14 TH Commercial sub-committee meeting UI &REC Audit Talcher II scheduling SEM DATATransmission pricing AMR Others.

Slides:



Advertisements
Similar presentations
Sharing of ISTS Charges & Losses Regulation
Advertisements

Load Management System
ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
FREQUENCY SPECTRUM FROM AUGUST 06 TO OCT 06 (UPTO 20 TH OCT 06) < 49.0 HZ< 49.5 HZ< 50.0 HZ HZ>50.2HZ>50.5 HZ Aug
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
1.Meter installation database and its up-dating on a regular interval. 2.Meter testing details and last testing done 3.Downloading of data and transmission.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
Module on Computation of PoC Transmission Charges
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
1. 2 ENERGY MANAGEMENT SYSTEM AN OVERVIEW AN OVERVIEW.
1. Metering philosophies adopted in SR a.Generally the HV side of ICTs b.Some places the line side c.Tertiary loading of transformers is done at POWERGRID.
Billing, Collection and Disbursement Procedures
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
23 rd Commercial sub-committee meeting on
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
Monitoring Information System Greece Working Group Meeting Brussels, June 2000 STRUCTURAL FUNDS
14 TH Commercial sub-committee meeting UI &REC Audit Talcher II scheduling SEM DATATransmission pricing AMR Others.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
Queries raised by Director (Tariff) on ARR and Tariff Application of SLDC for FY on
Commercial Points for 93 rd OCC meeting. Change in Bank a/c New Account for Deviation Settlement opened in Axis Bank Name of the A/C : Power System Operation.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
Anil Thomas Asst. Executive. Engineer Southern Regional Power Committee Central Electricity Authority.
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI& Reactive charges Tamilnadu to pay 100Crs. as UI charges and 2Crs. as Reactive.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI & Reactive charges Tamilnadu still to pay 74Crs. as UI charges during
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
NLDC 1 Ancillary Services in Indian Context. NLDC 2 Outline Definition Drivers for Ancillary Services Ancillary Services in Indian Context.
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
Renewable Regulatory Fund (RRF):- Implementation Mechanism
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
POWER GRID CORPORATION OF INDIA LTD
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
UI POOL FINANCIAL SETTLEMENT & PAYMENT SECURITY OPTIONS.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
Transmission Tariff V.Balaji Chief Manager SRLDC.
Issues related to UI pool. Payment to pool account by KPTCL and Pondy Till June 2010 payment to UI pool by KPTCL and Pondy was through cheque/DD. Pondy.
Issues for discussion ON INTERTRIP SCHEME AT TALCHER II Present Scheme has worked satisfactorily as per the Logic designed On number of occasions unit(s)
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
Commercial Issues for 73 nd OCC TN opened LC for Rs.5Crs for UI payment delays during TN to enhance the LC amount to 32.84Crs as per their liability.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Point of connection Mechanism
S V.MOUNICA 09551A0294.  To increase the distribution rate of present electric supply which is 70% to 100%.  Improving the supply to house holds without.
ERRA Workshop on Regulatory Monitoring of the Electricity Sector Almaty, Kazakhstan, January 31 – February 2, Improvement of market relations in.
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
LOAD FLOW STUDIES TO DURING THE ABOVE PERIOD FOR EACH YEAR AND EACH QUARTER IN EACH YEAR MAXIMUM AND MINIMUM FREQUENCY OF A DAY.
What is ASEMR /ASKUE/ and the Need for Its Implementation
Queries raised by Director (Tariff) on ARR and Tariff Application of SLDC for FY on
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
Scheduling of Collective Transactions Through Power Exchange
Hon’ble Commission has issued Interim order dated 19/ directing :
Congestion regulations
Presentation transcript:

14 TH Commercial sub-committee meeting UI &REC Audit Talcher II scheduling SEM DATATransmission pricing AMR Others

Audit of SR UI & Reactive accounts Reconciliation statement sent on Response received from NLC stg I &II,NLC I Expn,TNEB,KPTCL,KSEB Reconciliation statement for Oct 10 also sent on

Scheduling of Talcher stg II Clause 6.4 of IEGC The national interconnected grid is divided into control areas, like Regional ISTS, States, DVC, etc. where the load dispatch centre or system operator of the respective control area controls its generation and/or load to maintain its interchange schedule with other control areas whenever required to do so and contributes to frequency regulation of the synchronously operating system. The Load Despatch Centre of a control area therefore is responsible for coordinating the scheduling of a generating station, within the control area, real time monitoring the station’s operation, checking that there is no gaming (gaming is an intentional mis-declaration of a parameter related to commercial mechanism in vogue, in order to make an undue commercial gain) in its available declaration or in any other way revision of availability declaration and injection schedule, switching instructions, metering and energy accounting, issuance of UI accounts within the control area, collections/disbursement of UI payments,outageplaning etc.

