ICARD USER FORUM Recommendations and Conclusions (Paris, 20. – 21. September 2010)

Slides:



Advertisements
Similar presentations
AIRWORTHINESS ASPECTS OF AIRCRAFT LEASING
Advertisements

Chapter 6 Sub-Group ICAO Headquarters, November 2013
Presentation of the proposed Annex 19 – Safety Management
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Linn OHLSSON, IATI Secretariat Rudolphe PETRAS, Development Co-operation Directorate, OECD IATI Steering Committee, 3 October 2013 The Common Standard.
Farm Service Agency Lender’s training for Electronic Submission of Guarantee Fees Implementation Date: September 23, 2009.
ICAO USOAP CMA Seminar Exercise 1: LEG/02 – Article 83 bis Group 5 Verónica Decarlos Carlos F. Silva Rueda Ankar Doobay Tomás Abrego Clifford Themen.
ATS Route and Waypoint Implementation:
International Coordinating Council of Aerospace Industries Associations International Coordinating Council of Aerospace Industries Associations (ICCAIA)
Development of WIPOSTAD Progress report by the International Bureau Committee on WIPO Standards Geneva May Anna Graschenkova Industrial Property.
2011 Regional Meetings – St Louis Updated 2012 Volunteer Recruitment System (VRS) Stan Marshall, Jr. Chair National Operations Committee Miho Kikujo Sr.
GLOBALIZATION GROUP Q5. Operational Matters -ICANN Presence Worldwide -Public Comments Process -Languages.
Presentation to: Name: Date: ICAO Asia-Pacific AMHS Activities & Status ICAO Asia-Pacific AMHS Activities & Status ATS Message Handling System (AMHS )
‘One Sky for Europe’ EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 VALIDATION DATA REPOSITORY Overview.
AIS/MAP Seminar Kiev May 2003 EUR/NAT Regional Officer AIS/MET Björn Hellroth EUR/NAT Regional Officer AIS/MET Björn Hellroth.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
2011 Regional Meetings – St Louis Updated 2012 Volunteer Recruitment System Gary Blauth – ADS Pat DiFilippo – PVS.
THE GEO GLOBAL CAPACITY BUILDING SYMPOSIUM Seville (Spain) September 10 & 11, 2007.
Omniran CF00 1 P802.1CF NRM Discussions Date: Authors: NameAffiliationPhone Max RiegelNokia Networks
External examiner induction Alison Coates QA Manager (Validation & Review)
-Honesty-Cooperation-Responsibility-Respect  Established in 2003 by the Ministry of Economy.  Non – profit public institution.  Managing and administrating.
Paediatric Worksharing CMDh participation Work-sharing in Art 45 and 46 procedures Experiences in Art 29 procedures Presidency meeting 29 September 2011.
Slide #1 Computerised Transit Computer System Training Session Trader Application Users.
Projects EMERALD and EMERTA EMERALD WP5 The Specific case of ASAS/ADS-B.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Childcare And Family Information Service Anne Lalley Choice Adviser.
The Critical Evaluation The Critical Evaluation Study Guide & all else.. Click: Contextual Studies Support Files
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
VFR COASTAL WAYPOINT PROJECT ASO-530/AMTI. Objective (Purpose of VFR Waypoints (Advantages (Intended Use of VFR Waypoints (VFR Coastal Waypoint Project.
ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 1 ICAO Five-Letter Name-Code database (ICARD) Nikki Goldschmid, ICAO EUR/NAT.
Setting Up TGO User Accounts. Creating User Accounts for Other Users If your company has other users who need to use the Active Orders system, your company’s.
ECOS Information Session Draft EPA Quality Documents February 13, 2013 Presented by EPA Quality Staff, Office of Environmental Information For meeting.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
CTRP User Call August 6, 2014 Gene Kraus CTRP Program Director.
ICAO EUR/NAT Office GREPECAS CNS/ATM/SG01 (Lima, Peru, March 2010)ICARD Workshop - 1 ICAO Five-Letter Name-Code database (ICARD) Nikki Goldschmid,
TSG-S OMA (Open Mobile Alliance) Ad-Hoc Report Richard Robinson Chair - 3GPP2 TSG-S SC B_Eshwar Pittampalli’s (Lucent) comments/concerns embedded.
© 2012 IBM Corporation 3 rd Party Registration & Account Management 1 1 SMT Post R 4.3 Potential Enhancements.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
The FDES revision process: progress so far, state of the art, the way forward United Nations Statistics Division.
ASAS TN2 Final Seminar Paris, April Jean-Marc Loscos, DSNA chairman of the Airborne Surveillance Subgroup of the Aeronautical Surveillance.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
ENROL PhD PROPOSAL AND SUPERVISORY AGREEMENT THESIS SUBMISSION ORAL EXAMINATION Suspension of study Change of supervisor Study away from Christchurch Extension.
Amway Romania Information about Online registration.
Enhanced Business Name Registration System (EBNRS) Policies Implemented Internal to the System (19 August 2011)
IAVI/DIT BSc (Hons) in Property Studies How to complete the Dissertation Proposal Form.
CAP169 02/04/09. 2 Today  Agree Terms of Reference  Timetable going forward  Discussion of Part 1 and Part 2 Finalise and agree  Discussion of Part.
How to complete and submit a Final Report through Mobility Tool+ Technical guidelines Authentication, Completion and Submission 1 Antonia Gogaki IT Officer.
Cooperative Development of Operational Safety and Continuing Airworthiness Programme COSCAP South East Asia Program Progress Report Discussion Paper 2.
A project funded by the European UnionImplemented by a consortium led by Get ready for the call! Next steps for building partnerships and developing a.
Workshop on preparations for ANConf/12 − ASBU methodology
ATS Route and Waypoint Implementation:
Electronic Filing of Differences(EFOD) System and Filing of Differences Task Force (FDTF) Air Navigation Bureau.
Chisinau, Republic of Moldova 2017
Safeguarding flight data and locating/recovering on-board recorders
5LNC - background information
4 - 8 November 2013 AIM relevant - Assembly conclusions
Chapter 6 Sub-Group ICAO Headquarters, November 2013
GIRO usage and GSICS Lunar Observation Dataset Policy S. Wagner
UK Link Technology Refresh
Roadmap to Enhanced Technical Regulations of WMO
USOAP Continuous Monitoring Approach (CMA) Workshop
Recommendations and Conclusions
RAD Evolution Workshop Network Approach to the RAD - DP/4
PANS-AIM (Doc 10066) Air Navigation Procedures for AIM Seminar
5LNC - background information
Review of the 1958 Agreement
Highlights of the 177th WP.29 session and
Presentation transcript:

