season started 2005-present activities –12 two-year projects completed in August 2005 –Final stage of evaluation –Decisions on operational implementation for 8 projects in late March 2006 by TPC Director –Decisions on operational implementation for 4 model related projects in April 2006 by EMC Director Status of 15 Second Round Projects (FY03-04 Funding)

Background information: –Announcement of Opportunity (30 June 2004) –Review of proposals completed and recommendations made in late January 2005 –Total available funding: ~$1.2 Million PIs from federal labs received funding in late March (OAR) and June (DOD) 2005 Non-federal PIs received funding between late June and August 2005 JHT and project point of contacts coordinated with PIs to develop timelines Testing and evaluation during 2005 hurricane season Background information: –Announcement of Opportunity (30 June 2004) –Review of proposals completed and recommendations made in late January 2005 –Total available funding: ~$1.2 Million PIs from federal labs received funding in late March (OAR) and June (DOD) 2005 Non-federal PIs received funding between late June and August 2005 JHT and project point of contacts coordinated with PIs to develop timelines Testing and evaluation during 2005 hurricane season Status of 15 Third Round Projects (FY05-06 Funding)

Primary Area of Focus# of Projects Improvements to dynamical models (for track, intensity, and precipitation forecasts) 4 Intensity forecast guidance4 Enhancements to observed data, assimilation3 Tropical cyclone structure/wind distribution2 Track forecast guidance1 Enhancements to operational environment1 Total15 Third Round Project Focus Areas

3 rd Round (FY05) Funding Distribution Total $1.2M NOAA 39% Private Companies 9% State and Private Universities 36% Navy (NPS, NRL) 16%

Implementation First round: –10 projects, one was not continued after first year –Two projects continued into 2 nd round –Out of the seven accepted, 6.5 were implemented Second round: –Three one-year projects, 2 implemented, one not accepted –12 two-year projects being evaluated (some already implemented) First round: –10 projects, one was not continued after first year –Two projects continued into 2 nd round –Out of the seven accepted, 6.5 were implemented Second round: –Three one-year projects, 2 implemented, one not accepted –12 two-year projects being evaluated (some already implemented)

Implementation Some relative easy Some very complicated Some implemented by the PIs/other Centers Some implemented by TPC staff/PIs Some implemented by JHT staff/PIs Some relative easy Some very complicated Some implemented by the PIs/other Centers Some implemented by TPC staff/PIs Some implemented by JHT staff/PIs

Tropical Cyclone Rainfall Climatology and Persistence (R-CLIPER) Model Tropical Cyclone Rainfall Climatology and Persistence (R-CLIPER) Model Example real-time output in NAWIPS during Hurricane Lili (2002)

GFDL

AMSU Intensity/Size Estimation

Experimental Cumulative Wind Speed Probabilities This product will be operational in 2006 Computed each forecast cycle for all active tropical cyclones in the Atlantic, eastern/central Pacific, and western Pacific basins Computed on 2-D grids with 0.5-degree lat/lon spacing Provides probabilities of the surface wind speed equal to or exceeding 34, 50, and 64 kt over specified time intervals (0-120 hours in 12-hour intervals) Individual interval or cumulative probabilities Gridded, graphical, and text products can be produced

Major Activities for 2006 Present final reports on eight 2 nd round non-EMC related projects to TPC Director (mid-March) Rounds 3 PI presentations at the 60 th IHC in Mobile, AL (March 20-24) Decisions for implementation of eight 2 nd round projects by TPC Director (March 31) Decisions on implementation of four 2 nd round model-related projects by EMC (April) Second year funding proposals for 3 rd round projects due for SC review (April and July 2006) –Requested $1.265M, $1.15M available Real time testing and evaluation Present final reports on eight 2 nd round non-EMC related projects to TPC Director (mid-March) Rounds 3 PI presentations at the 60 th IHC in Mobile, AL (March 20-24) Decisions for implementation of eight 2 nd round projects by TPC Director (March 31) Decisions on implementation of four 2 nd round model-related projects by EMC (April) Second year funding proposals for 3 rd round projects due for SC review (April and July 2006) –Requested $1.265M, $1.15M available Real time testing and evaluation

Major Activities for 2006 (Preparing for the next round of funding) Revise Announcement of Opportunity (AO) for round 4 (FY07-08) projects. Send to DOC legal counsel for review in early April Round 4 AO released (June 30) Pre-application for round 4 proposals due July 31 Full proposals due October 30 Receive final scores from the SC (January 8, 2007) TPC and JHT Directors’ decision on which proposals to recommend for funding (January 29, 2007) Revise Announcement of Opportunity (AO) for round 4 (FY07-08) projects. Send to DOC legal counsel for review in early April Round 4 AO released (June 30) Pre-application for round 4 proposals due July 31 Full proposals due October 30 Receive final scores from the SC (January 8, 2007) TPC and JHT Directors’ decision on which proposals to recommend for funding (January 29, 2007)