SRLDC as the control area: Benefits Control area definition An electrical system bounded by interconnections (tie lines), metering and telemetry which controls its generation and/or load to maintain its interchange schedule with other control areas whenever required to do so and contributes to frequency regulation of the synchronously operating system. Minimal to and fro co-ordination between RLDC’s and SLDc’s in case of scheduling process involving surrender,recall etc. Less time in to and fro communication

Right from planning to implementation Tal II is apart of SR system. Only geographically located in ER system SR boundary is upto Talcher AC I/C & Jeypore end of Gazuwaka line In analogy to 6.4.2c(iii) of IEGC and SoR of IEGC 2010 in para 41.13, the control area jurisdiction of Talcher-II shall be with SRLDC as more than 50% share is to SR constituents.SoR of IEGC 2010 In case of Open Access transaction also the nodal RLDC is that of importing region. On same Anology SRLDC is nodal agency for Talcher-II It plays a vital role in the LGBR of SR SPS already in place for eventualities like unit /pole tripping. Present system is working fine for over 8 years. Scheduling of Talcher stg II

SEM STATUS Installation of standby SEMs for NLC feeders: As decided in the Special Committee meeting at Neyveli, SEMs are to be installed by NLC and TNEB at the remote end of 220kV feeders emanating from TS-II stage I. Its more than 6 months but the SEMs are yet to be installed. The status may please be intimated. SEM Time drift monitoring: Time drift monitoring /correction report from following sites not being received LocationUtility LocationUtility MamidapallyAPTRANSCO GutturKPTCL Mehaboobnagar-do- Nelamangala-do- Vemagiri-do- Hoody-do- Chittoor-do- Kadakola-do- Tandur-do- Sedam-do- Sulurpet-do- Bellary-do- Malkaram-do- Konaje-do- Kakatiya TPSAPGENCO Ambewadi-do- AlamathyTNEB Yerandanahally-do- S.P.Coil-do- RaichurKPCL Arni-do- BTPS-do- Acharapakam-do- MAPSNPC Teni-do- Thiruvalam-do- Kuzhithurai-do-

Proposal for automatic data reading (AMR) /collection : To avoid delays in SEM data transmission to SRLDC it is proposed to adopt AMR scheme in SR at an estimated cost of Rs.1.5Crores.Schematic representation of AMR is as below.delays in SEM data transmission Hardware required for each location: Modem-1 no, Data Concentrator Unit-1 no Local Computer- 1 no., Remote Computer at SRLDC – 1 no. Cost of Communication on GPRS mode : as per actual.

Sl. No.Description Qty. *Unit Rate Rs ** Amount Rs. A For S/S with meters located in Control Room (Aprox. 120 S/S) # 1) All required hardwares i.e. Meter Interfacing Unit/Protocol Comnverter/Optical Probe/ Connectors / Cable for data transfer between meters and Data Concentrator etc. 700Per SEM )Data Concentrator Unit/Data Accumulator (one No. at each location) 120No ) GPRS Modem (One No. at each location) 120No B Common for total Scheme 1) Meter Data Acquisition & Analysis software (For all Data Concentrator Units/Data Accumulators (Approx. 120 Nos.) and Servers at SRLDC (2 Nos.). 1 Lumpsu m ) Training to personnel posted at all S/S where scheme will be commisioned and SRLDC. (10 Trainings with a batch of participants) 10No )Installation, Testing & Commissioning/Customization cost 700Per SEM C CENTRAL LOCATION (AT SRLDC) 1) Central server (Including cost of required RDBMS & OS) 1No ) UPS (2 KVA) 1No ) GPRS/GSM Modems 1No.6500 D Wararnty / AMC 1) Warranty for 1 year NIL 2) AMC for 1st year after Warranty 700Per SEM ) AMC for 2nd year after Warranty 800Per SEM ) AMC for 3rd year after Warranty 900Per SEM ) AMC for 4th year after Warranty 1000Per SEM Total Bill of Quantities

SR DICs to furnich the following for CERC Regulations on Transmission Pricing: a) Entire 110kV network data. b) Wind injections at 110kV level. c) Commissioning dates of all the generating stations, lines and transformers as per Format II. d) Geographical map and a single line diagram showing the network connectivity and voltage levels. e) Data of new projects being commissioned in the current and next Financial year. Long Term/ Medium Term Contracts in Format- IIIA Nodal Injections of MW/MVAr upto 110kV level in Format-IIIB

Transferring funds to PSD Fund: As per the decision of First meeting of Management Committee for Power System Development Fund an amount of Rs.364.crores from Regional UI pool and Rs 60laks from Reactive pool totalling to Rs cr transferred to Power System Development fund. Opening of LC for UI payment delays : KPTCL opened LC APTRANSCO, Pondicherry & Goa still to open irrevocable LC for delayed payments during year KSEB also to open LC for delayed payment during year Registration of Users of SRLDC: Registration as users still to be completed by Ramagundam stg III, Talcher stg II,MAPS, KGS I&II..