What will LP-SPL & PS2 provide for the LHC Michael Benedikt for LP-SPL and PS2 Working Groups Chamonix 2010.

Slides:



Advertisements
Similar presentations
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Advertisements

2nd EuroNu Plenary Meeting Review of CERN Proton Driver bunch compression studies 02/06/2010M.M. - EUROnu1.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
1 Chamonix 2010 Summary of Session 7: Future Upgrade Scenarios for the Injector Complex P. Collier /BE (V. Mertens /TE) Chamonix Summary, 5th Feb 2010.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
F Project X Overview Dave McGinnis October 12, 2007.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
HL-LHC/LIU Joint workshop Goal: Progressing towards an agreed set of 450 GeV beam parameters for High Luminosity operation in LHC after LS2 & LS3. Slides.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
12/10/05NuPAC – CERN 2005M. Benedikt 1 Potential future proton beam performance at CERN for HIE ISOLDE, n_TOF phase 2 and EURISOL Michael Benedikt AB Department,
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
COMPASS Meeting 2/07/2004 R. Garoby1 RECOMMENDATIONS OF THE HIP WORKING GROUP* *
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Linac4 Status 1 M. Vretenar sLHC public event
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Content  The LHC beams produced  LINAC2 & PSB  The PS  The SPS  Super Cycles and N0n-LHC physics  Conclusions IEFC Workshop, 8 March 2012 Rende.
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
J.M. Jowett, S. Maury, PANIC05 HI Satellite meeting, 23/11/ LHC as a Heavy-Ion Collider An update John M. Jowett, Stephan Maury I-LHC Project CERN.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
Optics considerations for PS2 October 4 th, 2007 CARE-HHH-APD BEAM’07 W. Bartmann, M. Benedikt, C. Carli, B. Goddard, S. Hancock, J.M. Jowett, A. Koschik,
Optics solutions for the PS2 ring February 11 th, 2008 LIS Section Meeting Y. Papaphilippou.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
PS2 beam parameters and proposal for aperture strategy M. Benedikt , PS2 meeting1Beams and apertures, M.Benedikt.
Beam Manufacture in PS2 M. Benedikt, S. Hancock. LHC Beams in the PS by 2015 Typeh injε l inj [evs] h ejN bunch ej RF ej [MHz] ε l ej [evs] τ ej [ns]
Operation Status of the RF Systems and Taiwan Photon Source
Report Technical Director Storage-Ring-Installation Completed
Linac4 M. Vretenar for the Linac4 design team
Alternative/complementary Possibilities
Alternative/complementary Possibilities
Plans for ions in the injector complex D
Other Scenarios for a partial Upgrade of the Injector Complex C
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Superbeams with SPL at CERN
Plans for new LHC injectors R. Garoby
Progress towards Pulsed Multi-MW CERN Proton Drivers
Advanced Research Electron Accelerator Laboratory
Generation of Higher Brightness Beams for LHC
SLHC-PP kick-off meeting, CERN 9 April 2008
Joint session – Beta-beams
The SPL-based Proton Driver at CERN
JLEIC ion fullsize booster (2256m) space charge limit (Δν=0
JLEIC 200 GeV Ion Injector Chain and Bunch Formation
LHC Machine Advisory Committee, CERN 12th June 2008
HE-JLEIC: Do We Have a Baseline?
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

What will LP-SPL & PS2 provide for the LHC Michael Benedikt for LP-SPL and PS2 Working Groups Chamonix 2010

Contents –Injector complex upgrade: LP-SPL & PS2 scenario –LP-SPL & PS2 main parameters and LHC beam performance –Implementation in accelerator complex and commissioning –Construction schedule and cost estimate –Operation aspects –Conclusions 2Chamonix 2010M. Benedikt

Motivation for LP-SPL & PS2 upgrade Improve reliability of injector chain for LHC era –Ageing accelerators, operating far beyond initial parameters and stretched to their limits to reach ultimate performance. –Complex operation requiring manpower intense tuning and very special expert knowledge and hardware –Efficient exploitation of high energy machines requires injector complex with sufficient performance margin Need for new accelerators designed for the needs of (s)LHC Remove main performance limitation –Excessive incoherent space charge tune spreads  Q SC at injection in the PSB (50 MeV) and PS (1.4 GeV) because of the high required beam brightness N/  *. Need to increase the injection energy in the synchrotrons 3Chamonix 2010M. Benedikt

