Ala-Tom Facilitator Report April 2013. Statewide Representation.

Slides:



Advertisements
Similar presentations
Charlotte-Mecklenburg Storm Water Services Welcomes ASU and the Town of Boone To Our Side of the Storm (How to manage the “perfect Storm”)
Advertisements

Shingle Creek and West Mississippi Watershed Management Commissions Third Generation Watershed Management Plan.
Negotiating our Water Future in Colorado & the Colorado River Basin Colorado’s Water Plan & the Colorado Basin Plan February 2015 Update Presentation developed.
Project Ranking Results Presented at the 8 th Stakeholder Meeting Hal Bryson, EEP Western Watershed Planner January 12th, 2010.
What is a Watershed? A watershed is the area of land where all water drains to a common body of water such as a river, lake or stream.
Talbot County, Maryland FY 2016 Budget Introduction April 14, 2015 FY 2016 Proposed General Fund Budget $78,640,000.
Friday, October 20 th Bus pick up – Student Life Center – 5:10pm Bus drop off – Student Life Center – 11:00pm (In case of rain/ snow, event will be cancelled.
RIPARIAN TREE PLANTING City Stream Watch SAWMILL CREEK Phase II Rehabilitation Project.
Elkhorn Slough King Tide Citizen Science Monitoring Goal: to obtain repeat photographs of the same sites over time, so we can track variation in water.
The Story of the Hunting Creek Watershed. Hunting Creek is Impaired.
Presented at the Alabama Historical Association 2012 Annual Meeting April 14, 2012, in Huntsville, Alabama by Raven Christopher, Archaeologist University.
Wisconsin’s Citizen-Based Stream Monitoring Program enter your local program information here.
Directions to Starting Point: Our starting point was near a drain that sticks out from the ground like a cement stump on our left side of the trail, that.
Location Coal Creek upstream of Coal Creek Parkway Photo Point 5A Camera Point 5 Bearing 192 ° Goal Monitor log movement Duration 5 years Regime 2 times.
Location West Tributary Kelsey Creek Photo Point 5A Camera Point 5 Bearing 20 ̊ Goal Monitor stream restoration project Duration 10 years Regime 1 time.
Insert Photo Here And mark any obvious features in the photo that are discussed in the camera point description 342°
Camera Point #4 Photomonitoring Project Coal Creek 10/14/08.
Insert Photo Here And mark any obvious features in the photo that are discussed in the camera point description.
Idaho's Climate and Water Resource Forecast for the 2008 Water Year Sponsored by: The Climatic Impacts Group at the University of Washington and the.
Directions to Camera Point: From the parking lot, head south along the path until the three way intersection by the restrooms. Turn east and there will.
Stormwater Outlets Effectiveness of the Options. Stormwater Outlets Several options are available, such as the infiltration basins under the parking lots.
Lessons from Chesapeake Bay Restoration Efforts Understanding the role of nutrient reduction activities in improving water quality.
How to use the Alabama Rain Barrel Project to reach your community with the Non-point Source Message.
Economic Benefits of DRGR Land Use Change July 2014.
Community Based Restoration Initiatives in East Central Alabama Eve Brantley, Alabama Cooperative Extension System Charlene LeBleu, Auburn University,
Kara Salazar Center for Earth and Environmental Science Indiana University-Purdue University Indianapolis
November 2, A teachers life is wonderful! –Solid foundation –Clear identity –Tranquility (in the eye of any storm) –Ability to handle surprises.
To benefit the Boone Watershed and to build an Environmental Education Park at Sinking Creek.
Tar-Pamlico Watershed Assessment. Proposed Water Quality Improvement Projects Improvement project types Model scenarios Targeted projects Stakeholder.
Thursday, February 6, 2014 Westbury High School Lecture Hall Facilitators: Mrs. Sotelo and Ms. Bradley.
ALABAMA-TOMBIGBEE CWP FACILITATOR REPORT July 2015.
STATUS OF GREEN LAKE. Status of Green Lake Lake Management Plan Approved Lake Management Plan Approved Three Grants Awarded Three Grants Awarded.
Friends of Marsh Creek Watershed “ C r e e k s C o n n e c t C o m m u n i t i e s ”
About Me By: Lisa Verbosky. Who I Am… I am originally from Erie, Pennsylvania and moved to Riverview, Fl when I was 8 years old. I am someone who loves.
EPA and Flood Risk – Programs and Perspectives Rob Wood Acting Deputy Office Director Office of Wetlands, Oceans and Watersheds U.S. Environmental Protection.
Quarterly Update February 2, Have formed a committee with the local Master Gardeners Group to increase sustainability of project in Montogmery.
BOOKER CREEK WATERSHED PLAN WATERSHED ASSESSMENT WETLAND ASSESSMENT POLICY FRAMEWORK.
Stormwater Management for Homeowners. Where does water go?
Good Morning! Today is ______________________. Pumpkins are ______. We can use them to make ______ and other food. You can cut a cheerful ______ on a pumpkin.
Rain Barrels and Cisterns What are they? How can we use them? How can we get one?
NOAA, National Weather Service Middle Atlantic River Forecast Center Briefing 11:30am June 7, 2013.
Pine Lake Restoration Society Planning – 2010 and Forward.
Nutrient and Sediment Loading in Sougahatchee Creek and the Impacts on Aquatic Biota Report submitted to West Point Stevens and the Cities of Auburn and.
Water is way more complicated than H 2 0 Be prepared to come up with some questions when you see a big ?
Campus Change: Help Manage Construction Impacts ▸ General Academic Building No. 1 construction to begin in spring semester ▸ Plans are underway to close.
Tom Bolt - NMGV Hampton Roads AREC Joint Master Gardener Project – Water Stewart Training.
JULY 4 TH 2014 LOCATION: SAVORY STATE PARK. HOUSE OF PANCAKES 231 Center AVENUE Flurry, NEW YORK BREAKFAST WILL BE SERVED FROM: 8:00 A.M. TO 10:00 A.M.
View of Big Wave Project From Highway 1 and North Capistrano Existing View Phase 1 and 2 (2 years from Permit): First 16 Units, Kitchen, Dining, Living,
Land. Here are some pretty hills. It takes a long time to hike (or walk) up a hill.
New Covenant School Inc.. * Marsha’s standard office hours for February & March will be: * Tuesdays from 9 to 3 * Fridays from 9 to 4:30 * Sandy’s standard.
The Big Event 2016 INFORMATION FOR THE 2016 BIG EVENT DATE: APRIL 2 ND, 2016 LOCATION: DONALD. L. TUCKER CIVIC CENTER.
Grand Canyon Fourth Grade Field Trip Friday, April 29, 2016.
I&E Meeting Online April 11, 2016 New Covenant School Inc.
What you need to know about the Big Event…. Our Mission The mission of “The Big Event” is to serve every Northwest High School resident, regardless of.
 Dubuque County Annual Review Eric Schmechel Urban Conservationist Dubuque SWCD.
6/27/ Armistead Pointe Park – City Council Work Session City of Hampton. Guernsey Tingle Architects. 22 January 2014.
Davidson Creek Park – Caldwell, TX Davidson Creek Park – Caldwell, TX
Rain Barrel Workshop Saturday, April 18, 2015.
Washington County Parks and Open Spaces
Thornton Creek Begins at North Seattle: Managing Stormwater Runoff
Wetlands.
Beargrass Creek page 24.
2017 SAVE OUR STREAMS MONITORING REPORT SML WATERSHED
February 4, 2016 Groundswell Teacher PD Day
FIELD TRIP TO GENEVA GENERATION FACILITY
Phone: Conference: M-12:55-1:40 T/W- 12:05-12:50 TH 8:05-8:45 F- 9-9:45 Week of May 8,2017 5/11- Elementary Field.
Water Runoff and its Effects at Holy Cross
2017 SFEG Restoration Update
Nonpoint Source Program
Beautiful Edessa.
Presentation transcript:

