22 nd September 2009The Impact of NANUs on RAIM Prediction1 John Wilde Director, DW International.

Slides:



Advertisements
Similar presentations
Calculating Quality Reporting Service
Advertisements

Real Time Information.
Intro to Version Control Have you ever …? Had an application crash and lose ALL of your work Made changes to a file for the worse and wished you could.
Mailer Rating National Deployment Appointment & Corporate Rating Process.
Outage Coordination Process and New Equipment 1. Introduction This presentation is intended to increase knowledge of outage coordination and NOMCR submittal.
GNSS Integrity John Wilde CEO, DW International. Agenda About DW International Basic GNSS Principles Navigation System Performance – RNP RAIM on the Ground.
Mailer Rating National Deployment Mailer Rating Review.
Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
Regional Portfolio Model Redevelopment Presentation to System Analysis Advisory Committee August 23, 2013.
Location Aware Calendar A PostPC project Elliot Jaffe, Erez Theodorou Hebrew University, 2003/2004.
Maintaining and Updating Windows Server 2008
Validity of RAIM Prediction ION ITM 2011 San Diego, CA Jan , 2011 Takeyasu Sakai Electronic Navigation Research Institute, Japan Takeyasu Sakai Electronic.
California LifeLine Weighted Average Customer Count Report Proposed Implementation.
Intel® Solid-State Drive Data Center TCO Calculator The data in this presentation is based on your analysis and business assumptions when using the Intel®
GPS Civil Interface Observations Rick Hamilton CGSIC Executive Secretariat U.S. Coast Guard Navigation Center.
THE 2nd SPACE OPERATIONS SQUADRON Capt Heather Eastlack NANUS UNCLASSIFIED.
Implementing and Administrating Redundant PI-Advanced Computing Engine (ACE) Servers Craig Taylor PI Administrator.
Ahmad Al-Ghoul. Learning Objectives Explain how to begin working in your project by Gathering Information, Determining detail tasks, Determining detail.
Programming Project (Last updated: August 31 st /2010) Updates: - All details of project given - Deadline: Part I: September 29 TH 2010 (in class) Part.
CGSIC ISC Asia-Pacific Meeting Melbourne, Australia February 2003.
Using Outage History to Exclude High-Risk Satellites from GBAS Corrections ION GNSS 2011Portland, Oregon Session C5-823 September 2011 Sam Pullen and Per.
OASIS Insights & Observations Transmission Customer Forum September 21-22, 2006 Jim Viikinsalo September 21-22, 2006 Jim Viikinsalo.
Welcome to the SARS Tax Workshop The purpose of this presentation is merely to provide information in an easily understandable format and is intended to.
Data Extracts & Reporting Recent Issues ERCOT Information Technology Data Extracts Working Group 11/27/07.
SunGuide® Software Development Project Release 4.3 Express Lanes Enhancements Design Review December 15, 2009 December 15, 20091R4.3 Design Review.
Problem Statement: Users can get too busy at work or at home to check the current weather condition for sever weather. Many of the free weather software.
Now, please open your book to page 60, and let’s talk about chapter 9: How Data is Stored.
PPMS Spring User Group Meeting 5/30/2012 Presented by Susan Engel.
2 nd GNSS Vulnerabilities and Solutions Conference Baska, KrK Island, Croatia September 3, 2009   Hank Skalski U.S. Department.
User Management. Basics SDMS shall maintain a database of all users. SDMS shall maintain a database of all users. SDMS shall not limit the number of registered.
Welcome to State of Michigan Time & Expense Processing Employee Expense Modification (No Advance) Tutorial Brought to you by the Office of Financial Management.
Information Technology Report Trey Felton Manager, IT Service Delivery September 2011 ERCOT Public.
1 Internal Use Only – Not for Distribution 2016 Walmart Program DirectHealth Agent Portal 2016 Walmart Program DirectHealth Agent Portal.
USCG NAVIGATION CENTER NAVCEN and GPS CGSIC IISC European Meeting Prague, Czech Republic 14 March 2005 Rebecca M. Casswell Chief, GPS Branch.
Health Insurance Update For School district employees Effective July 1, 2002.
Web Advisory Committee Overview CMS Project Status Update Major work underway Timelines (high level) Blogging capability Events-calendar capability.
1 eCoRepair New Release Slide Expanded view of Circuit Details Change to Circuit Looping text4 View of closed faults up to 30 days old5 - 7 Minor.
Training Presentation for:
3 rd Party Registration & Account Management SMT Update To AMWG February 23, 2016.
ShakeAlert Performance Testing System Overview CISN Testing Center (top right) retrieves a daily earthquake catalog from ANSS Data Center (bottom right)
Differential GPS An Introduction. How does it work.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Subscription and Notification Issue Group Name: WG2 Source: Qi Yu, Mitch Tseng- Huawei Technologies, Co. LTD. Meeting Date: ~23 Agenda Item:
Maintaining and Updating Windows Server 2008 Lesson 8.
Zortec Payroll. 2 In this session we will cover the basics of LGC’s Zortec Payroll System. Topics include employee master, payroll process setup and processing,
1 COR2789 Measures to Address Unregistered & Shipperless Sites October 2014.
3 rd Party Registration & Account Management SMT Update To AMWG March 22, 2016.
3. System Task Botton in Form (Uploader Function)
Lesson 19: Configuring and Managing Updates
Analysis of Network Outage Reports
Analysis of Network Outage Reports
Training Presentation for:
Under Test End Dates 1st February 2011.
John Wilde CEO, DW International
Amendment Invoice Task Force Progress Report
Alert Gateway Group (AGG)
Amendment Invoice Task Force Progress Report
Monthly Calendar Conversion Project UFS Open Forum Calls
PCS User Group Vienna, 13th September 2017.
Amendment Invoice Task Force Progress Report
Training Presentation for:
Amendment Invoice Task Force Progress Report
Analysis of Network Outage Reports
Dave Addison August 2008 Application Support Updates
Project Update Design, Build and System Test completed.
Training Presentation for:
UW WRF mbar forecasts.
Introduction Time is something we waist as a society
and Forecasting Resources
Process in CVRS to correct and/or change Voter party.
Presentation transcript:

22 nd September 2009The Impact of NANUs on RAIM Prediction1 John Wilde Director, DW International

2 Background DW maintains a database of future satellite outages for use in RAIM predictions The database is kept up-to-date automatically via subscribed GPS updates Typically these updates take the form of Forecast Outage and Unscheduled Outage type NANUs which follow a defined syntax and can be reliably parsed for DW’s internal use Other General type NANUs are free-text information updates which require manual system input 22 nd September 2009The Impact of NANUs on RAIM Prediction

3 Background RAIM predictions are typically calculated for 72 hours into the future Our systems therefore rely on the availability of the latest constellation updates as they can impact the current prediction scenario period 22 nd September 2009The Impact of NANUs on RAIM Prediction

4 Forecast Outage Example NANU details a Forecast Maintenance outage for PRN 26 from 09:30 to 21:30 on 28 th Sept 2009: NOTICE ADVISORY TO NAVSTAR USERS (NANU) SUBJ: SVN26 (PRN26) FORECAST OUTAGE JDAY 271/ JDAY 271/ NANU TYPE: FCSTMX NANU NUMBER: NANU DTG: Z SEP 2009 REFERENCE NANU: N/A REF NANU DTG: N/A SVN: 26 PRN: 26 START JDAY: 271 START TIME ZULU: 0930 START CALENDAR DATE: 28 SEP 2009 STOP JDAY: 271 STOP TIME ZULU: 2130 STOP CALENDAR DATE: 28 SEP nd September 2009The Impact of NANUs on RAIM Prediction

5 General Outage Example NANU details an outage for PRN 25 from 15:00 on 20 th August 2009 until further notice: NOTICE ADVISORY TO NAVSTAR USERS (NANU) NANU TYPE: GENERAL *** GENERAL MESSAGE TO ALL GPS USERS *** SVN25 (PRN25) FORECAST OUTAGE ON JDAY 232/1500Z UNTIL FURTHER NOTICE. GPS SATELLITE SVN 25 (PRN25) WILL BE UNUSABLE NO EARLIER THAN JDAY 232 (20 AUG 2009) BEGINNING 1500Z UNTIL FURTHER NOTICE. *** GENERAL MESSAGE TO ALL GPS USERS *** Manual intervention was required to generate a system-parsable outage type PRN 25 was subsequently removed from the Almanac 22 nd September 2009The Impact of NANUs on RAIM Prediction

6 General Outage Example Unscheduled Outage type equivalent: NOTICE ADVISORY TO NAVSTAR USERS (NANU) SUBJ: SVN25 (PRN25) UNUSABLE JDAY 232/ UNTIL FURTHER NOTICE 1. NANU TYPE: UNUSUFN NANU NUMBER: NANU DTG: Z AUG 2009 REFERENCE NANU: N/A REF NANU DTG: N/A SVN: 25 PRN: 25 START JDAY: 232 START TIME ZULU: 1500 START CALENDAR DATE: 20 AUG 2009 STOP JDAY: UFN STOP TIME ZULU: N/A STOP CALENDAR DATE: N/A 22 nd September 2009The Impact of NANUs on RAIM Prediction

7 PRN 25 – Expected Event Timeline Forecast Outage type NANU (FCSTDV/MX) issued (applying from 3pm 20 th August UFN) detailing future outage of PRN25 Forecast Summary type NANU (FCSTSUMM) issued detailing actual outage (PRN25 was set unusable UFN at 3:14pm on 20 th August) and referencing original Forecast NANU Forecast Cancellation type NANU (FCSTCANC) issued detailing PRN25 is now usable (from 12 th September) and referencing original NANU 22 nd September 2009The Impact of NANUs on RAIM Prediction

8 PRN 25 – Actual Event Summary 14 th August: GENERAL NANU received (applies from 3pm 20 th August) detailing forecasted outage UFN of PRN25 18 th August: Equivalent UNUSUFN NANU generated by DW and input into system 20 th August: GENERAL NANU received detailing that PRN25 was set unusable at 3:14pm on 20 th 21 st August: PRN 25 removed from almanac 12 th September: GENERAL NANU received detailing PRN25 usable from 12 th Sept 22 nd September 2009The Impact of NANUs on RAIM Prediction

9 Conclusion Standardisation of event reporting required Use computer readable fixed formats Leave ‘general’ free text for information Lets help one another to interpret NANUs for the user 22 nd September 2009The Impact of NANUs on RAIM Prediction

1022 nd September 2009The Impact of NANUs on RAIM Prediction