Oak Ridge Prioritization Project CRESP David Kosson, Vanderbilt University Charles W. Powers, Vanderbilt University Joanna Burger, Rutgers University James.

Slides:



Advertisements
Similar presentations
Contaminant Fate WG 5 Year Plan RMP CFWG Meeting January 15, 2008.
Advertisements

An Alternative Energy Solution for Medical Waste The Easy Fit.
RAF Technical Overview
Process and Procedure Documentation. Agenda Why document processes and procedures? What is process and procedure documentation? Who creates and uses this.
PBT – P2 Preventing Pollution: A Tool to Reduce and Eliminate Persistent Toxic Substances in the Great Lakes Basin.
Near Surface Disposal Facilities
1 Transuranic Waste Processing Center Karen Deacon, Deputy Federal Project Director Oak Ridge Office of Environmental Management.
BoRit Superfund Site Timeline
1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.
ADA Technologies, Inc. Stabilization of Mercury and Mercury Containing Waste Cliff Brown / Tom Broderick ADA Technologies, Inc. Carl Ragan Perma-Fix Environmental.
Note: See the text itself for full citations. Information Technology Project Management, Seventh Edition.
The Massachusetts Approach to Power Plant Clean-up Policy Making and Standards Setting to Reach Clean Air Sonia Hamel Massachusetts Executive Office of.
Overview of Key Rule Features
1 Module 1 INTRODUCTION TO DECISION ANALYSIS. 2 Introduction To Decision Analysis Learning Objectives Reasons for studying decision analysis Basic sources.
APPLICATION OF A RISK-BASED DECISION SUPPORT TOOL FOR EVALUATING AVIATION TECHNOLOGY INTEGRATION TO A CONTROLLED-FLIGHT-INTO-TERRAIN ACCIDENT by Denise.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Integrated Risk Management Charles Yoe, PhD Institute.
TRP Chapter Chapter 1.1 Introduction. TRP Chapter Why raise hazardous waste management standards? To reduce risks of inadequate controls on.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
The Risk Management Process
Risk Analysis And New Innovations
61 What is hazard risk management?. 62 Emergency risk management is “a systematic process that produces a range of measures that contribute to the well.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Guidelines for State School Environmental Health Programs EISA Sec. 504.
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
Linking Objectives to Programs EPA Regions 9 & 10 and The Federal Network for Sustainability.
Control Selection Techniques Employed for D&D Projects with Emphasis on Nuclear Criticality Safety Controls Brenda L. Hawks Engineering Director Oak Ridge.
Capability Cliff Notes Series HPP Capability 1—Healthcare System Preparedness What Is It And How Will We Measure It?
Storm Water Pollution Prevention Training
Basics of OHSAS Occupational Health & Safety Management System
Environmental Management Systems A Postal Service Strategy May 16, 2006 Environmental Management Systems A Postal Service Strategy May 16, 2006 CHARLES.
Tailings and Waste Rock Management Alternatives Study
RBES Guiding Principles The Department will comply with the requirements of the nation’s environmental laws and regulations. However, the requirement to.
World Bank Annual Meeting Policy Forum – October 10 th, 2013 Environmental and Social Assessment and Management: Strengthening all levels of the Integrated.
Management & Development of Complex Projects Course Code MS Project Management Perform Qualitative Risk Analysis Lecture # 25.
DFA Capital Management Inc. DFA vs. ERM Is There A Difference? CAS Special Interest Seminar Understanding the Enterprise Risk Management Process San Francisco,
1 The Use of Institutional Controls Under the RCRA Corrective Action Program.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
1 Characterizing Mercury Waste at DOE’s Sites & Developing Management Strategies Breaking the Mercury Cycle Conference Boston MS May 1-3, 2002 Mike Morris,
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
Understanding Activities, Aspects, and Impacts in the EMS.
Howard Schaller PSMFC Annual Meeting September 24, 2013 Comparative Survival Study Outcomes – Experimental Spill Management 1.
CSS Oversight Committee ISAB November 15, 2013 Comparative Survival Study Outcomes – Experimental Spill Management 1.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
Recommendations for Developing Effective Risk Management Policies for Contaminated Site Cleanup An Overview of Risk Management Concepts and How Risk Management.
Reduction of Mercury in Products Action Plans. 2 Action Plan  describes the activities to be carried out and the related implementation strategies for.
Preliminary Analysis of Alternatives for the Long Term Management of Mercury John Vierow Science Applications International Corp. Reston, VA May 1, 2002.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
The Risk Management Process
Sustainability Elements of the ARRA, and Getting the Most out of Stimulus Funding Jeannie Renne-Malone, LEED AP National Director – Climate Change & GHG.
Engineering | Architecture | Design-Build | Surveying | Planning | GeoSpatial Solutions November 16, 2015 THE AWWA J100 - WHAT IT IS, WHY IT IS BEING UPDATED,
Some Comments on Risk-Based End States & Contaminated Site Cleanup Session 17 Waste Management 2004 Tucson, Arizona March 2, 2004 Charles W. Powers, PI.
Session Chair:David Ward, Loudoun Watershed Watch Panelists:Gem Bingol, Piedmont Environmental Council Joe Ivers, PhD, Virginia Waters and Wetlands, Inc.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
UNIT 9 Hazardous Wastes and Risk Assessment. Major Public Agencies Involved in Environmental Health Risk Assessment and Intervention Consumer Product.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Integrated Planning and Financial Capability 1 David W. Smith, Manager NPDES Permits Section EPA/Region 9.
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
1 TenStep Project Management Process ™ PM00.4 PM00.4 Project Management Preparation for Success * Manage Issues *
Environmental Acquisition Strategy Performance-Based Contracting
Ranjan kumar Assistant Manager CCL,Ranchi
Oak Ridge Office of Environmental Management Update
Indian and Northern Affairs Canada
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Purpose To address the hazards to human health and the environment presented.
Risky Business Standalone ISO9001:2015 Risk-Based Thinking and Integration of Risk Management with ISO9001:2015.
Module 5 Improvement/upgrade plan
A New Concept for Laboratory Quality Management Systems
State University of Telecommunications
Presentation transcript:

Oak Ridge Prioritization Project CRESP David Kosson, Vanderbilt University Charles W. Powers, Vanderbilt University Joanna Burger, Rutgers University James Clarke, Vanderbilt University Steven L. Krahn, Vanderbilt University Michael Gochfeld, UMDNJ-Robert Wood Johnson Medical School Henry Mayer, Rutgers University Kevin Brown, Vanderbilt University 11/13/20151 DRAFT - DRAFT - DRAFT - DRAFT

The Evolution of Needed Concepts

Hazard Consequences Hazard Urgency Pathways Urgency Hazard Occupational Public Cost Time needed to complete Urgency Project Sequencing Project number a Likelihood, vital, importance, priority, significant, ECOECO Consequences Fundamental Risk Evaluation = Building a Risk Prioritization Tool and Process 11/13/20153DRAFT - DRAFT - DRAFT - DRAFT

Questions asked of every project Can you standardize/simplify the answers to the Risk Questions?

5 + ETTP GW Treatability Study

VHMH HLMH/VH*VH ConsequenceMLMMM/H** LLLLL LMHVH Pathway Oak Ridge Prioritization – Integration of Hazard, Pathway and Consequence ratings There really are a modest number of real possibilities and they can be linked to a series of clarifying questions for every OR EM project type *VH if Hazard=VH **H if Hazard=VH

Problem / Project Definition(s) Narrative Project Summary Very High (VH) MHVH High (H) LMH/VHVH Medium (M) LMMM/H Low (L) LLLL Consequence Pathway Low (L) Medium (M) High (H) Very High (VH) Low (L) Medium (M) High (H) Very High (VH) Risk Rating Bins for Problems / Projects Risk Rating 11/13/20157DRAFT - DRAFT - DRAFT - DRAFT

8 Risk Reduction Effectiveness Capacity Efficiency & Sequencing Availability of Disposition Options Workforce What risk reduction can be achieved? Project Sequencing Project Cost Mortgage Reduction Cost of Delay Linking Risk Evaluation with Risk Management to Inform Prioritization 11/13/2015DRAFT - DRAFT - DRAFT - DRAFT

Low (L) Medium (M) High (H) Very High (VH) Risk- Rated Problems / Projects Low (L) Medium (M) High (H) Very High (VH) Multiple Project Option for Risk Mitigation Evaluation of Risk Mitigation Options Risk Reduction Effectiveness Risk Management – Step 1 Risk Management 11/13/20159DRAFT - DRAFT - DRAFT - DRAFT

Low (L) Medium (M) High (H) Very High (VH) Risk Reduction Effectiveness Low (L) Medium (M) High (H) Very High (VH) Capacity Efficiency (Modifiers +/−) +⁞−+⁞− +⁞−+⁞− 0 +⁞−+⁞− +⁞−+⁞− +⁞−+⁞− +⁞−+⁞− Capacity Efficiency Risk Management - Step /13/201510DRAFT - DRAFT - DRAFT - DRAFT