ICARD USER FORUM Recommendations and Conclusions (Paris, 20. – 21. September 2010)

The ICARD User Forum noted the successful transfer of the ICARD database from Eurocontrol to the ICAO HQ portal on 27 th August 2010 recalled that there is a requirement for registration of the various user groups according to the new guidelines (multiple LOGIN process), that the full integration of all regional offices will be completed in Dec 2010 (with the current requirements for regional 5LNC coordination unchanged) and that the 5LNC reserve list will be merged into one global list in 1st half of 2011 welcomed the proposed enhancements (e.g. search time reductions and HMI improvement of application) and further development requirements (e.g. algorithm improvements) based on the user inputs (ref. PULSAR paper) 21 September

The ICARD User Forum recalled that the initial scope of the ICARD system was related to the Annex 11 5LNC definitions as outlined in Appendix 2 for the management of aprx LNC and that the ICARD data content should be matched to the national AIPs (and not vice versa) concluded that clarification would be needed for the use of 5LNC or the use of alpha-numerical codes (which is currently outside of the intended ICARD scope) for RNAV/SIDs/STARs together with the related publication process in the national AIP (ENR-ADR section), and that the correction process (i.e. granularity of data/accuracy of coordinates, deviation parameters, etc.) must be specified 21 September

The ICARD User Forum was invited to provide advance feedback on any operational problems that would arise if new letters as prefixes for ATS route designators (letters C, D, E, I, O, X for Nov. 2012) would be introduced to Annex 11, App 1 was informed about the initial results from the ICAO questionnaire on the removal of the distinction (letter U) between lower and upper ATS route designators recalled the existing procedures for coordination of reservation of regional and non-regional ATS route designators through the ICARD RD coordinators reemphasized the application of the procedure for coordination of regional agreement for all ATS routes (regional and non-regional) over the High Seas 21 September

The ICARD User Forum concluded on the 3 step approach for the optimisation of existing ATS route designators : 1.Full re-assessment of the current status of regional RDs and removal of discrepancies 2.Access for route designator reservation should be restricted to the ICAO and RNDSG secretariat for both regional and non-regional reservations, with assurance that the requests (confirmation message to States) will be treated within max 5 working days 3.Establishment of a rationalisation process covering both (regional and non-regional) route designators based on the lists from the assessment. Concerning the use of non-regional RDs for regional purposes, it was noted that these issues will only be addressed after the implementation of changes to Annex 11 in view of the acute shortage of regional RDs in the EUR Region 21 September

The ICARD User Forum concluded also on the procedures for future reservation of regional ATS route designators:  The RD coordinator will upgrade requested RDs to allocated after the AIRAC amendment for the ATS route has been published  In case that the publication has not been done within 6 months and in the absence of any indication of the planned implementation date, the RNDSG coordinator will send out a reminder message to the State/States concerned  For the RDGE coordinator, States are requested to submit the information at RDGE meetings 21 September

The ICARD User Forum recommended that clarifications be provided for the following questions:  What is the time limit for the re-use of released RDs?  Should non-regional RDs be unique world-wide? 21 September

The ICARD User Forum recalled the issues on the duplicated 5LNCs and recommended that coordination with States within other ICAO regions be initiated to achieve the goal of world-wide uniqueness of 5LNCs took note of the problems and potential safety issues with sound-like 5LNCs and agreed that the current system/algorithm needed to be optimised. The immediate enhancements proposed are: –Reduction of search time for 5LNC generation to 1 min (with the possibility to continue upon confirmation) in the random proximity check function and the reduction from 30 to 5 offered codes –Changes to HMI progress box to display a more detailed status information on the random search function –Improvements of the sound like algorithm (based on successful tests with volunteers from States, paying due attention to different language requirements world-wide, against the existing algorithm) 21 September

The ICARD User Forum concluded that there is an increasing demand to use ICARD for additional functions than it had been initially designed for and recommended the urgent establishment of a multi-disciplinary TF to investigate these aspects and to develop requirements in areas such as Point Merge in TMA design, RNAV route design ENR and TMA, FMS development, VFR routes, etc..., including the safety case for establishment of a suitable parameter/radius for search of sound-like 5LNC. States would provide input to the ICAO Secretariat on the possible Terms of Reference of this TF 21 September