1.Division by 2 of the intensity in the PSB (one bunch per ring and double batch filling of the PS) 2.Increase of the injection energy in the PS (from 1 to 1.4 GeV) 3.Quasi-adiabatically splitting of each bunch 12 times in the PS to generate a train of bunches spaced by 25 ns 4.Compression of bunches to ~4ns length for bunch to bucket transfer to the SPS 5.Stacking of 3-4 PS batches in the SPS and acceleration to 450 GeV 40 MHz RF 1.1 × ppb & 20 MHz RF 2.2  ppb 10 MHz system RF = 9.18 MHz 4.4  ppb 10 MHz system RF = 3.06 MHz 13.2  ppb Triple splitting at 1.4 GeV Quadruple splitting at 25 GeV PS injection: 3+3 bunches in 2 batches Empty bucket Acceleration to 25 GeV PS ejection: 72 bunches in1 turn 320 ns beam gap 6 bunches on h=7 18 bunches on h=21 72 bunches on h=84 40 MHz + 80 MHz RF Complication in operation: 25 ns bunch train production in PS complex 4Chamonix 2010M. Benedikt

LP-SPL & PS2 design goals For LHC operation –Significantly increased beam brightness –Flexibility for generating various bunch spacings and bunch patterns –Reduction of SPS injection plateau and LHC filling time General design goals –High reliability and availability –Simplification of operation schemes for complete complex –Reduced beam losses in operation for complete complex –Potential for future upgrades of the accelerator complex and future p+ (non-LHC) physics programmes 5Chamonix 2010M. Benedikt

Injector complex upgrade – proton operation Linac4: H- Linac (160 MeV) LP-SPL: Low Power- Superconducting Proton Linac (4 GeV) PS2: High Energy PS (4 to 50 GeV – 0.3 Hz) SPS+: Superconducting SPS (50 to1000 GeV) sLHC: “Superluminosity” LHC (up to cm -2 s -1 peak) DLHC: “Double energy” LHC (1 to ~14 TeV) PSB SPS SPS+ Linac4 LP-SPL PS LHC / sLHC DLHC Output energy 160 MeV 1.4 GeV 4 GeV 26 GeV 50 GeV 450 GeV 1 TeV 7 TeV ~ 14 TeV Linac2 50 MeV Proton flux / Beam power PS2 Stage 1: Linac4 - construction 2008 – 2014 Stage 2: PS2 and LP-SPL: preparation of Conceptual Design Reports for - project approval mid start of construction begin Chamonix 2010M. Benedikt

SPS PS LHC / SLHC Output energy for Lead ions 72 MeV/n 5.88 GeV/n GeV/n 177 GeV/n 2.76 TeV/n Linac3 4.2 MeV/n Linac3: Heavy Ion Linac LEIR: Low Energy Ion Ring PS2 LEIR 135 MeV/n Pb 27+ Pb 54+ Pb 82+ Injector complex upgrade – ion operation 7Chamonix 2010M. Benedikt

Performance requirements and parameters Starting point for the design is brightness (N/  n ) for LHC beams –Design goal: Twice higher brightness than “ultimate” 25ns beam with 20% intensity reserve for transfer losses 4.0  ppb = 2  1.7   1.2 in transverse emittances of 3  m Transfer energy LP-SPL – PS2 –Determined by the beam brightness of the LHC beam –Limiting the incoherent space charge tune spread at injection to below 0.2 requires 4 GeV injection energy PS2 Extraction energy –Injection into SPS well above transition energy to reduce space charge effects and TMCI –Higher energy gives smaller transverse emittances and beam sizes and therefore reduced injection losses –Potential for long-term SPS replacement with higher energy ~50 GeV extraction energy 8Chamonix 2010M. Benedikt