Option: Low Medium High Very High Option’s Risk Importance Rank Option’s Risk Reduction Rank Option’s Capacity, Efficiency, &/or Sequencing Implement ability Risk-Informed Priority Summary How do you “combine” the results to prepare to make a risk-informed judgment ? 11/13/201511DRAFT - DRAFT - DRAFT - DRAFT

Low (L) Medium (M) High (H) Very High (VH) Risk- Rated Problems / Projects Low (L) Medium (M) High (H) Very High (VH) Sequencing Project Elements Impedes Risk Mitigation Evaluation of Risk Mitigation Options Risk Reduction Effectiveness Low (L) Medium (M) High (H) Very High (VH) Capacity Efficiency/Sequencing (Modifiers +/−) +⁞−+⁞− +⁞−+⁞− +⁞−+⁞− +⁞−+⁞− +⁞−+⁞− +⁞−+⁞− +⁞−+⁞− +⁞−+⁞− Capacity Efficiency Risk Management Its complexities Risk Management Mercury at EFPC Y-12 D&D (e.g., Beta 4) Soils? Flow Augmentation Y Flow X Y Flow 11/13/201512DRAFT - DRAFT - DRAFT - DRAFT

Low (L) Medium (M) High (H) Very High (VH) Risk- Rated Problems / Projects Low (L) Medium (M) High (H) Very High (VH) Project Elements for Risk Mitigation Evaluation of Risk Mitigation Options Risk Reduction Effectiveness Low (L) Medium (M) High (H) Very High (VH) Capacity Efficiency (Modifiers +/−) +⁞−+⁞− +⁞−+⁞− +⁞−+⁞− +⁞−+⁞− +⁞−+⁞− +⁞−+⁞− +⁞−+⁞− +⁞−+⁞− Capacity Efficiency Tri-Party Prioritization (DOE-TDEC-EPA) Exogenous Factors Risk and Risk Management Risk Management Stakeholders and Tribes 11/13/201513DRAFT - DRAFT - DRAFT - DRAFT

Unknown unknowns - e.g., Characterization studies The concept of set-asides to reduce uncertainty when risks may or may not be High but evaluation impossible due to data gaps / or that the situation may be evolving – and in either case there is a sound “method” or activity that reduces the uncertainty. How should the tool address these cases? Mitigation Option Effectiveness - e.g., treatability studies 11/13/201514DRAFT - DRAFT - DRAFT - DRAFT

Low (L) Medium (M) High (H) Very High (VH) Risk- Rated Problems / Projects Low (L) Medium (M) High (H) Very High (VH) Project Elements for Risk Mitigation Evaluation of Risk Mitigation Options Risk Reduction Effectiveness Low (L) Medium (M) High (H) Very High (VH) Capacity Efficiency (Modifiers +/−) +⁞−+⁞− +⁞−+⁞− +⁞−+⁞− +⁞−+⁞− +⁞−+⁞− +⁞−+⁞− +⁞−+⁞− +⁞−+⁞− Capacity Efficiency Tri-Party Prioritization (DOE-TDEC-EPA) Exogenous Factors Risk and Risk Management Risk Management Stakeholders and Tribes 11/13/201515DRAFT - DRAFT - DRAFT - DRAFT

Mercury at Oak Ridge Redbreast Sunfish

Mercury at Oak Ridge

Y-12 Buildings 51,000 lbs to air NPDES Leaks and spills 428,000 lbs to soil/rocks East Fork Poplar Creek 240,000 lbs to creek EPA freshwater criterion of 0.3 ppm in fish Total Inventory to Oak Ridge = 24,000,000 lbs Not accounted for = 1,300,000 lbs They account for = 2,034,000 lbs

Mercury at Oak Ridge HAZARD - MERCURY 600,000+ pounds under & in Y-12 PATHWAY - Complete to eco-receptors top trophic –level fish fish consumers Complete on & off-site CONSEQUENCES – Neurological and other Interdiction Projects Capacity & Workforce Sequencing, costs Total Source Reduction Y-12 Building Removals & Soil Remediation High Vary by Risk Reduction Effectiveness $52M Several Years at $1.8B

Project ElementCost Risk Reduction Effectiveness Capacity & Efficiency Overall Risk Mgmt Rating WEMA Storm Sewer: cleaning and re-lining of the West End Mercury Area $16MHigh+1Very High 163 Area Hg flux control: Installation of water treatment system $8MHigh+1Very High Principal Threat Source Soil Excavation: Exposure unit 9 of the Y-12 facility $15MLow0 UEFPC Streambed: excavation, dewatering and disposal of mercury $10MHigh+1Very High Flow Augmentation Relocation: establish control systems to enable management of the flow volume introduced to UEFPC to minimize transport of sediment bound mercury $3MMedium+1High Mercury at Oak Ridge