Ala-Tom Facilitator Report April 2013

Statewide Representation

NRCS Stream Priority List-alabama basin  Urban Impacted Streams: Galbraith Mill-10 pts Caney Branch-10 Baldwin Slough-7  Ag/Forestry Impacted Streams Headwaters Pintlala Creek-14 Upper Pintlala Creek-14 Catoma Creek- Antioch Branch-12  Aquatic Resources Headwaters Bogue Chitto Creek-16 Upper Bogue Chitto Creek-16 Tayloe Creek-16

NRCS Stream Priority List-tombigbee basin  Urban Impacted Streams: Musgrove Creek-14 Shumalla Creek-14 Wahalak Creek-7  Ag/Forestry Impacted Streams Factory Creek-16 Bilbo Creek-7 Orphans Creek-7  Aquatic Resources Sanusi Creek-5 Lazy Creek/Bear Creek-5 Studhorse Creek-5

Business Breakfast  Please RSVP by April 26,Paige at MA (334)  May 1 st  7:15-8:30  Alabama Activity Center  Jeff Downes-Speaker  218 Invitations  Montgomery Water Works sponsoring breakfast  Invitation list available  Tell me TODAY if I need to add someone to the invitation list.

NEMO-April 19th  Cancelled due to low turnout

Genetta Wetlands Project  Plants have been added.

Montogmery Bioretention Basin  Have a few plants that need replacing  Have monitored and drains very well  Will work with City to keep watered this summer if necessary

Cypress Creek/Swamp  COE still working on feasibility of creek restoration.  GMC working with ALDOT on several options of restoration credit

Cypress Nature Park Annual Spring Walk About  9:00 AM Saturday, April 20, 2013  Meet at Parking Lot at end of Communications Parkway off of North Ripley/Lower Wetumpka Road  Two Tours: (a) Bill Campbell will lead a 1 ½ - 2 hour expedition to show and name all of plant and animal life and the wetland area and three big ravines. (b) Robert Cope will lead a truck ride and walking tour of the principal highlights, including Cypress Swamp, the three big ravines, scenic views within the park and panoramic views from the high bluffs above the park.  We suggest the following: Hat, Outdoor or athletic shoes, Mosquito spray, Camera, Long sleeves, Water, Walking stick

Funds  Facilitation: $5,  Rain Barrel Project: $5,  Project Funds:$3,411.75

Rain Barrel Workshops  Two spring workshops  April 13 and May 5 with Tallapoosa  Had 25 people at last weeks workshop  Around 15 already signed up for May