LHC beams from SPL & PS2 (i) Nominal bunch train at PS2 extraction –h=180 (40 MHz) with bunch shortening to fit SPS 200 MHz. –168 buckets filled leaving a kicker gap of ~ 300 ns (50 GeV!) Achieved by direct painting into PS2 40 MHz buckets using SPL chopper. No sophisticated RF gymnastics required. Beam parameters –Extraction energy: 50 GeV –Maximum bunch intensity: 4E11 / protons per LHC bunch (25 ns) –Bunch length rms: 1 ns (identical to PS) –Transverse emittances norm. rms: 3  m (identical to PS) –Alternatively “low-emittance” beams e.g. 1.7  in ~1.5  m Any other bunch train pattern down to 25 ns spacing –Straightforward with SPL 40 MHz chopping and PS2 40 MHz system Again without sophisticated RF gymnastics 9Chamonix 2010M. Benedikt

LHC beam from PS2 (ii) Example 25 ns beam from LP-SPL – PS2: –PS2 will provide “twice ultimate” LHC bunches with 25 ns spacing –Bunch train for SPS twice as long as from PS –Only 2 injections (instead of 4) from PS to fill SPS for LHC –PS2 cycle length 2.4 s instead of 3.6 s for PS Reduces SPS LHC cycle length by 8.4 of 21.6 s (3x3.6 – 1x2.4) Reduced LHC filling time 1 2 Booster SPS injection plateau 3x3.6 s = 10.8 s up to 4 consecutive injections 1 2 Booster PS LP-SPL SPS plateau ~2.4 s 2 injections PS2 10Chamonix 2010M. Benedikt

LP-SPL – block diagram & beam parameters Kinetic energy (GeV)4 Beam power at 4 GeV (MW)0.12 Rep. period (s)0.6 Protons/pulse (x )1.1 Average pulse current (mA)20 Pulse duration (ms)0.9 LP-SPL beam characteristics 11Chamonix 2010M. Benedikt

PS2 main parameters ParameterunitPS2PS Injection energy kineticGeV Extraction energy kineticGeV Circumferencem Max. bunch intensity LHC (25ns)ppb4.0 x x Max. pulse intensity LHC (25ns)ppp6.7 x x Max. pulse intensity FTppp1.0 x x Linear ramp rateT/s Repetition time (50 GeV)s~ /2.4 Max. stored energykJ80070 Max. effective beam powerkW35060 In comparison with PS: line density x 2, circumference x 2, energy x 2 12Chamonix 2010M. Benedikt

Implementation and commissioning 1.Staged CE work (cf. SPS – TT40) –Excavation and CE work in parallel to operation for SPL tunnel, LP-SPL to PS2 TL, PS2 ring and injection/extraction cavern –CE connection between TT10 and PS2 cavern during shutdown (~ 4 months) for ion injection line and extraction channel of all beams towards SPS Dismantling/protection of ~100 m of TT10 equipment in the 2 regions concerned Physical tunnel connection & CE work Installation of removable (RP) shielding in tunnel connection Reinstallation of (old) TT10 equipment 2.Commissioning of LP-SPL & PS2 in parallel to physics with PS complex –LP-SPL commissioning from Linac4 with every 2 nd pulse (2 Hz operation) –PS2 commissioning with H- from LP-SPL –Alternatively low int. PS2 commissioning with p from PS complex via TT10 Requires earlier installation of new TL from TT10 to PS2 (can be accommodated in normal shutdown) Would allow also commissioning with ions from LEIR/PS via TT10 13Chamonix 2010M. Benedikt

Implementation and commissioning 14PAC 2009 VancouverPS2 Design Optimization, M.Benedikt PS2 LP-SPL Linac4 LP-SPL to PS2 PS PS/LEIR to SPS / PS2 SPS PS2 to SPS 2 Hz Linac4 operation with destinations PS-Booster and LP-SPL Every other pulse for LP-SPL commissioning PS2 commissioning with LP-SPL beam TT10 to PS2