Changes Russ Elsberry retired from the JHT Steering Committee (SC) Jeff Hawkins (NRL) elected to the SC Frank Marks retired from the SC Chris Landsea retired from the JHT adm. Assist. position (HRD) Shirly Murillo replaces Chris Landsea as the JHT adm. Assist. (HRD) Chris Landsea elected to the JHT SC (HRD) Rich Knabb retired from the JHT adm. assist. position (TPC) Chris Landsea joined the TPC and became the JHT adm. Assist. (TPC) John Gamache elected to the SC (HRD) Russ Elsberry retired from the JHT Steering Committee (SC) Jeff Hawkins (NRL) elected to the SC Frank Marks retired from the SC Chris Landsea retired from the JHT adm. Assist. position (HRD) Shirly Murillo replaces Chris Landsea as the JHT adm. Assist. (HRD) Chris Landsea elected to the JHT SC (HRD) Rich Knabb retired from the JHT adm. assist. position (TPC) Chris Landsea joined the TPC and became the JHT adm. Assist. (TPC) John Gamache elected to the SC (HRD)

JHT Website

Acknowledgements JHT Steering Committee JHT administrative assistants Alison Krautkramer, JHT meteorologist/programmer JHT principal investigators and other funded participants Ward Seguin and John Gaynor (OAR) TPC/NHC management and admin staff TPC and EMC forecaster and technical points of contact TPC/TSB IT staff JHT Steering Committee JHT administrative assistants Alison Krautkramer, JHT meteorologist/programmer JHT principal investigators and other funded participants Ward Seguin and John Gaynor (OAR) TPC/NHC management and admin staff TPC and EMC forecaster and technical points of contact TPC/TSB IT staff

Thank you

Supplemental Slides

Input for JHT Project Reports to the TPC Director Project PI final reportProject PI final report JHT staff members’ assessmentsJHT staff members’ assessments TPC Point of Contact (POC) feedbackTPC Point of Contact (POC) feedback JHT IT Facilitator reportJHT IT Facilitator report –IT transfer status –Compatibility and support issues –Estimates of costs to implement and support –Input from TPC Technical Support Branch Chief Project PI final reportProject PI final report JHT staff members’ assessmentsJHT staff members’ assessments TPC Point of Contact (POC) feedbackTPC Point of Contact (POC) feedback JHT IT Facilitator reportJHT IT Facilitator report –IT transfer status –Compatibility and support issues –Estimates of costs to implement and support –Input from TPC Technical Support Branch Chief

FY05 JHT Proposal Review Criteria (Condensed) Relevance to program goals (40 pts)Relevance to program goals (40 pts) –Research maturity (10 pts) –Priority-to-payoff factors (25 pts) –Other agency use (5 pts) Technical merit (40 pts)Technical merit (40 pts) –Risk-to-payoff factors (10 pts) –Testing (10 pts) –Operational usage (10 pts) –Technical compatibility (10 pts) Overall qualification of applicants (10 pts)Overall qualification of applicants (10 pts) Project costs (10 pts)Project costs (10 pts) Relevance to program goals (40 pts)Relevance to program goals (40 pts) –Research maturity (10 pts) –Priority-to-payoff factors (25 pts) –Other agency use (5 pts) Technical merit (40 pts)Technical merit (40 pts) –Risk-to-payoff factors (10 pts) –Testing (10 pts) –Operational usage (10 pts) –Technical compatibility (10 pts) Overall qualification of applicants (10 pts)Overall qualification of applicants (10 pts) Project costs (10 pts)Project costs (10 pts)

FY05 Review Process Preapplications (Letters of Intent) reviewed in Aug 2004 –40 preapplications reviewed –18 recommended to submit a full proposal Full proposals reviewed during Nov 2004 – Jan 2005 –19 proposals reviewed –Proposals independently reviewed and scored by 7 JHT Steering Committee members based upon review criteria listed in the AFFO Preapplications (Letters of Intent) reviewed in Aug 2004 –40 preapplications reviewed –18 recommended to submit a full proposal Full proposals reviewed during Nov 2004 – Jan 2005 –19 proposals reviewed –Proposals independently reviewed and scored by 7 JHT Steering Committee members based upon review criteria listed in the AFFO

