Campus Renewal Project Closing of Parkview Place Starting July 7 Date: May 27, 2014.

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Aledo Trail Traffic Control December 19, 2013 P HASE 1 SWITCH TO PHASE 2.
Construction Impacts Overview of Policy Changes Shuttle Changes Enforcement Faculty/Staff Changes Visitor & Event Parking Changes Resident Student Changes.
Moline Bridge Closure Unclassified ZDec09 US Army Garrison – Rock Island Arsenal Moline Bridge Closure.
Directions to Jackson Federal Building and parking.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
Forest Lake EDA Meeting June 27, CR 2 and I-35 Bridge/Interchange First Ave NW (Backage Road) CR 2/Broadway Avenue Roadway Utilities Hardwood Creek.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
How to get from the Nebraska Parking lot to the Mary Graydon Center.
May – August Highway 51 Parking Lot Project The Board of Regents approved replacing the asphalt parking lot by Highway 51 with a concrete.
General Information Check in: Shuster Student Success Center- Room 130 – 9 a.m. check in – Competitions begin at 9:30 a.m. Role Play Holding Room: Columbus.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Presentation to Maxwell Place Homeowners Association 1.
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
2012 Graduation Practice MAY 22 ND. Graduation Day June 18 th – you must arrive by 3:00 pm. Doors will open at 4:00 pm to let your family and friends.
Home QUIZ ON Home 1. Pedestrians Prohibited2. Pedestrian Crossing 3. Men at work4. No standing or stopping.
Directions to Camera Point: From the parking lot, head south along the path until the three way intersection by the restrooms. Turn east and there will.
LMC, Bethesda Maps 01/21/ LMC, Bethesda Maps 01/21/ Lockheed Martin Headquarters 6801 Democracy Center 6901 ROCK SPRING DR OLD GEORGETOWN.
TAKE EXIT 38 FROM I-84 Westbound TAKE EXIT 39 FROM I-84 Eastbound.
Signs, Signals and Pavement Markings
INTERSECTION SAFETY PERFORMANCE AND AUDIT Andy Loonan Basak Aldemir-Bektas Intersection: Welch Avenue & Lincoln Way.
Student(s) Drop Off and Pick Up Our goal is to make the school community safer.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Simulated Incident Event Message Exchange and Flow SCENARIO: INTERSECTION INCIDENT Situation: At 1:15 pm, July 28, 1999, a pickup truck turning off the.
ILLINOIS DEPARTMENT OF TRANSPORTATION Improving Safety For Incident Responders Illinois Department of Transportation Update: June 2010 MODULE 4 MODULE.
Driving Directions You may take 470 northbound, just after exiting the airport (see map), and follow it northwesterly 18.5 miles to I-25. User without.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Life Support Capital Project Community Meeting June 17, 2015.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
How would a truck get through? Any suggestions?. No parking allows access.
Directions To at the South Texas Centre AT&T Building, Suite US Highway 90 West
6-Answers-1 LOW COST SAFETY IMPROVEMENTS Practitioner Workshop Exercise – Part A – Session #6.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
Pierce Butler Lexington Parkway Bicycle Connection Presented by: Mr. Michael Recycles Bicycles Sponsored by: Mr. Michael Recycles Bicycles District 11.
JULY 4 TH 2014 LOCATION: SAVORY STATE PARK. HOUSE OF PANCAKES 231 Center AVENUE Flurry, NEW YORK BREAKFAST WILL BE SERVED FROM: 8:00 A.M. TO 10:00 A.M.
Traffic Signs Part Two. What do these 2 signs tell you?
SPEED TABLES FOR CORONADO ROAD BETWEEN 7 TH STREET AND 10 TH STREEET.
S ATURDAY, M AY 21, 2016 | 11:00 AM N IKON AT J ONES B EACH T HEATER Molloy College COMMENCEMENT.
Overall Concept: The purpose of the wall escort is to bring the wall into Marquette through the local area and advertise the start of the four-day Wall.
City Manager Report – May, 2016 Presented to: Minot City Council City Manager Report – May, 2016 Presented to: Minot City Council Lee Staab, City Manager.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Proposed Route Modifications
Directions to 2nd Street Gate
Swampscott Station Inbound/Outbound:
General Manager Logistics Systems UK
June 5, 2017.
Center City Connector 101.
June 26, 2017.
PEDESTRIAN + CROSSWALK = STOP!
Runners will line up on Erie, south of Marine Dr.
Thornbury Road new green-man cycle and pedestrian crossing
USMC CBRN School MARDET
USMC CBRN School MARDET
USMC CBRN School -Using Apple Maps or Google Maps search “USMC CBRN School” Main Gate to Missouri/Constitution Ave. After 3d Traffic Signal, and Stop Sign.
Directions from Highway 40 Westbound
AB 57, Exit Worringen / Sinnersdorf
Missouri Veterans Home
Stop.
Signs, Signals, and Road Markings
Missouri Veterans Home
Work Hours: Monday – Saturday, 5:00 a.m. – 3:30 p.m.
M14A/D Select Bus Service
Harbour Island Force Main Replacement
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
Project Location. Cambridge/Arlington Intersection Reconstruction Public Information Meeting June 16, 2015.
Utility Relocation: 11th/Mill
Presentation transcript:

Campus Renewal Project Closing of Parkview Place Starting July 7 Date: May 27, 2014

Parkview Closing 2

Parkview Closing Key Points 3 Parkview will close at Kingshighway July 7 for up to two years. Center for Advanced Medicine (CAM) patients will detour one block north to Forest Park Avenue to access valet/drop off and the North Garage. Parkview will be one way eastbound from the CAM valet/drop off exit to the east CAM valet improvements were implemented earlier this month. Two left turn lanes from Euclid to westbound Forest Park Avenue and restricted pedestrian access on the west side of Euclid will improve exiting traffic. Patient/visitor communications have started and include outbound calls and mailings with maps and directions. A toll-free number is being considered for patients to call if they are running behind. SLCH dock will remain accessible.

Changes at Euclid and Forest Park Ave. 4 Two left turn lanes will take exiting vehicles from Euclid to Forest Park Ave. Pedestrians will have to cross Forest Park Ave. on the east side of Euclid. Work will start the week of June 2 and take place nights and weekends

SLCH Dock and Ambulances to CAM 5 SLCH dock will remain open Delivery trucks and ambulances will use access road south of Parkview Between 6 a.m. and 6 p.m., deliveries restricted to UPS, FedEx sized trucks Between 6 p.m. and 6 a.m., larger trucks will deliver to SLCH dock MICUs will be relocated Truck access only to dock Truck and ambulance route only