Doc.: IEEE 802.22-11/0116r0 Submission September 2011 Ranga Reddy, SelfSlide 1 Overview of MIB Updates September 2011 Interim IEEE P802.22 Wireless RANs.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0003r0 Submission January 2013 S. Filin H. Harada, NICTSlide 1 Introduction to Contributions Notice: This document has been prepared.
Advertisements

Doc.: IEEE /90r0 Submission Nov., 2012 NICTSlide b NICT Proposal IEEE P Wireless RANs Date: Authors: Notice: This document.
Doc.: IEEE /0930r0 Submission July 2006 Nancy Cam-Winget, Cisco Slide 1 Editor Updates since Jacksonville Notice: This document has been prepared.
Doc.: IEEE /02r0 Submission January 2013 Ranga Reddy, SelfSlide 1 January 2013 TGa Review IEEE P Wireless RANs Date: Authors:
Doc.: IEEE /0094r0 Submission November 2009 Steve Shellhammer, QualcommSlide 1 Comments on PAR Notice: This document has been prepared.
Doc.: IEEE /1451r1 Submission September 2006 T. K. Tan, Philips Slide 1 WNG SC Report Notice: This document has been prepared to assist IEEE
Doc.: IEEE /1212r0 Submission TGT and MEF Liaison Notice: This document has been prepared to assist IEEE It is offered as a basis for.
Doc.: IEEE /0220r0 Submission March 2005 Peter Ecclesine, Cisco SystemsSlide Liaison Report Atlanta Notice: This document has been prepared.
Doc.: IEEE /0032r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE P Motions at the March 2012 Plenary EC Closing Meeting IEEE P
Coexistence Motions for LB84 Comment Resolution
[ Interim Meetings 2006] Date: Authors: July 2005
IEEE WG Status Report – July 2005
LB73 Noise and Location Categories
LB73 Noise and Location Categories
SG CUB Tentative Timeline
WRAN Protocol Reference Model(PRM)
Waveform Generator Source Code
March 2014 Election Results
TGp Closing Report Date: Authors: July 2005 Month Year
TGp Closing Report Date: Authors: July 2007 Month Year
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
November Opening Report
Motion to accept Draft p 2.0
[place presentation subject title text here]
Descriptive Language Usage in TGv
(Presentation name) For (Name of group) (Presenter’s name,title)
IEEE P Motions July Plenary EC Closing Meeting
TGp Motions Date: Authors: November 2005 Month Year
On Coexistence Mechanisms
WRAN Protocol Reference Model(PRM)
TGu-changes-from-d0-02-to-d0-03
TGp Closing Report Date: Authors: May 2007 Month Year
On Coexistence Mechanisms
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGv Redline D0.06 Insert and Deletion
Experimental DTV Sensor
IEEE WG Opening Report – July 2008
ADS Study Group Mid-week Report
IEEE P Wireless RANs Date:
Spectrum Sensing Tiger Team
TGu-changes-from-d0-01-to-d0-02
September Opening Report
LB73 Noise and Location Categories
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
IEEE WG Opening Report – July 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
November Opening Report
TGr Proposed Draft Revision Notice
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
March Opening Report Date: Authors: March 2011
May 2005 CAPWAP AHC Closing Report
Liaison Report From Date: Authors: Month Year
November 2012 Opening Report
Draft P802.11s D1.03 WordConversion
Questions to the Contention-based Protocol (CBP) Study Group
January Opening Report
Advanced Beaconing Schedule and Timelines
Motion to go to Letter Ballot
EC Motions – July 2005 Plenary
TGu-changes-from-d0-04-to-d0-05
TGu-changes-from-d0-03-to-d0-04
TGu Motions Date: Authors: May 2006 May 2006
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGr Proposed Draft Revision Notice
TGp Motions Date: Authors: January 2006 Month Year
Presentation transcript:

doc.: IEEE /0116r0 Submission September 2011 Ranga Reddy, SelfSlide 1 Overview of MIB Updates September 2011 Interim IEEE P Wireless RANs Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chairhttp://standards.ieee.org/guides/bylaws/sb-bylaws.pdf Apurva Mody as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at

doc.: IEEE /0116r0 Submission Month Year Ranga Reddy, SelfSlide 2 Abstract This contribution will go over the following: 1Overview of cleanup of MIB Description in Clause 13.1 of base standard 2Layout a tentative schedule/timeline to guide TGa work items a.Possibly assign roles & responsibilities (assuming TGa officers haven’t been selected) 3Discuss options for how TGa can interface with WRAN Alliance

doc.: IEEE /0116r0 Submission September 2011 Ranga Reddy, SelfSlide 3 1. Cleanup of MIB Description in 13.1 Current Modifications are contained in DCN 22-11/107r0 –22-11/107r0 will be used during the course of TGa development Original High-level layout and organization of MIB Description provided in DCN 22-09/201r1 –We will continue to stick with this layout Cleanup actions include –Removed some redundancy in wranIfBsMib MIB group for various tables in wranIfBsCm (Configuration Management), example will be provided in later slides (4 and 5) –Removed redundancy if service-flow definition and classifier rule specification in wranIfBsSfMgmt –Moved SCM configuration under wranIfBsCm –Cleaned up several errors to keep MIB aligned with base-standard, including update of all section/table/figure references

doc.: IEEE /0116r0 Submission September 2011 Ranga Reddy, SelfSlide 4 Example of old organization of Registered Capabilities wranIfBsCpeRegCapabilityReqTable(REG-REQ) IE 1 – IE N wranIfBsCpeRegCapabilityRspTable(REG-RSP) IE 1 – IE N wranIfBsCapabilitiesConfigTable -> (Default values set by operator based on regulations) IE 1 – IE N

doc.: IEEE /0116r0 Submission September 2011 Ranga Reddy, SelfSlide 5 Example of new organization of Registered Capabilities wranIfBsCpeRegCapabilityReqTable(REG-REQ) List of RegistrationCommonIEs wranIfBsCpeRegCapabilityRspTable(REG-RSP) List of RegistrationCommonIEs wranIfBsCapabilitiesConfigTable -> (Default values set by operator based on regulations) List of RegistrationCommonIEs RegistrationCommonIEs Definition of IE 1 – IE N that can be assigned to REG- REQ/RSP

doc.: IEEE /0116r0 Submission September 2011 Ranga Reddy, SelfSlide 6 2. Tentative Schedule for TGa Work Products September 2011 Interim –Finalize PAR, get task group approved, choose task group officers, Cleanup MIB Description January 2012 Interim –ASN.1 Formatting of MIBs May 2012 – 30 days –Management primitives (not including those in 10.7 of base standard) This schedule doesn’t include anytime for slippage. If May next year is too aggressive a target recommendations (e.g. July/September 2012) are welcome. This schedule doesn’t consider time to update database interface primitives and ongoing work in IETF PAWS WG.

doc.: IEEE /0116r0 Submission September 2011 Ranga Reddy, SelfSlide 7 3. Options for how TGa can interface w/ WRAN Alliance The following is a tentative list. List (and prioritization of action items) will be have to be confirmed by.22 WG and WRAN Alliance officers –Parameter table specification from Clause 12 –Database Interface specifics –Service-flow and classifier-rule specification and configuration –Authentication and security practices and configuration –Coexistence practices and configuration

doc.: IEEE /0116r0 Submission Month Year Ranga Reddy, SelfSlide 8 References