Primary Areas of Focus# of Projects Improvements to dynamical models (for track, intensity, and precipitation forecasts) 4 Track forecast guidance algorithms3 Intensity forecasting algorithms3 Enhancements to observed data, assimilation 2 Initial intensity estimation1 Tropical cyclogenesis1 Rainfall1 Total15 JHT Second Round (FY03-04) Project Focus Areas

Second Round (FY03-04) Projects Dynamical model upgrades, obs/assimilation projects ProposalPIsTPC POCYrs Upgrades to the operational GFDL hurricane prediction system Bender (GFDL) Pasch Rhome 2 Improving the GFDL/URI coupled hurricane-ocean model Ginis (U. RI) Pasch Rhome 2 Hurricane model transitions to operations at NCEP/EMC Pan (NCEP) Pasch Rhome 2 Evaluation of upper ocean mixing parameterizations Jacob (U. MD) Shay (U. M) Halliwell (U. M) Lawrence Mainelli 2 Real-time dissemination of hurricane wind fields determined from airborne doppler Gamache (HRD) Franklin, McAdie, Blake EMC: several 2 Targeting strategies to improve hurricane track forecasts Majumdar (UM) Aberson (HRD) Toth (NCEP) Franklin2

Second Round (FY03-04) Projects Cyclogenesis and track forecasting projects ProposalPIsTPC POCYrs Objective and automated assessment of operational global forecast model predictions of tropical cyclone formation and life cycle Harr (NPS) Pasch Avila Blake 2 An updated baseline for track forecast skill through five days for the Atlantic and Northeastern and Northwestern Pacific basins Aberson (HRD) Franklin Gross 1 Accepted and implement ed Quantifying tropical cyclone track forecast uncertainty and improving extended-range tropical cyclone track forecasts using an ensemble of dynamical models Goerss (NRL) Beven Gross 1 Accepted and implement ed Transition of revised dynamical model track prediction evaluation expert system (DYMES) Boothe (NPS) Stewart Roberts 1 Not accepted

Second Round (FY03-04) Projects Intensity and rainfall projects ProposalPIsTPC POCYrs Improving the validation and prediction of tropical cyclone rainfall Pan (NCEP) Black (HRD) Marchok (NCEP) Stewart Molleda 2 Implementation of the Advanced Objective Dvorak Technique (AODT) and Tropical Cyclone Intensity Estimation (TIE) algorithms at TPC Kossin (U. WI) Velden (U. WI) Beven, Rhome, Mainelli, Cobb, Brown 2 Improvements in Deterministic and Probabilistic Tropical Cyclone Surface Wind Predictions Knaff (U. Co) DeMaria (NESDIS) Lawrence Gross Sisko 2 Development of a rapid intensification index for the eastern Pacific basin Kaplan (HRD) Avila Sisko 2 Developing an inner-core SST cooling predictor for use in SHIPS Cione (HRD) Gentemann Kaplan (HRD) Avila, Berg, Sisko, Blake 2

JHT Third Round Projects Dynamical model upgrades, observational, and assimilation projects Proposal TitlePIsTPC POC Hurricane Model Transition to Operations at GFDL/NOAA BenderPasch, Rhome Hurricane Model Transition to Operations at GFDL/NOAA TuleyaPasch Drag Coefficient and Wind Speed Dependence in TCsPowellFranklin Dynamic Initialization to Improve TC Intensity and Structure Forecasts LiouPasch Operational SFMR-NAWIPS Airborne Processing and Data Distribution Products Carswell, Black, Chang Beven, Mainelli, Sisko, Lauer Mapping of Topographic Effects on Maximum Sustained Surface Wind Speeds in Landfalling Hurricanes MillerBeven Assimilating Moisture Information from GPS Dropwindsondes into the NOAA Global Forecast System AbersonFranklin, Blake WSR-88D-derived Diagnosis of Tropical Cyclone Intensity Changes Near Landfall Lee, Harasti Stewart, McAdie Fed

JHT Third Round Projects Intensity, structure, and track projects Proposal TitlePIsTPC POC Improved Statistical Intensity Forecast ModelsKnaff, DeMaria, Kaplan Avila, Sisko Enhancement of SHIPS Using Passive Microwave Imager Data CecilStewart, Sisko Eastern Pacific Ocean Heat Content Estimates for SHIPS Forecasts Shay, DeMaria Avila, Mainelli Continued Development of Tropical Cyclone Wind Probability Products Knaff, DeMaria “Lawrence”, Gross Estimating Tropical Cyclone Wind Radii Utilizing an Empirical Inland Wind Decay Model KaplanStewart, Gross Prediction of Consensus TC Track Forecast Error and Correctors to Improve Consensus TC Track Forecasts GoerssBeven, Gross Development and Implementation of NHC/JHT Products in ATCF Sampson“Lawrence”, Sisko, Gross Fed