Putting SPL & PS2 in operation for physics (i) Assumptions –Most SPS upgrades have taken place independently of the construction and setting up of LP-SPL & PS2 (see SPS Upgrade Working Group) e-cloud mitigation possibly new RF system, internal dump, etc. –LP-SPL & PS2 have reached performance identical to top-performance of the Linac4 – PSB – PS injector complex in stand-alone commissioning Remaining SPS and TT10 modifications –Removal of shielding in the two TLs between PS2 and TT10 –TT10 beam line rearrangement and installation of new elements from/to PS2 –Replacement of SPS injection system with new 50 GeV injection system Kickers and septa Cabling and services PFNs and converters –Normal shutdown of > 4 months is considered compatible with these modifications (preparation in preceding shutdowns) 15Chamonix 2010M. Benedikt

Putting SPL & PS2 in operation for physics (ii) SPS injection and TT10 commissioning –New TL PS2 – SPS, TT10 modifications and SPS 50 GeV injection system –Short duration expected since only TL modification and new injection system. –Ion injection line & PS2 fast injection commissioning can be done with ions/protons from PS (possibly already earlier if TL is installed) Further increase of LP-SPL, PS2 and SPS performance to its final level will take place in parasitic mode in parallel to physics operation. All construction, integration beam commissioning and switch to operation of the chain LP-SPL & PS2 can be done in parallel to physics operation, using “normal-length” shutdowns. –No specific requirements on LHC planning and injector chain availability for LHC operation. 16Chamonix 2010M. Benedikt

LP-SPL & PS2 Prelminary Project Schedule 17Chamonix 2010M. Benedikt

LP-SPL Cost estimate Item Cost (MCHF) RF equipment (80 klystrons for 160 b=1 cavities + 66 IOTs for 66 b=0.65 cavities + power supplies, waveguides, LLRF, interlocks & controls, etc.) and 2 test places for cryomodules % Civil Engineering (underground & surface buildings) + cooling/ventilation & electrical infrastructure % Cryomodules (20 cryomodules with 8 b=1 cavities + 11 cryomodules with 6 b=0.65 cavities tuners & couplers + 80 quadrupoles + 30 BPMs) % Cryogenics (6.4 kW at 4.5 K + distribution) % Dumps (~1.4 and 4 GeV) and ejection system to ISOLDE (20 ms rise/fall time deflection system + stripping foil and H0 dump) % Beam instrumentation (transformers, beam loss monitors, laser wire profile monitors, screens…) % Controls (including machine interlocks) % Accelerator vacuum (including isolation vacuum in cryomodules) % Safety & access (monitors, alarms, access doors with control system) 30.6 % Magnets (normal conducting in the transfer line + power supplies) % TOTAL % 18Chamonix 2010M. Benedikt

PS2 Cost estimate Item Cost (MCHF) Civil Engineering (underground work PS2 & related TLs & surface buildings, environment shaping) % Main magnets (main dipoles, 4 types of main quadrupole magnets, dipole correctors, quadrupole correctors, skew quadrupoles, chromaticity and resonance sextupoles, octopoles) % RF equipment ( MHz tuneable system: cavities + power supplies, waveguides, LLRF, interlocks & controls, etc., transverse dumper system) % Injection and extraction elements, tune kickers, dump kickers and dump lines, PFNs for fast kickers and bumpers, electronics and controls, cabling % Technical infrastructure (electrical distribution, cabling, cooling and ventilation, piping, plants, access control, safety, heavy handling) % Transfer lines (SPL to PS2 (H-), existing TT10 to PS2 (ions from LEIR), PS2 to SPS and PS2 to and injection dump); all equipment included (scaled from CNGS transfer line) without CE % Power converters (main converters, auxiliary correction magnets converters, septa converters) % Vacuum system (coated vacuum chambers, ion and NEG pumps, cabling, bakeout equipment) % Beam instrumentation (110 beam position monitors, 250 fast beam loss monitors, wire scanner, dc and fast BCTs, wall current monitors, tune measurement, controls and electronics, cabling % Control system (control HW and software, racks, interlock system, timing system, cabling) % Collimation and machine protection (primary and secondary collimators & masks for TLs and PS2) 61.5 % TOTAL % 19Chamonix 2010M. Benedikt

