Colorado Space Grant Consortium Gateway To Space ASEN 1400 / ASTR 2500 Class #24 Gateway To Space ASEN 1400 / ASTR 2500 Class #24 T-16.

Slides:



Advertisements
Similar presentations
Mechanical Systems Analysis Branch/Code 542 Goddard Space Flight Center Analysis of Damping Treatments Applied to the MAP Spacecraft Scott Gordon Code.
Advertisements

Magnetic Vibration Damper for Space Applications Planning Concept Developme nt DesignFabrication Test & Verification Mission: To develop a prototype of.
System Identification of a Nanosatellite Structure Craig L. Stevens, Jana L. Schwartz, and Christopher D. Hall Aerospace and Ocean Engineering Virginia.
May 14th, 2010 FMSTR. The Problem and Proposed Solution No current, acceptable solution exists to determine liquid volume in a tank exposed to microgravity,
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #27 Gateway To Space ASEN / ASTR 2500 Class #27 T+9.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #22 Gateway To Space ASEN / ASTR 2500 Class #22 T-2.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #25 Gateway To Space ASEN / ASTR 2500 Class #25 T+3.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #02 Gateway To Space ASEN / ASTR 2500 Class #02.
Paul “Trey” Karsten Marcell Smalley Shunsuke Miyazaki Brynn Larson Terek Campbell Marcus Flores 11/25/09 Final Revision.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #05 Gateway To Space ASEN / ASTR 2500 Class #05.
Team Name Final Presentation Team Members Date Fall 2010 Rev A
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #28 Gateway To Space ASEN / ASTR 2500 Class #28.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #21 Gateway To Space ASEN / ASTR 2500 Class #21.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #23 Gateway To Space ASEN / ASTR 2500 Class #23.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #23 Gateway To Space ASEN / ASTR 2500 Class #23.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #31 Gateway To Space ASEN / ASTR 2500 Class #31.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #27 Gateway To Space ASEN / ASTR 2500 Class #27 T+3.
1 Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #09 Gateway To Space ASEN / ASTR 2500 Class #09.
Gateway to Space AJ - 1 Mechanical System Design & the StarLight Project Andy Jarski Mechanical Systems Engineer Ball Aerospace & Technologies.
Team Name Launch Readiness Review Team Members Date Fall 2011 Rev A
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #22 Gateway To Space ASEN / ASTR 2500 Class #22.
Team Name Final Presentation Team Members Date Rev
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #23 Gateway To Space ASEN / ASTR 2500 Class #23.
Constellation Orion Visible Light Constellation Orion Infrared Light.
1 Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #08 Gateway To Space ASEN / ASTR 2500 Class #08.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #30 Gateway To Space ASEN / ASTR 2500 Class #30.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #24 Gateway To Space ASEN / ASTR 2500 Class #24.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #9 Gateway To Space ASEN / ASTR 2500 Class #9.
Miscellaneous: - We will be going directly back to campus - After a few relief stops - Check for final launch NO/GO status at after 9:00.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #20 Gateway To Space ASEN / ASTR 2500 Class #20.
Today’s APODAPOD  Read NASA website:  solarsystem.nasa.gov solarsystem.nasa.gov  IN-CLASS QUIZ THIS FRIDAY!!  Solar Lab, Kirkwood, Rooftop this week.
Student Satellite Project University of Arizona Team Goals Design, Fabricate, and Analyze a Structure that will Support the Payload –Space Allocation of.
1 NASA’s Goddard Space Flight Center 2005/4/14 LRO/CRaTER Technical Interchange Meeting LRO Mechanical Systems Giulio Rosanova / /
Rockets Tuesday: Rocketry Wednesday: Meet in my room 601: hydrogen demo and Quiz over rocketry. Thursday: Satellites and Orbital Mechanics Friday: Satellites,
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
Determinate Space Frame Telescope Structures for SNAP Bruce C. Bigelow University of Michigan Department of Physics 7/28/04.
Space Grant Supported Student Space Hardware Programs in Alabama.
Colorado Space Grant Consortium Gateway To Space ASEN 1400 / ASTR 2500 Class #06 Gateway To Space ASEN 1400 / ASTR 2500 Class #06 T-79.
Colorado Space Grant Consortium Gateway To Space ASEN 1400 / ASTR 2500 Class #17 Gateway To Space ASEN 1400 / ASTR 2500 Class #17 T-39.
Structures and Mechanisms Subsystems AERSP 401A. Introduction to Structural Estimation Primary Structure: load-bearing structure of the spacecraft Secondary.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #23 Gateway To Space ASEN / ASTR 2500 Class #23 T-4.
Vibration Isolation Box Design a system for dampening out the vibrations associated with launch and landing for a box that will fit inside a middeck locker.
MAVEN MARS ATMOSPHERE AND VOLATILE EVOLUTION.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
Colorado Space Grant Consortium Gateway To Space ASEN 1400 / ASTR 2500 Class #21 Gateway To Space ASEN 1400 / ASTR 2500 Class #21 T-25.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #30 Gateway To Space ASEN / ASTR 2500 Class #30 T+12.
FTC Home Page FTC Game Page FTCGAMEPAGEFTCGAMEPAGE.
Sea Launch/Zenit Thrust: 8,180,000 N Fueled Weight: 450,000 kg Payload to LEO: 13,740 kg Cost per launch: $100,000,000 Cost per kg: $7,300 Launches: 31/28.
DemoSat IV: Metro Triple Threat Metropolitan State College of Denver Matt Hanley David Fifield Jason Igo Evan I Spitler Devlin Thyne Matt Hanley David.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #05 Gateway To Space ASEN / ASTR 2500 Class #05.
LRR Schedule: 09:45Flight ClubFlight Club 09:51SCREAMSCREAM 09:57DSRODSRO 10:03Done.
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Chris Pasma, SSL Mechanical.
The Drag and Atmospheric Neutral Density Explorer (DANDE) Body Mounted Solar Arrays for a Low Cost Nanosatellite Kyle D. Kemble Colorado Space Grant Annual.
Welcometo GEEN 2850 / 4850 ASTR 2840 Independent Study Colorado Space Grant Consortium April 16, 2001.
Introduction to MAVEN Dave Brain LASP / University of Colorado On behalf of the MAVEN team.
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
Overview 3 2 Introduction Design Analysis Fabrication Testing
Spacecraft Structures
Newton’s Second Law of Motion
Integration and Test Organization Chart
Gateway To Space T-32 ASEN / ASTR 2500 Class #13
System Identification of a Nanosatellite Structure
Gateway To Space ASEN / ASTR 2500 Class #12
Structures March 13, 2004.
FRIDAY SLIDES TEMPLATE
RockOn... A Sounding Rocket Payload Workshop
Gateway To Space ASEN / ASTR 2500 Class #12
Gateway To Space ASEN / ASTR 2500 Class #14
Presentation transcript:

Colorado Space Grant Consortium Gateway To Space ASEN 1400 / ASTR 2500 Class #24 Gateway To Space ASEN 1400 / ASTR 2500 Class #24 T-16

-Announcements - Guest Lecture – Spacecraft Structures -Launch is in 16 days Today:

4 Announcements… Propulsion Talk… - What did you think? Design Document Rev C - Due at 12 PM Launch Readiness Review - Due at 7 AM - Presentation order… > 8, 6, 7, 3, 5, 1, 2, and 4 - Template on the website

Test Results (3 minutes) –Prove your project is ready for flight –Heart of your presentation –Show test data (graphs, charts, etc) that are labeled, with key events indicated –Structural tests should be included but equal time should be devoted to mission/science tests (present mission/science test first) –Proof should be shown that you have actually recorded, off-loaded, and analyzed your data

6 Announcements… Ready for Flight Cards - Don’t lose this only copy - Must turn in on 11/30 - Use as a checklist - Follow it exactly - Not fully completed, your team doesn’t fly

Colorado Space Grant Consortium Tuesday 11/27… LRR Presentations Presentations due 7:00 AM 4 days to launch Tuesday 11/27… LRR Presentations Presentations due 7:00 AM 4 days to launch

Colorado Space Grant Consortium Thursday 11/29… Launch Logistics Friday meeting time sign up 2 days to launch Thursday 11/29… Launch Logistics Friday meeting time sign up 2 days to launch

Colorado Space Grant Consortium Friday 11/30… BalloonSat Turn in RFF Cards Turn in 30 minute turn in times Completed by 3:00 PM 1 day to launch Friday 11/30… BalloonSat Turn in RFF Cards Turn in 30 minute turn in times Completed by 3:00 PM 1 day to launch

Colorado Space Grant Consortium Saturday 12/01… Launch! Leave Boulder at 4:45 AM Arrive ~5:45 AM Saturday 12/01… Launch! Leave Boulder at 4:45 AM Arrive ~5:45 AM

Colorado Space Grant Consortium T-16 Mission Simulations ASEN 1400 / ASTR 2500 Class #24 Mission Simulations ASEN 1400 / ASTR 2500 Class #24

Payload Handlers: - Bring you payload to the front of the class - Tell us about - Demo something with it - Let them run for until ~10:35

Colorado Space Grant Consortium Spacecraft Structures Heather Reed LASP (Laboratory of Atmospheric and Space Physics) Spacecraft Structures Heather Reed LASP (Laboratory of Atmospheric and Space Physics)

Spacecraft Structures Heather Reed Mechanical Engineering Manager Laboratory for Atmospheric and Space Structures

What is a structure? Why does a spacecraft need a structure? PRIMARY or Secondary?

