AESO Export Capability Workshop February 16, 2006 Metropolitan Centre, Calgary.

Slides:



Advertisements
Similar presentations
“Power Factor” In Transmission System
Advertisements

Project Update Late 2005 the PSANI Policy Group reviewed mitigation efforts to reduce transmission curtailments in the Puget Sound Region Late 2005 the.
Industry Brainstorm on increasing Export Capacity From Alberta to B.C. January, 2006.
1 Review of AC Circuits Smith College, EGR 325 March 27, 2006.
Using Synchrophasors for Preventing Cascading Outages
ALASKA TIDAL ENERGY CONFERENCE January 23 – 24, 2007 Ketchikan Alaska Ted Ferry Civic Center Board Room.
(x1;y1;z1)(x2;y2;z1)(x3;y3;z1)(x4;y4;z1) (x1;y1; z1)(x2;y2;z1)(x3;y3;z1)(x4;y4;z1)
Power Grid Reinforcement Fall Presentation Team 9b: – Jon Brown – Kyle Reininger – Alan Myers – Karl Homburg – Dan Sinnott.
Reliable Power Reliable Markets Reliable People Challenges and Opportunities in the Power Industry in Alberta CERI Conference October 22 & 23, 2007 Warren.
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
California Independent System Operator Soumen Ghosh CAISO CONFIDENTIAL Created: 06/15/2008 State Estimator for CA ISO Market - Relevance and Readiness.
Dynamic VAR’s [D-VAR] What are D-VAR Devices? Dynamic VARs… Fully integrated modular STATCOM with proprietary 3X overload Instantaneously injects precise.
Reliability Criteria for Bulk Power System Design Richard V. Kowalski Manager, Transmission Planning ISO New England.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
Nov Voltage Collapse in Electrical Power Systems by Zivan Zabar ECE Dept.
Chapter 12 Three-Phase Circuit Analysis
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
1 If I were to give grades today… > 80A A B B B C C C D D D-1
California Energy Commission Workshop Nuclear Power Plant Issues
Supervisory Systems.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
THE ELECTRIC SUB STATION
. Juan de Fuca Cable. Safe Harbor Statement Included in this document is certain information which is “forward looking information” as defined by the.
Review of BPA Voltage Control Conference
ELG4125 Transmission and Distribution Systems
1 Integration of Variable Generation into the Grid: Need for TVLs (Transfer Variability Limits) Gordon Dobson-Mack (Chair) Dynamic Transfer Capability.
Northern California to Pacific Northwest/Canada Transmission Line Steve Metague, PG&E February 29, 2008.
VISUALIZATION WHY WE NEED SYNCHROPHASOR TECHNOLOGY IN OPERATIONS John Ballance – EPG Presented to ERCOT Phasor Technology Workshop – November 16, 2012.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Announcements Please read Chapter 4 HW 1 is due now
Power Application Software UPDEA - Workshop. What are Power Application Tools? Name as many of the Power Application Tools as you can Power Application.
Cigre B5 – 06 Working Group Presentation Protection and Control Asset Program Management John Robertson March 25, 2008.
Reliability Requirements Bill Blevins Manager of Operations Support ERCOT.
Review 1. Review of Phasors Goal of phasor analysis is to simplify the analysis of constant frequency ac systems: v(t) = V max cos(  t +  v ), i(t)
Power System Fundamentals EE-317 Lecture 3 06 October 2010.
Do now: Finish these sentences 1)Electromagnetic induction is... 2)Electromagnetic induction is used for... Hātarei, 24 Whiringa-ā-nuku 2015 The conversion.
SIMPLE TRANSMISSION OUTAGE. Nodal Protocol Definition 2.26 Simple Transmission Outage A Planned Outage or Maintenance Outage of any Transmission Element.
© Property of ERCOT 2001 ERCOT Limit Calculation Process John Adams Operations Engineer.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Do now: Finish these sentences 1)Electromagnetic induction is... 2)Electromagnetic induction is used for... Paraire, 4 Hakihea 2015 The conversion of.
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
CIP Version 4 The Basics. CIP Version 4- Background Centers around expanded criteria for Critical Assets – FERC thought Risk Based Methodologies used.
Announcements Please read Chapters 1 and 2
Yellowhead Area Transmission System Development
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
THE POWER OF POSSIBILITY AESO current limits for Alberta-BC transfers Jeff Palermo – KEMA/AESO.
Dynamic Transfer Limits Study WIST Update 12/17/09 Brian Tuck, BPA.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Microgrid Load Management and Operation Erich Keller G&W Electric Co. Frank Patton Jr., PE N. J. Shaum & Son, Inc.
Wind Operations Task Force Overview for ROS Jan 2009 mtg: WOTF is continuing work on issues #1a/b/c, 1d, 3e, and 5. The WOTF makes no recommendation to.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
FACTS BY SVC, FLEXIBLE AC TRANSMISSION
Risk Assessment and Probabilistic Transmission Planning Methods
Presented by: LADWP November 14, 2017
Project WECC-0100 Update Load Modeling Task Force
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
POWER SYSTEM ANALYSIS INTRODUCTION.
BPA RAS Misoperations 11/2016, 6/19/2017 and 6/21/2017
HVDC Transmission Systems:
TONBRIDGE POWER GREEN LINE
BPA RAS Misoperations 11/2016, 6/19/2017 and 6/21/2017
Project WECC-0100 Update Load Modeling Task Force
FACTS BY SVC, FLEXIBLE AC TRANSMISSION
Presentation transcript:

AESO Export Capability Workshop February 16, 2006 Metropolitan Centre, Calgary

AB to BC Transfer BCTC perspective Calgary, Alberta - Feb 16, 2006

Feb. 16, 2006Page 3 The BC Transmission System Snapshot: 18,000 km circuit transmission lines 287 switching, distribution and capacitor stations Control Centers 1 System Control Center 4 Area Control Centers 244 microwave and repeater sites Transmission rights-of-way Interconnected to Alberta and the Pacific Northwest for over three decades

Feb. 16, 2006Page 4 The BC Transmission System

Feb. 16, 2006Page 5 BCTC Bulk Transmission System Overview (export to US) NIC SEL KLY REV WSN MCA CBK ACK VAS GMS/PCN LM & VI SEL area gen 5L92 5L94 5L91 5L965L98 5L81 & 5L82 5L51 & 5L52 5L87 5L76 & 5L79 2L112 BPA

Feb. 16, 2006Page 6 BCTC Bulk Transmission System Overview (import from US) NIC SEL KLY REV WSN MCA CBK ACK VAS GMS/PCN LM & VI SEL area gen 5L92 5L94 5L91 5L965L98 5L81 & 5L82 5L51 & 5L52 5L87 5L76 & 5L79 2L112 BPA

Feb. 16, 2006Page 7 Transmission Line Forced Outage (3 pole) Approx Data Notes: 1.SPR provided in late SPR provided in mid SPR to be provided in SPR provided in Include sequential ctgs in less than 5 minutes 6.* SPR provided 500kV Lines Circuit Length (km) 3 Phase forced outagesData Years Forced outage per year 5L76 (note 1 ) L79 (note 2) L81 * L82 * L91 (note 3) L92 * L94 * L98 (note 4) L51 & 5L52 36 / L91 & 5L98 3 (note 5) L76 & 5L L81 & 5L L1/2/3/4/7 double contingenciesapprox L11/12/13 double contingenciesapprox

Feb. 16, 2006Page 8 BCTC RAS RAS arms generation shedding, line tripping, reactive equipment switching, and calculates transfer limits RAS armed in real time dynamically RAS arming based on actual flows TSA runs every 4 minutes TSA arms RAS RAS armed automatically

Feb. 16, 2006Page 9

Feb. 16, 2006Page 10 Questions?