Cost estimate summary 20 Cost comparison LP-SPL with SNS Linac: –A comparison of the estimates for RF, cryomodules and cryogenics has been made with the corresponding figures from SNS: LP SPL: 304 MCHF (63% of total LP SPL material cost) SNS: 378 MCHF (includes manpower cost) –SNS number is 20% larger than the CERN estimate, but it includes manpower and it assumes an RF system capable of 6% duty factor instead of 0.04% The LP-SPL estimate is credible! Total material cost estimate for LP-SPL, PS2 and SPS upgrade (~65 MCHF, see SPSU WG) is around 1000 MCHF (incl. FSU, consultancy). Manpower resources: –Estimated manpower for PS2 construction: ~ 700 FTE (~110 MCHF, 585 k/my or 400 k/my without CE+TI) –Assuming similar ratio M/P for LP-SPL and SPS gives: ~ 900 FTE (~140 MCHF) Total cost for LP-SPL, PS2 and SPS upgrade (P&M) is around 1250 MCHF. Chamonix 2010M. Benedikt

Failures (first 2 years) [Stuart Henderson (SNS), SNS AAC, Feb. 24, 2009 ORNL] Klystron Modulators + Ring kickers HV MEBT Amplifiers + 3 klystrons change LEBT valve Operation aspects (1/2) SPL reliability: lessons from SNS –Apart from conventional causes, the main sources of problems are with HV systems and RF, linked to high duty cycle, stressing the equipment (HV, modulators, RF) The LP-SPL will be easier/better than SNS because of the low duty factor –The SC cavities and the cryogenics system do not contribute noticeably High availability can be expected from LP-SPL 21Chamonix 2010M. Benedikt

Operation aspects (ii) - PS2 and summary PS2 operation aspects –Important simplification of many operational aspects compared to PS No transition crossing with NMC Direct painting of LHC bunch structures – no complex RF manipulations –Strong impact on requirements on equipment, tuning, expert know-how, beam losses, beam availability, etc. General aspects –The present injector complex operates close to (or at) its limits for LHC –LP-SPL and PS2 will allow simpler operation, provide sufficient margin and flexibility to fully exploit LHC Simpler tuning and easier maintenance of beam quality, better availability Reduced (manpower) requirements on operation and expert teams –One circular machine & injection/extraction/transfer systems less in the chain –Machines will be built with new equipment, using state-of the art technology, operating well below limits, with high multiplicity and well documented. Positive impact on component and machine availability. Reduced (manpower) requirements for maintenance and HW teams Simplified spare part management 22Chamonix 2010M. Benedikt

Conclusions LP-SPL & PS2 upgrade has been designed to provide large flexibility and operational margin for full exploitation of the LHC with large potential for upgrades. Total material cost ~1000 MCHF, total manpower cost ~250 MCHF Integration and commissioning can be done without impact on LHC operation using “normal” shutdowns. Reliable and state-of the art equipment with high multiplicity for efficient maintenance and spare policy and manpower resources Significant simplification of operation processes minimizing breakdowns, beam quality fluctuations and operator intervention and tuning needs. The new injector complex will be a solid basis for future proton operation and upgrades at CERN offering large potential and flexibility for LHC and other applications. 23Chamonix 2010M. Benedikt

Reserve slide High intensity physics beam for SPS –SPL & PS2 provides up to twice line density of PS high-intensity beam –Twice circumference gives up to~4 times more intensity in total ~1.0E14 per PS2 cycle (~8E13 with a longer kicker gap) –Five-turn extraction will fill SPS with single shot instead of two from PS Twice more intensity in SPS via twice higher line density. No injection flat bottom in the SPS (two shot filling from PS presently) –Clean bunch to bucket transfer PS2 40 MHz to SPS 200 MHz (cf. LHC) ~6E11 protons per PS2 40 MHz bucket  1.2E11 in every fifths SPS 200 MHz bucket (extraction kicker gap by leaving buckets unfilled at PS2 injection) SPS 23 micros PS2 = 15/7PS = 15/77 SPS 2/77 SPS non-filled because of geometry (0.6 micros) 5 gaps for LSS4 extraction kicker rise/fall (1 micros) 24Chamonix 2010M. Benedikt