23 Nov 15 th, 2012 Spacecraft Structures Heather Reed, ME Manager Lifecycle of a Structure REQUIREMENTS (NEEDS) DESIGN ANALYSIS BUILD TEST INTEGRATION STUDENT NITRIC OXIDE EXPLORER (SNOE)

24 Nov 15 th, 2012 Spacecraft Structures Heather Reed, ME Manager REQUIREMENTS What does this spacecraft structure need to do? Accessability Lift points –Vibe –Acoustic –Shock »Thermal »Radiation ROCKET LAUNCH GROUND TESTING ON-ORBIT CONDITIONS

25 Nov 15 th, 2012 Spacecraft Structures Heather Reed, ME Manager DESIGN – What shape will it be? SNOE was a “spinner”

26 Nov 15 th, 2012 Spacecraft Structures Heather Reed, ME Manager DESIGN – What will it be made out of? Materials selection –Stiffness vs. Strength Car suspension – STRONG CAR, weak connection to the road –WEIGHT  CHEAPEST RIDE TO SPACE = $35,000 per lb –Cleanliness Specific plastics only Materials that can be scrubbed Aluminum is a great material

27 Nov 15 th, 2012 Spacecraft Structures Heather Reed, ME Manager DESIGN – How will it be built? Manufacturability –Strongest structure is all one piece –How easy is it to assemble? –Primary structure $$ < 1% of SNOE mission budget ($8M)

28 Nov 15 th, 2012 Spacecraft Structures Heather Reed, ME Manager SPACECRAFT ROCKET NOSECONE ROCKET SECONDARY STAGE DESIGN – Will it fit? Solid Modeling

29 Nov 15 th, 2012 Spacecraft Structures Heather Reed, ME Manager Solid Modeling - SolidWorks

30 Nov 15 th, 2012 Spacecraft Structures Heather Reed, ME Manager ANALYSIS - Modal Simulation Results Mode 2 – 821 Hz – Mode shape plot Rocking in the Y-direction Mode 6 – 1270 Hz – Mode shape plot Rocking in the X-direction 821 Hz: First predicted high mass participation mode. 741 Hz: Lowest frequency mode is a local connector bracket mode. Z-axis has very little mass participation below 2000 Hz. Two principal mode shapes shown below:

31 Nov 15 th, 2012 Spacecraft Structures Heather Reed, ME Manager BUILDING IT – Your best laid plans Fabrication – Do 2 planes meet perfectly?

32 Nov 15 th, 2012 Spacecraft Structures Heather Reed, ME Manager Why TEST? Vibration Testing Thermal Vacuum Testing Acoustic Testing Shock Testing Strength Testing NASA Goddard Gold Rules: TEST AS YOU FLY, FLY AS YOU TEST

33 Nov 15 th, 2012 Spacecraft Structures Heather Reed, ME Manager TESTING – Vibration Testing Mass model testing – Good practice Test sensors - Accelerometers LARGE SPEAKER “VIBE TABLE” AT BALL AEROSPACE SNOE SPACECRAFT

34 Nov 15 th, 2012 Spacecraft Structures Heather Reed, ME Manager TESTING – Thermal Vacuum More heat without air – Electronics Thermal expansion – Causing binding More friction without air – Moving parts HOT/COLD Operational and Survival limits SNOE SPACECRAFT LARGE TANK “RAMBO” AT BALL AEROSPACE

35 Nov 15 th, 2012 Spacecraft Structures Heather Reed, ME Manager INTEGRATION to the Pegasus

36 Nov 15 th, 2012 Spacecraft Structures Heather Reed, ME Manager Secondary Structure – Solar Arrays

37 Nov 15 th, 2012 Spacecraft Structures Heather Reed, ME Manager Heather Reed, CU Mechanical Eng 97’ Work during Undergrad studies, BS ME in 1995 –Space Grant College –NIST, NDE lab –CU football & basketball security –Hart Ranch snack shop Work during Grad studies on SNOE, MS ME in 1997 –FEA, Solar panel substrate, Nutation damper, Torque rods, Thermal blankets Employed at LASP after graduation ME Manager in 2001, 8 ME’s then, 23 ME’s now Current program is MAVEN, mission to MARS Program Management on grants

The PF Package Langmuir Probe and Waves (LPW) – LASP / SSL LPW/Extreme Ultra-Violet (LPW-EUV) – LASP LPW-EUV

39 Nov 15 th, 2012 Spacecraft Structures Heather Reed, ME Manager Testing Engineering Unit testing –Mechanism Life Testing – Vibe, Life Test cycling –Luxel filter qualification – Vibe, thermal cycles –Light leak testing –Torque margins –Spring force –Magnetic field Flight Unit testing –Vibe test Random Vibe, response limit Strength verification = ? –Mechanism Run-in Torque margins Spring force –Light leak testing

40 Nov 15 th, 2012 Spacecraft Structures Heather Reed, ME Manager Aperture Mechanism Life Test Plan 30V 22V 30V 36V 22V 30V 36V 22V 30V 36V 30V 200 Cycles 4280 Cycles -5°C -35°C 35°C 50°C